General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1439) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4478436 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1436) (1437) (1438) (1439) (1440) (1441) (1442) ... (3688) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 2:27pm On Jun 24, 2020
davodyguy:

Hi.

drop your email for me to send you the dimension for windows for you to give quote.

If it is reasonable, we can deal
ok sir,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 2:33pm On Jun 24, 2020
davodyguy:

Hi.

drop your email for me to send you the dimension for windows for you to give quote.

If it is reasonable, we can deal
ariseandshine31@gmail.com
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by davodyguy: 2:52pm On Jun 24, 2020
Adedward:
ariseandshine31@gmail.com

Mail sent

I hope we can deal, if we agree on price

The street is not smiling during COVID-19 grin
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 2:53pm On Jun 24, 2020
davodyguy:


Mail sent

I hope we can deal, if we agree on price

The street is not smiling during COVID-19 grin
no probs sir, we are going to work together sir,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 2:58pm On Jun 24, 2020
davodyguy:
Roof guys in the house.

Please drop your mail to receive drawings for quote.

We are at roofing stage now, after roofing, we door doors and windows
we don't do roofing but for doors and window protectors, you can count on us. 07032fourfour6904

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 3:22pm On Jun 24, 2020
mssiah:
Is this better

Hi....
this is a ROUGH ESTIMATE using approximate values and a ground beam height of 1200mm (MINUS COMPULSORY FILLING to the footing in and out)

3.5 MILLION (send pics of the site, tag me) note: filling could be a added million.

Goodluck;

(i-say-d-fact)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by davodyguy: 3:27pm On Jun 24, 2020
michlins:
we don't do roofing but for doors and window protectors, you can count on us. 07032fourfour6904

Average cost of 3ft and 4ft doors from you would be in what range?

Got about 10 openings
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by raymondFirstborn(m): 3:38pm On Jun 24, 2020
saydfact:


Hi....
this is a ROUGH ESTIMATE using approximate values and a ground beam height of 1200mm (MINUS COMPULSORY FILLING to the footing in and out)

3.5 MILLION (send pics of the site, tag me) note: filling could be a added million.

Goodluck;

(i-say-d-fact)

N3.5m won't finish that foundation.
What parameters did you use.

5bedroom duplex On a Waterlogged land .?

Filling of the land let's say 500sqm . With the use of a payloader and compactor.would cost at least 1m.

Filling of the foundation too@1200mm high.-11 trips of 30tonnes sharp sand.

BUDGET should be N5 - 6m.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 3:54pm On Jun 24, 2020
davodyguy:


Mail sent

I hope we can deal, if we agree on price

The street is not smiling during COVID-19 grin
check ur mail now, sir, I sent something sir
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 4:00pm On Jun 24, 2020
Osagiesamuel02:
Good morning house, So a friend got this quote for the woodwork of the roofing of his project. He just recently discovered that his engineer has been steadily ripping him off by quoting excess materials up to this stage. I felt I should bring this here for proper vetting. Is the material and pricing fair enough. The king post if 14ft high. Thanks

First thing
send a second and third carpenter there for just material and labor price
Get other people to check the prices of wood for you

Don't let the contractor or carpenter buy your wood
If the roof work is in Benin Carpenter labor should be 90 to 100k
4 bags of nails for what?
I forget carpenters will be putting some of the nails in their pocket and take it home
to go sell at Lagos street useless people

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 4:15pm On Jun 24, 2020
DTorreto:
Good morning all,

Please electrical engineers in the house help me consider and analyze this list of materials for wiring a 4_bedroom bungalow. My instinct is telling me there are rip-offs embedded in it.

Please prove me wrong, thanks.
do you have a drawing? Those quantities are much

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 5:07pm On Jun 24, 2020
davodyguy:


Average cost of 3ft and 4ft doors from you would be in what range?

Got about 10 openings
the 3ft doors cost 20k_25k. The 4ft doors cost about 30_35k
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DTorreto: 5:14pm On Jun 24, 2020
topsy23:


Also, the rate provided is not among these: COLEMAN, NIGERCHIN and KABELMETAL. Price of cables prsently is more than that. Some of the rate are low compare to recent increase.


