₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,327,469 members, 8,431,193 topics. Date: Sunday, 21 June 2026 at 10:15 PM

Toggle theme

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1366) - Nairaland

Nairaland ForumNairaland GeneralPropertiesGeneral Topic Thread-To Discuss Anything And Everything in Building Construction (6183625 Views)

1 2 3 ... 1363 1364 1365 1366 1367 1368 1369 ... 3985 Reply (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 12:31pm On Apr 16, 2020
dbshaywhy:
Thanks bro, it's actually a round beam and d total area to b covered is 299ft and 7 pillars... Though we priced it n d carpenter is requiring 65k last ń iron bender 20k(to bend 37 lengths of 12mm)... Hope its all still fair.
Get other carpenter
Ask the carpenter the cost for wood work for a root
Tell him your last bus stop is 35k
iron bender-Welder price for 12k
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by money121(m): 1:23pm On Apr 16, 2020
Roofing Thread Hit 260k+ Views today on Number 1 Forum (https://www.nairaland.com/3364135/roofing-sheets-cost-various-types) in African and Pop up daily on Google Search Engine
Big thanks to all my potential Client's here in Nigeria & Abroad.. Hav vow to stay Positive and maintain my Legit Way!!
No 1 Top Roofer In Nigeria

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 2:19pm On Apr 16, 2020
dbshaywhy:
Thanks bro, it's actually a round beam and d total area to b covered is 299ft and 7 pillars... Though we priced it n d carpenter is requiring 65k last ń iron bender 20k(to bend 37 lengths of 12mm)... Hope its all still fair.
Iron bender's quote is OK. As for the carpenter, I think you should get another carpenter or two others to compare.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by TCRC: 8:05pm On Apr 16, 2020
Nice Thread
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cooljuman: 8:33pm On Apr 16, 2020
I'm currently building a one story building, we're on Iintel stage. The building is one unit of 1 bedroom and 1unit of self contained. What is the fair price for iron bender and carpenter. The wood and iron will be bought by me. There're 14 pilers.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebowalepeter: 10:23pm On Apr 16, 2020
Braviant Pro Limited is a registered company that specializes in Interior decoration designs with the use of modern board technology which 100% durable and reliable than the known POP concept.

We specializes in office partitioning and also general home designs.

We are open to receiving projects across states in Nigeria

Our services are affordable and our designs are unique.

Contact us today on +234 702 637 5588 or via email on

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 11:49pm On Apr 16, 2020
Check out this project we did for a Nairaland client. It's amazing


https://www.youtube.com/watch?v=3uhG1C4i7Ok

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m):
Nosa111:
Working on a budget! Will 3M be enough to build up 3 bedroom and 2 room self contain to lintel level??
See nobody can give you an accurate answer, because we don't know the condition of your site and some other details, you can share your building plan here i.e if you have one to start with and the condition of your site, mostly the slope, type of soil, location, size and some natural features, with all this we can give you a rough estimate or Better still save yourself the stress and get a Quantity Surveyor,

But from experience, such amount of money will most likely push your project to Lintel Level ....
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 12:02am On Apr 17, 2020
uhuns:
100% academically correct.
but for practical/financial estimate, use bulk densities for backfills.

the actual answer is slightly higher.
noted, thanks boss grin
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 12:11am On Apr 17, 2020
Emmycool85:
Please I need help. My mason is billing me 50k to set block, plaster and deck a soak-away measuring 10*8*10 and two 3*3*4. Is this price reasonable or too much? Also, how much should I be budgeting to plaster a four bedroom bungalow in and out as well as the fence.

Thanking you in advance
according to the dimension above, the 250block is accurate and the cost of setting 250block is around 12500..
So for the plastering and decking you can pay him 15k for that...


It should not be more than 30k at most, if he is not ready to do it, get another Bricklayer and tell him the amount you will pay him for such work

Setting of Block + plastering and casting of Slab = 30k

Don't allow anybody to rip you off o
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 12:14am On Apr 17, 2020
boyestic:
Screeding or floor tiles,which one comes first please?
If it's walls screening, install your Tiles before wall screening but make sure you cover your Tiles with nylon during the wall screeding
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 1:02am On Apr 17, 2020
Hargbo:
If it's walls screening, install your Tiles before wall screening but make sure you cover your Tiles with nylon during the wall screeding
thank you
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Gooddoorman: 3:51am On Apr 17, 2020
I AM STILL SUPPLYING ALUCOBOARDS
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Bankyshinani(m): 6:44am On Apr 17, 2020
uhuns:
100% academically correct. but for practical/financial estimate, use bulk densities for backfills.
the actual answer is slightly higher.
Can you explain what is laterite bulk density and backfill?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m):
GoodFaith:
Get other carpenter
Ask the carpenter the cost for wood work for a root
Tell him your last bus stop is 35k
iron bender-Welder price for 12k
Morning GoodFaith,
If am not mistaken, he said the carpenter is bringing his own wood.... And he's also doing an all round lintel plus about 7 columns for 50k...

