₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,147 members, 8,448,859 topics. Date: Monday, 20 July 2026 at 11:29 PM

Toggle theme

Please I Need Help With My 4 Flats Project Located At Benin City - Properties - Nairaland

Nairaland ForumNairaland GeneralPropertiesPlease I Need Help With My 4 Flats Project Located At Benin City (598 Views)

1 Reply (Go Down)

Please I Need Help With My 4 Flats Project Located At Benin City by sunshi(op): 3:16pm On Dec 26, 2018
My junior brother is currently handling it, but I only just found out that he has been eating my money. Please I need an engineer who can supervise it. The whole process has taken so much money already. I spoke to ChekitAut who is in to selling of building materials and he advice me to post here and I will see members who will be willing to help, he also said my brother has done a very bad job you can see it from the first picture uploaded here. Just have a look at the quotes my brother sent to me. The last quote for decking made me to reconsider the whole process and I was thinking of stopping the project until I met chekitaut online. Please have a look at the quote!
Lintel
122 rod(#2,000)-#244,000
Iron bender- #40,000
Sand (1) trip- #20,000
60 Steel rope(#500)-#30,000
Binding wire - #10,000
60 Plank (1,350)- #81,000
12 2by3 (#800)-#9,600
3 inches nail - #7,500
4 inches nail -#7,500
36 1by6 (#800)-#28,800
Cement 65bags(2,500)-#162,500
Pouring -#72,000
Total- #698,700 I have sent the money for this
The quote for the decking is outrageous that was why I was considering stopping the project
Estimate for the decking.
170 plank(2,350)-#399,500
200 bamboo (250)-#50,000
50 1 by 6-(#1,175)-#58,750
200 2by 3(#800)-#160,000
4 inch half nail-#4000
3 inches half nail-#4000
2 inches half nail-#5000
Carpenter-#135,000
Pouring-#130,000
Cement 220bag(2,500)-#550,000
380 12mm rod(#2,000)-#760,000
35 16mm rod(#3,600)-126,000
30 quarter rod(#500)-#15,000
Granite 3 trips -#270,000
Sand 4 trips -#80,000
Total-#2,847,250

I will be glad if anyone here in this forum can be of help.
I wish you all a Merry Christmas and a prosperous new year

Re: Please I Need Help With My 4 Flats Project Located At Benin City by daddytime(m):
Hmmm...

If you hadn't embarked on this project already i'd have advised you against it honestly.

This popular idea of four flats for tenement in Benin is a huge misnomer my brother and i call it tying down of funds.

When you sum up the total amount you'd have spent putting up the building and then compare with the expected returns, you'd understand where I am driving at. Mind you, the guarantee that your four flats will be always occupied annually is equal to zilch.

Now think about the location of your proposed investment and the going rate of rentals there. Do you see yourself breaking even in the next 10 years or any significant appreciation to your property within this time frame, if yes at what %?

This idea of four flat is a mistake a whole lot of us had made in the past and many more still make the mistake. We need to learn to think out of the box and seek out other ways to invest our monies.

You need to come to Benin to see 'houses to let' all over...people are building their personal cubicles to stay on a daily.

A project like this is advisable in Lagos and Abuja.

I am presently in Abuja for the Yuletide and just paid for an Apartment a 2 Bedroom for 1 Million Naira on the outskirts ooo mind you. In some areas that could have been 1,5-2 Million depending on the aesthetics of the building.

I have a place in Benin too and could help you compare prices whenever I can if you want, but be careful how you deal with your brother or having someone else take over from him. He won't be happy and might wanna cause that person harm for robbing him of his ATM.

Congratulations bro and I pray for more legitimate blessings to enable you complete your project.