Thanks for your kind response sir, the proposed product for the work is COMETSTARR cables. What's your take on the brand please?

Thanks.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DTorreto: 5:19pm On Jun 24, 2020
twinskenny:
do you have a drawing? Those quantities are much

Thanks for your kind response sir. Yes there's a drawing but CCTV, TV and Inverter separation connections were not included in it. The decision to include those came at the last minute after the drawing.

I can send it to your WhatsApp number for your perusal, thanks.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 7:16pm On Jun 24, 2020
raymondFirstborn:


N3.5m won't finish that foundation.
What parameters did you use.

5bedroom duplex On a Waterlogged land .?

Filling of the land let's say 500sqm . With the use of a payloader and compactor.would cost at least 1m.

Filling of the foundation too@1200mm high.-11 trips of 30tonnes sharp sand.

BUDGET should be N5 - 6m.


Sir,
Rather than strike out my opinion (next time) share yours and let the OP decide which to take.

1. Building Length approx 20m, width approx 10m = volume of floor = 30m3 @ 40k / m3 = 1.2m (labour and material inclusive, rebar measured separately.

2. Approx length of ground beam = 100m, height 1.2m and thickness = 0.225mm = 27m3 = 1.08m (ditto)

3. Approx tonnage of rebar = 3.5T @ 200k = 700k + labour @ 25k per tonne = 90k = TOTAL 790K

4. Carpenter labour = 120k approx

5. lets allow 150 planks of 1by12 and a few 2x2 = 240k

ADD ALL = N3,430,000:00K

I also added that allow 1m for filling

TOTAL = 4.4Million

whatever his miscellaneous is wasn't my concern....

NOW, I'LL ASK YOU THE SAME QUESTION YOU ASKED ME:

What parameters did you use. TO GET 6M...

CC: mssiah:

i-say-d-fact
(OP only gets more accurate result if he shares his Structural drawings for height of ground beam and Rebars used)

8 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by flekky07(f): 7:39pm On Jun 24, 2020
saydfact:



Sir,
Rather than strike out my opinion (next time) share yours and let the OP decide which to take.

1. Building Length approx 20m, width approx 10m = volume of floor = 30m3 @ 40k / m3 = 1.2m (labour and material inclusive, rebar measured separately.

2. Approx length of ground beam = 100m, height 1.2m and thickness = 0.225mm = 27m3 = 1.08m (ditto)

3. Approx tonnage of rebar = 3.5T @ 200k = 700k + labour @ 25k per tonne = 90k = TOTAL 790K

4. Carpenter labour = 120k approx

5. lets allow 150 planks of 1by12 and a few 2x2 = 240k

ADD ALL = N3,430,000:00K

I also added that allow 1m for filling

TOTAL = 4.4Million

whatever his miscellaneous is wasn't my concern....

NOW, I'LL ASK YOU THE SAME QUESTION YOU ASKED ME:

What parameters did you use. TO GET 6M...

CC: mssiah:

i-say-d-fact
(OP only gets more accurate result if he shares his Structural drawings for height of ground beam and Rebars used)
Hmmm really.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mssiah(m): 7:45pm On Jun 24, 2020
saydfact:


Hi....
this is a ROUGH ESTIMATE using approximate values and a ground beam height of 1200mm (MINUS COMPULSORY FILLING to the footing in and out)

3.5 MILLION (send pics of the site, tag me) note: filling could be a added million.

Goodluck;

(i-say-d-fact)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mssiah(m): 7:47pm On Jun 24, 2020
Thanks a lot everyone I think I should budget between 6 to 6.5m
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 8:02pm On Jun 24, 2020
DTorreto:
Good morning all,

Please electrical engineers in the house help me consider and analyze this list of materials for wiring a 4_bedroom bungalow. My instinct is telling me there are rip-offs embedded in it.

Please prove me wrong, thanks.

The dude need to put gun to your head
crazy theft and arm robber
God punish the MF
Can you make a connection so I can talk to this dude that gave you the price
thunder fire him
14 of 1.5mm for what?
in a standard three bedroom flat the most is 4 or 5

2 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by erico2k2(m): 8:27pm On Jun 24, 2020
mufutau55:


My brother we will always be friends o.
I just dey pull your keg ni o.
We shall not fall to any form of COVID by the grace of Almighty. Nice to see you back.