dbshaywhy:
Thanks bro, it's actually a round beam and d total area to b covered is 299ft and 7 pillars... Though we priced it n d carpenter is requiring 65k last ń iron bender 20k(to bend 37 lengths of 12mm)... Hope its all still fair.


Urgent response needed
A carpenter went to inspect my 1 unit 3 bedroom flat and 2 units room and parlour self contained so as to gv his bill for the lintel work. So he eventually charged 100k(will bring planks himself)... That a 3 bedroom flat is been charged 50k...please house is ds nt on d high side?
Morning dbshaywhy,
Be fair to the carpenter, he'll pay to transport the wood to site and pay to pack it. You're not buying wood and yet he wld pay his workmanship.

That price is fair.... Whether it is 50k or 65k...

Maybe you should start by calculating how much wood he wld use.

Goodluck.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:01am On Apr 17, 2020
Morning Nosa111,

It's great you want to build... Congrats.

I've seen a couple of response to your questions, but some are already misleading.

I'll advice you to read a lot here on Nairaland, there have been great threads created in this regard by myself and a few others.

Everything you need is here, start by reading widely.

Goodluck.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 8:18am On Apr 17, 2020
Nosa111:
Good morning house! I am a newbie here. What are the first things to do before starting to put up a structure??
I am ready to offer consultation as regards your Structure at no cost, feel free to send me a DM and I will be your virtual guide
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 8:25am On Apr 17, 2020
Good morning House.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 8:28am On Apr 17, 2020
Dennis3D:
Good morning House.
you are doing well
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 10:38am On Apr 17, 2020
Hargbo:
you are doing well
Lol
Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by weyreypey: 12:21pm On Apr 17, 2020
Sehindemi. Well read. You can take it down. She's not anonymous. L is not anonymous. I am very visible. You only need to ask the right people. Stay Safe. M is doing better on our own section.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 2:18pm On Apr 17, 2020
Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 2:30pm On Apr 17, 2020
Quantity of blocks, rods to use, labour for iron bender, bags of cement. Labour for masonry. Here they charge N50 per block. I have granite at site n i go supply water.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 3:10pm On Apr 17, 2020
Hargbo:
according to the dimension above, the 250block is accurate and the cost of setting 250block is around 12500..
So for the plastering and decking you can pay him 15k for that...


It should not be more than 30k at most, if he is not ready to do it, get another Bricklayer and tell him the amount you will pay him for such work

Setting of Block + plastering and casting of Slab = 30k

Don't allow anybody to rip you off o
I doubt if he will get a good bricklayer that will accept 30k.
They charge higher when it comes to soakaways and septic tanks cos of the stress involved. Soakaways are not like normal setting of building blocks.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dannie007(m): 3:12pm On Apr 17, 2020
Where is the Location I mean state!! I will advice you introduce 2 more columns




[q1uote author=jp130 post=88543139]Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed[/quote]
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Hargbo(m): 5:04pm On Apr 17, 2020
bobkezel:
I doubt if he will get a good bricklayer that will accept 30k.
They charge higher when it comes to soakaways and septic tanks cos of the stress involved. Soakaways are not like normal setting of building blocks.
you are very much correct
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by taskcompleteng: 5:15pm On Apr 17, 2020
[b]*VANTAGE COURT, BOGIJE*

Owning an apartment has never been this easy!

*Introducing VANTAGE COURT,* BOGIJE along Lekki/Epe Expressway, Lagos.

Own unit(s) of 3 Bedroom fully detached apartment located within Richland Estate, Bogije along Lekki Epe Expressway.

Why continue to pay rent to Lagos Landlords when you can use your rent to pay for your own house?

YES! With Vantage Court, you can RENT TO OWN with mortgage facility that allows you spread payment up to 20 years!

Vantage court is designed with you in mind, to give you value for your money, while guaranteeing maximum rental income returns.

*PAYMENT PLANS:*
Outright 0-6 Months - #15m
(Fully finished- #20m).

Installment 7-12 Months - N15.5m(Fully finished-20.5m).

Installment 13-18 Months - N16m(fully finished- 21m).