It is laudable.
Re: Please I Need Help With My 4 Flats Project Located At Benin City by sunshi(op): 3:36pm On Dec 26, 2018
Here is the building plan
Re: Please I Need Help With My 4 Flats Project Located At Benin City by Chekitaut: 5:15pm On Dec 26, 2018
sunshi:
My junior brother is currently handling it, but I only just found out that he has been eating my money. Please I need an engineer who can supervise it. The whole process has taken so much money already. I spoke to ChekitAut who is in to selling of building materials and he advice me to post here and I will see members who will be willing to help, he also said my brother has done a very bad job you can see it from the first picture uploaded here. Just have a look at the quotes my brother sent to me. The last quote for decking made me to reconsider the whole process and I was thinking of stopping the project until I met chekitaut online. Please have a look at the quote!
Lintel
122 rod(#2,000)-#244,000
Iron bender- #40,000
Sand (1) trip- #20,000
60 Steel rope(#500)-#30,000
Binding wire - #10,000
60 Plank (1,350)- #81,000
12 2by3 (#800)-#9,600
3 inches nail - #7,500
4 inches nail -#7,500
36 1by6 (#800)-#28,800
Cement 65bags(2,500)-#162,500
Pouring -#72,000
Total- #698,700 I have sent the money for this
The quote for the decking is outrageous that was why I was considering stopping the project
Estimate for the decking.
170 plank(2,350)-#399,500
200 bamboo (250)-#50,000
50 1 by 6-(#1,175)-#58,750
200 2by 3(#800)-#160,000
4 inch half nail-#4000
3 inches half nail-#4000
2 inches half nail-#5000
Carpenter-#135,000
Pouring-#130,000
Cement 220bag(2,500)-#550,000
380 12mm rod(#2,000)-#760,000
35 16mm rod(#3,600)-126,000
30 quarter rod(#500)-#15,000
Granite 3 trips -#270,000
Sand 4 trips -#80,000
Total-#2,847,250

I will be glad if anyone here in this forum can be of help.
I wish you all a Merry Christmas and a prosperous new year
pls post here
https://www.nairaland.com/2550211/general-topic-thread-to-discuss-anything/1085
Re: Please I Need Help With My 4 Flats Project Located At Benin City by Dremca(m): 5:39pm On Dec 26, 2018
Contact Spyder880, he is a reputable fellow and has built so many houses for people on this forum.
sunshi:
My junior brother is currently handling it, but I only just found out that he has been eating my money. Please I need an engineer who can supervise it. The whole process has taken so much money already. I spoke to ChekitAut who is in to selling of building materials and he advice me to post here and I will see members who will be willing to help, he also said my brother has done a very bad job you can see it from the first picture uploaded here. Just have a look at the quotes my brother sent to me. The last quote for decking made me to reconsider the whole process and I was thinking of stopping the project until I met chekitaut online. Please have a look at the quote!
Lintel
122 rod(#2,000)-#244,000
Iron bender- #40,000
Sand (1) trip- #20,000
60 Steel rope(#500)-#30,000
Binding wire - #10,000
60 Plank (1,350)- #81,000
12 2by3 (#800)-#9,600
3 inches nail - #7,500
4 inches nail -#7,500
36 1by6 (#800)-#28,800
Cement 65bags(2,500)-#162,500
Pouring -#72,000
Total- #698,700 I have sent the money for this
The quote for the decking is outrageous that was why I was considering stopping the project
Estimate for the decking.
170 plank(2,350)-#399,500
200 bamboo (250)-#50,000
50 1 by 6-(#1,175)-#58,750
200 2by 3(#800)-#160,000
4 inch half nail-#4000
3 inches half nail-#4000
2 inches half nail-#5000
Carpenter-#135,000
Pouring-#130,000
Cement 220bag(2,500)-#550,000
380 12mm rod(#2,000)-#760,000
35 16mm rod(#3,600)-126,000
30 quarter rod(#500)-#15,000
Granite 3 trips -#270,000
Sand 4 trips -#80,000
Total-#2,847,250

I will be glad if anyone here in this forum can be of help.
I wish you all a Merry Christmas and a prosperous new year
Re: Please I Need Help With My 4 Flats Project Located At Benin City by bixton(m): 5:40pm On Dec 26, 2018
sunshi:
My junior brother is currently handling it, but I only just found out that he has been eating my money. Please I need an engineer who can supervise it. The whole process has taken so much money already. I spoke to ChekitAut who is in to selling of building materials and he advice me to post here and I will see members who will be willing to help, he also said my brother has done a very bad job you can see it from the first picture uploaded here. Just have a look at the quotes my brother sent to me. The last quote for decking made me to reconsider the whole process and I was thinking of stopping the project until I met chekitaut online. Please have a look at the quote!
Lintel
122 rod(#2,000)-#244,000
Iron bender- #40,000
Sand (1) trip- #20,000
60 Steel rope(#500)-#30,000
Binding wire - #10,000
60 Plank (1,350)- #81,000
12 2by3 (#800)-#9,600
3 inches nail - #7,500
4 inches nail -#7,500
36 1by6 (#800)-#28,800
Cement 65bags(2,500)-#162,500
Pouring -#72,000
Total- #698,700 I have sent the money for this
The quote for the decking is outrageous that was why I was considering stopping the project
Estimate for the decking.
170 plank(2,350)-#399,500
200 bamboo (250)-#50,000
50 1 by 6-(#1,175)-#58,750
200 2by 3(#800)-#160,000
4 inch half nail-#4000
3 inches half nail-#4000
2 inches half nail-#5000
Carpenter-#135,000
Pouring-#130,000
Cement 220bag(2,500)-#550,000
380 12mm rod(#2,000)-#760,000
35 16mm rod(#3,600)-126,000
30 quarter rod(#500)-#15,000
Granite 3 trips -#270,000
Sand 4 trips -#80,000
Total-#2,847,250