Hajji M.
Amen and Amen ohhh
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by raymondFirstborn(m): 8:32pm On Jun 24, 2020
saydfact:



Sir,
Rather than strike out my opinion (next time) share yours and let the OP decide which to take.

1. Building Length approx 20m, width approx 10m = volume of floor = 30m3 @ 40k / m3 = 1.2m (labour and material inclusive, rebar measured separately.

2. Approx length of ground beam = 100m, height 1.2m and thickness = 0.225mm = 27m3 = 1.08m (ditto)

3. Approx tonnage of rebar = 3.5T @ 200k = 700k + labour @ 25k per tonne = 90k = TOTAL 790K

4. Carpenter labour = 120k approx

5. lets allow 150 planks of 1by12 and a few 2x2 = 240k

ADD ALL = N3,430,000:00K

I also added that allow 1m for filling

TOTAL = 4.4Million

whatever his miscellaneous is wasn't my concern....

NOW, I'LL ASK YOU THE SAME QUESTION YOU ASKED ME:

What parameters did you use. TO GET 6M...

CC: mssiah:

i-say-d-fact
(OP only gets more accurate result if he shares his Structural drawings for height of ground beam and Rebars used)

Parameters

-Young man, Labour would always cost more on a water logged land compared to dryland.

-Apart from the ground beam, you forgot to add calculation for the raft itself.
The ground beam sits on a raft.

-Apart from filling of land , what of filling of the foundation? Hardcore?

Filling of land (600mm(thick).lets say 500sqm
500 x 0.6m= 300cum x 1600 = 480,000kg/30,000
= 16trips.
16 x N60,000 = 960,000 + cost of payloader& operator N300k(Max of today's work)= N1.26m total


-Cost of labour for filling the foundation with sharp sand..
-Cost of compaction.

-What percentage did you set aside for preliminary works on the foundation?
(site storage
, borehole,
omonile,
security .etc)

-Labour would cost you more than 120k for steel works..

-Finally, there's more to building estimate, than just multiplying quantities against unit price.
Experienced builders and engineers can attest to this.

-Experience has thought me that on water logged land projects where there was no soil test done , no structural drawings. You should always Budget more for the unforseen, because so many issues would arise that has to be dealt with.
That's why I always add a percentage for contingency to all my estimates.

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by decatalyst(m): 8:41pm On Jun 24, 2020
saydfact:



Sir,
Rather than strike out my opinion (next time) share yours and let the OP decide which to take.

1. Building Length approx 20m, width approx 10m = volume of floor = 30m3 @ 40k / m3 = 1.2m (labour and material inclusive, rebar measured separately.

2. Approx length of ground beam = 100m, height 1.2m and thickness = 0.225mm = 27m3 = 1.08m (ditto)

3. Approx tonnage of rebar = 3.5T @ 200k = 700k + labour @ 25k per tonne = 90k = TOTAL 790K

4. Carpenter labour = 120k approx

5. lets allow 150 planks of 1by12 and a few 2x2 = 240k

ADD ALL = N3,430,000:00K

I also added that allow 1m for filling

TOTAL = 4.4Million

whatever his miscellaneous is wasn't my concern....

NOW, I'LL ASK YOU THE SAME QUESTION YOU ASKED ME:

What parameters did you use. TO GET 6M...

CC: mssiah:

i-say-d-fact
(OP only gets more accurate result if he shares his Structural drawings for height of ground beam and Rebars used)

Good evening.

Sorry, I need someone that can assist with Architectural drawing of a 3bed in IBADAN It is important the person is in IBADAN because I would like the person to see the existing structure (window level) first.