*TITLE* : Governor’s Consent

*FEATURES* :
(a) Each unit comes with 3KV solar inverter (One-off payment)
(b) Drainage
(c) Green areas
(d) Street light
(e) Security
(f) Road network

*NEIGHBOURHOOD* :
Novare Mall, Shoprite
Lagos Business School
Omu Resort
Choscharis Motors
Corona Schools
Beechwood Estate

For further inquiries, inspection & payment, Call/Chat Us Up On 07061960316
Chat me up http:///2347061960316

[/b]

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by taskcompleteng: 5:16pm On Apr 17, 2020
adebowalepeter:
Braviant Pro Limited is a registered company that specializes in Interior decoration designs with the use of modern board technology which 100% durable and reliable than the known POP concept.

We specializes in office partitioning and also general home designs.

We are open to receiving projects across states in Nigeria

Our services are affordable and our designs are unique.

Contact us today on +234 702 637 5588 or via email on
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:06pm On Apr 17, 2020
Good evening.

The dimensions of the Septic tank / soak away is given as Length = 3.00m, breadth = 1.80m and depth = 3.90m (13feet) according to you. Although I seriously doubt the feasibility of your depth, I'll do justice to it nonetheless.

Estimate of materials for proposed works;
1) Excavation 21m3 @ 1000/m3 = 21,000.00
2) Columns, 4nr, size 225mm x 225mm x 3900mm depth.
- cement 6 bags
_ 12mm reinforcement 6 length
_ 10mm reinforcement 5 length
3) 225mm blockwall = 380 blocks (same quantity even if you're using 150mm block)
_ cement 4 bags
4) reinforced concrete cover and oversite concrete to the base
_ Cement 10 bags
_ 12mm Dia. Reinforcement 7 lengths
5) 25mm x 300mm x 3600mm softwood as for work 5 lengths
_ 50mm x 50mm x 3600mm bracing 4 length
6) Plastering
_ Cement 6 bags
7) Make a reasonable supply of sand.

That's the quantity of materials needed for he job based on your dimensions.

If you need cost of labour, mention me in your reply.

This is the sound advice of a professional Quantity Surveyor.

Call me for your quantity surveying services.
09012800750


jp130:
Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DFAMEGUY11S(m): 6:03am On Apr 18, 2020
Hello good morning everyone hope you all have wake , because afternoon sleep still waiting for you so wake don't sleep all now grin
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 9:30am On Apr 18, 2020
Uyo.



dannie007:
Where is the Location I mean state!! I will advice you introduce 2 more columns




[q1uote author=jp130 post=88543139]Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 9:38am On Apr 18, 2020
Gud morni sir,
On numb 2, some one suggested additional two. How do u see it?
I will b using 6" blocks(solid)
Please i will need that cost of labours, mason, n iron bender n i dnt know if carpenter is necessary because most masons do the wood work.
Thanks a million for this detailed breakdown. I am gonna be well informed now.



QSFemi:
Good evening.

The dimensions of the Septic tank / soak away is given as Length = 3.00m, breadth = 1.80m and depth = 3.90m (13feet) according to you. Although I seriously doubt the feasibility of your depth, I'll do justice to it nonetheless.

Estimate of materials for proposed works;
1) Excavation 21m3 @ 1000/m3 = 21,000.00
2) Columns, 4nr, size 225mm x 225mm x 3900mm depth.
- cement 6 bags
_ 12mm reinforcement 6 length
_ 10mm reinforcement 5 length
3) 225mm blockwall = 380 blocks (same quantity even if you're using 150mm block)
_ cement 4 bags
4) reinforced concrete cover and oversite concrete to the base
_ Cement 10 bags
_ 12mm Dia. Reinforcement 7 lengths
5) 25mm x 300mm x 3600mm softwood as for work 5 lengths
_ 50mm x 50mm x 3600mm bracing 4 length
6) Plastering
_ Cement 6 bags
7) Make a reasonable supply of sand.

That's the quantity of materials needed for he job based on your dimensions.

If you need cost of labour, mention me in your reply.

This is the sound advice of a professional Quantity Surveyor.

Call me for your quantity surveying services.
09012800750
1 2 3 ... 1363 1364 1365 1366 1367 1368 1369 ... 3985 Reply

Discuss Anything Property And Lets Make Money In The ProcessResidential Building Construction Mistakes In Nigeria You Need To AvoidGeneral Topic Thread - The Roforofo Thread Of Construction Activities234

Viewing this topic: RockOfAgesAlumi(m), jman77(m) and 1 guest(s)