I will be glad if anyone here in this forum can be of help.
I wish you all a Merry Christmas and a prosperous new year
The pix of the building you posted is not quite clear and the design plan is without dimensions.
You'll need to upload a more clear pix of both for one to run a quote.
Re: Please I Need Help With My 4 Flats Project Located At Benin City by bioman: 6:04pm On Dec 26, 2018
If the picture above is the prototype, then this estimate is inadequate. I am currently handling mine, a 3 bedroom duplex and I can say authoritatively that paper work does not translate to reality.
Re: Please I Need Help With My 4 Flats Project Located At Benin City by Redman44(m): 9:47pm On Dec 26, 2018
@ Sunshi, building in Nigeria is a very stressful business. It seems you reside abroad, which is the reason why your brother is supervising the project for you. You will need to conduct your own research on the sale of building materials and ask a lot of questions on Nairaland. Your brother will also try to make something for himself out of the Project by looking for cheap labour especially. God has placed you in a position to have money for this Project and I bet you have a job that pays well abroad where you reside. It is good that you are even building without waiting to be in Nigeria by yourself. Time is Money. Leave space for little inflation of prices of building materials by the person handling the project for you. They have their own needs and wants to sort out cool cool cool cool cool As long as they are not inflating prices to the high heavens.

Just pray that God keeps providing the money to complete the project for you. If you say you want 100% accountability from your brother, you are only deceiving yourself. Just make sure you complete your project in good time. I pray God will continue to bless you with Money to complete this Project. Amen.
Re: Please I Need Help With My 4 Flats Project Located At Benin City by Bimpsyyyyy: 11:13pm On Dec 26, 2018
sunshi:
My junior brother is currently handling it, but I only just found out that he has been eating my money. Please I need an engineer who can supervise it. The whole process has taken so much money already. I spoke to ChekitAut who is in to selling of building materials and he advice me to post here and I will see members who will be willing to help, he also said my brother has done a very bad job you can see it from the first picture uploaded here. Just have a look at the quotes my brother sent to me. The last quote for decking made me to reconsider the whole process and I was thinking of stopping the project until I met chekitaut online. Please have a look at the quote!
Lintel
122 rod(#2,000)-#244,000
Iron bender- #40,000
Sand (1) trip- #20,000
60 Steel rope(#500)-#30,000
Binding wire - #10,000
60 Plank (1,350)- #81,000
12 2by3 (#800)-#9,600
3 inches nail - #7,500
4 inches nail -#7,500
36 1by6 (#800)-#28,800
Cement 65bags(2,500)-#162,500
Pouring -#72,000
Total- #698,700 I have sent the money for this
The quote for the decking is outrageous that was why I was considering stopping the project
Estimate for the decking.
170 plank(2,350)-#399,500
200 bamboo (250)-#50,000
50 1 by 6-(#1,175)-#58,750
200 2by 3(#800)-#160,000
4 inch half nail-#4000
3 inches half nail-#4000
2 inches half nail-#5000
Carpenter-#135,000
Pouring-#130,000
Cement 220bag(2,500)-#550,000
380 12mm rod(#2,000)-#760,000
35 16mm rod(#3,600)-126,000
30 quarter rod(#500)-#15,000
Granite 3 trips -#270,000
Sand 4 trips -#80,000
Total-#2,847,250

I will be glad if anyone here in this forum can be of help.
I wish you all a Merry Christmas and a prosperous new year
U need a good engineer to finish the work n if there are correction will do it for you, the deed have been done,just move forward ,u can whatspp an engineer on 09069193297 or 07051805606
Good luck
Re: Please I Need Help With My 4 Flats Project Located At Benin City by YovvInteriors(m): 11:46pm On Dec 26, 2018
While you all are here, for POP Ceiling and Wall Screeding, Arc and Pillar pop design works, kindly contact us at YOVV INTERIORS on 09026657977 (Call or WhatsApp).

Thanks
1 Reply

Naze Owerri Multi Flats Project. DELIVERED17 Years Long Lease Project Located In The Heart Of Lagos; IKEJAMy 4 Year Project Adventure In Nigeria234

About Homeland Interior Design!Building For Sale In Ilorin30plots Of Land (i.e 5acres) With C Of O Title At Sangotedo Lekki