Please quote or send me a PM. Thanks

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by tonididdy(m): 9:02pm On Jun 24, 2020
CEOAyoStones:
My name is Ayobami. i am into granite stones business
here at Blackstone Construction company.
we supply any sizes of granite stones. NO UP FRONT PAYMENT NO PROBLEM,

1. 3/4==N2900 per ton

2. 3/8==N2900 per ton

3.1/2==N2900 per ton

4.Hard Core== N2900 per ton

5.Stone Dust==N1700
6.Stone Base==N2600

We charge by distance for truck.. we have 30tons truck, 20tons truck and 10tons. we receive payment on delivery..
do not hesitate to contact us for more information through twitter @stillayobami ..Tel:08079121097-08136794205.Thanks
Do you have these exact boys?
Destination Benin

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by tonididdy(m): 9:08pm On Jun 24, 2020
DTorreto:
Good morning all,

Please electrical engineers in the house help me consider and analyze this list of materials for wiring a 4_bedroom bungalow. My instinct is telling me there are rip-offs embedded in it.

Please prove me wrong, thanks.
Item 7 on the list proved his estimates are over exaggerated. (Two TV wires at max)

If you feel his experienced enough and you want his services.
Buy these items yourself or go with him and buy in lesser quantity than he demanded.
Watch them when they work... Ensure you have eyes on the exit of your property... Watch them enter and leave (because some of them are good at smuggling materials into nearby bushes)

GL

3 Likes 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by davodyguy: 9:17pm On Jun 24, 2020
michlins:
the 3ft doors cost 20k_25k. The 4ft doors cost about 30_35k
Great.

Hope it's the strong one. The local 'bullet' proof iron door, with double layers

What beautiful designs do you have?

You can share with me
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by armyofone(m): 9:21pm On Jun 24, 2020
Bro, hope Ibadan is treaing you well. I have questions for you please -


EgunMogaji2:
Greeting.

Looking for two things in Ibadan.

1) Someone with a small skip loader to grade some plots.

2) Someone that makes PVC windows.

Thanks.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 9:25pm On Jun 24, 2020
davodyguy:

Great.

Hope it's the strong one. The local 'bullet' proof iron door, with double layers

What beautiful designs do you have?

You can share with me
lols. I don't make bullet proof doors oh. At least not with the price range I gave you. To make bullet proof doors, you need at least 6mm pan. How many walls will be able to hold such weight.

But yes, I do make beautiful doors which are also strong and durable. I won't be able to upload pictures here cause many are more than 5mb in size. If you can WhatsApp me on the contact I dropped earlier, I can send you more pictures
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by davodyguy: 9:27pm On Jun 24, 2020
Adedward:
ariseandshine31@gmail.com
Chief, I responded to your mail.

Kindly check the dimensions well.

I hope to encourage one or two people on Nairaland.

The man that did my soil test in December, came recommended from Nairaland.

The man that did the BOQ is right here in Nairaland.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by davodyguy: 9:30pm On Jun 24, 2020
michlins:
lols. I don't make bullet proof doors oh. At least not with the price range I gave you. To make bullet proof doors, you need at least 6mm pan. How many walls will be able to hold such weight.

But yes, I do make beautiful doors which are also strong and durable. I won't be able to upload pictures here cause many are more than 5mb in size. If you can WhatsApp me on the contact I dropped earlier, I can send you more pictures

But at least thicker in Layers than those Chinese doors.

Really, why do we need bullet proof doors when I don't do drugs or 419?

God is our shield.

Would respond to your mail

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 9:49pm On Jun 24, 2020
davodyguy:


But at least thicker in Layers than those Chinese doors.

Really, why do we need bullet proof doors when I don't do drugs or 419?

God is our shield.

Would respond to your mail
definitely stronger than those Chinese doors. Most Chinese doors at the price range of 50k for single are made with 22mm pan or lighter. Some sef are made of PVC materials
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EgunMogaji2: 9:52pm On Jun 24, 2020
armyofone:
Bro, hope Ibadan is treaing you well. I have questions for you please -

There’s nowhere else I’ll rather be.

Will be glad to answer.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 10:07pm On Jun 24, 2020
No probs sir, I have sent u the quote sir, thanks
davodyguy:

Chief, I responded to your mail.

Kindly check the dimensions well.

I hope to encourage one or two people on Nairaland.

The man that did my soil test in December, came recommended from Nairaland.

The man that did the BOQ is right here in Nairaland.

(1) (2) (3) ... (1436) (1437) (1438) (1439) (1440) (1441) (1442) ... (3688) (Reply)

Viewing this topic: 2 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 80
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.