| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by ashjay001(m): 1:16pm On Dec 30, 2018 |
AutoReportNG:Issokay. Didn't sound like dat sha. I hope dey've found a solution to all d criminal attacks on them? |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by subcbouy: 1:22pm On Dec 30, 2018 |
Continuity of past projects is all that matters now! Good job baba |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by BillgatesMaigad(m): 1:24pm On Dec 30, 2018 |
Infrastructure is very critical to Nigerias growth Power Ramains a huge challenge however now that the federal government has revamped the delta rail line connecting kogi state, the federal government should revamp the delta steel industry plus Ajaokuta steel and build an independent power plant to power these asset to grow the GDP |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by MrCaesar: 1:26pm On Dec 30, 2018 |
The color is poo |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Princedapace(m): 1:28pm On Dec 30, 2018 |
somehow:God forbid, in the USA, Buhari can not even be allowed to contest for least political position.. The man is too out of reality. Like Buhari counted security as part of his achievement.. Hahahaha. Since civil war, we have not lost the number of security personnels we lost just this year alone.. |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Nobody: 2:23pm On Dec 30, 2018 |
KPEKPEKPE:I worked at Itakpe Buhari should be honest and tell us who built that rail line and what it was meant for. . QED. |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Aghomi83: 2:25pm On Dec 30, 2018 |
They lied i stay in Warri, my wife passed through it two weeks back work not completed. but just on course. |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by somehow: 3:05pm On Dec 30, 2018 |
Oga answer my question! Princedapace: |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Kennydoc(m): 3:51pm On Dec 30, 2018 |
kolaaderin:Oga, PDP built these infrastructures from the scratch. Did you read that the rail line was originally built for freight? Jonathan stuck to the original plan, but Buhari quickly ran and commissioned it for campaign purposes. We all saw how the PH terminal has not been opened up for use cos Buhari's government quickly commissioned it for campaign. The more APC commissions these projects, the more they are telling Nigeria that the past PDP government (especially Jonathan's government) tried to move Nigeria forward infrastructurally. |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by kolaaderin: 4:55pm On Dec 30, 2018 |
Kennydoc:Shut up man. Why are we not have pictures and videos like this during GEJ era. Nothing was done then simple . |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Kennydoc(m): 5:05pm On Dec 30, 2018 |
This particular rail line had been completed long before Jonathan sef. It was not put into use because the primary reason why it was initiated was for freight between Ajaokuta steel plant and Warri plant and seaport. Buhari's government decided to turn it to passenger rail, which isn't a bad thing actually. The only thing this government is having to do is building rail stations. Kaduna to Abuja rail line was finished before Jonathan handed over. Buhari only had to complete the rail stations. Abuja metro rail was also nearly finished before handover. PH and Abuja International terminals were completely paid for before handover. If you went to Abuja Airport as at 2015, you would have seen the new Abuja terminal already being constructed. If Jonathan had remained in power, he would have commissioned these projects except for this Itakpe - Aladja rail line, mainly because PDP decided to stick to the original plan for that rail line, and since Ajaokuta plant hasn't come to life, the rail line remains useless (based on it's original purpose). kolaaderin:You didn't have pictures during Jonathan's government cos he didn't run a government of propaganda. APC runs a government of propaganda, and that's why they would commission a new terminal that wasn't even ready just for political campaign purposes. Even this rail line commissioning is also simply for campaign purposes, otherwise you ask yourself how many passengers commute between Aladja and Itakpe for this rail line to have been a priority? Why the rail line links 2 unpopular towns is because it's not originally for passenger purposes. If it was, it would have been built to link 2 popular and highly populated towns or cities (just like the Abuja - Kaduna standard gauge built by Jonathan or the Lagos - Ibadan standard gauge being built by Buhari). |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Baselm: 6:07pm On Dec 30, 2018 |
Henitan24:Thank you ma'am |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by duwdu: 9:46pm On Dec 30, 2018 |
olujastro:Amen! ........ P34c3 ..... ... |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by otokx(m): 12:28am On Dec 31, 2018 |
sharonejiks:Nothing per se, they said Itakpe ~ Warri, now we are hearing uromi, agbor, etc Hope it's not a media test running or commissioning like PH Airport? |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by marvinsync(m): 2:44am On Dec 31, 2018 |
OmoEpe:I see |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by Nobody: 8:28am On Dec 31, 2018 |
otokx:Okay.the rail cuts across agbor, dats why. |
| Re: Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos by otokx(m): 6:28pm On Aug 26, 2019 |
What is new? Was it a media jamboree? |
Video Of Trains Being Test Run On The Red Line Tracks In Lagos. • Lagos State Begins Test Run Of Lagos Ferry Boats - Photo • Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway • 2 • 3 • 4
Onne Sea-port: 20 Things To Know About Nigeria's Best Run Sea Port • Can I Relocate To Another State With This? • Trains Built For Milwaukee-Madison High-Speed Rail Line Are Coming To Lagos