Request For Building Estimate by amakaDD(f): 3:06pm On Nov 18, 2020
Good morning Engineers and QS in the house.

Kindly help a sister with the estimate for this commercial build. Location is Lagos.

I need bulk pack figure for each stage of the contract.

Suggested breakdown could be:

1. Foundation/Substructure
2. Superstructure
3. Slab
4. Roofing
5. Mechanical/Electricals/Plumbing
6. *Finishing (Intetnal)
7. **External Finishing
8. Building Approval/community settlement

*Finishing includes _Windows, Doors, Burglar Bar, Borehole, Overhead tank, Ceiling, Balustrades etc._

**External Finishing includes _Septic tank, Interlocking tiles, Fence, Gate, Gatehouse..._

1. The build is sitting on a half plot.

2. This is expected to be a commercial project and ROI is key. So responsible cost cutting advice is welcome.

3. This is a crowdfunded project hence the need to clarify cost to non-technical members

cc: saydfact, rotech77, abdulwastecx, raymondFirstborn, KolaShangOne, spyder880, segcymoore, QSFemi etc.

Re: Request For Building Estimate by raymondFirstborn(m): 3:32pm On Nov 18, 2020
amakaDD:
Good morning Engineers and QS in the house.

Kindly help a sister with the estimate for this commercial build. Location is Lagos.

I need bulk pack figure for each stage of the contract.

Suggested breakdown could be:

1. Foundation/Substructure
2. Superstructure
3. Slab
4. Roofing
5. Mechanical/Electricals/Plumbing
6. *Finishing (Intetnal)
7. **External Finishing
8. Building Approval/community settlement

*Finishing includes _Windows, Doors, Burglar Bar, Borehole, Overhead tank, Ceiling, Balustrades etc._

**External Finishing includes _Septic tank, Interlocking tiles, Fence, Gate, Gatehouse..._

1. The build is sitting on a half plot.

2. This is expected to be a commercial project and ROI is key. So responsible cost cutting advice is welcome.

3. This is a crowdfunded project hence the need to clarify cost to non-technical members

Good afternoon, I can help you with the full cost breakdown.

Send the drawings to me on Whatsapp.
09056082348(call & WhatsApp)
raymondfubara@gmail.com
Re: Request For Building Estimate by amakaDD(f): 3:44pm On Nov 18, 2020
raymondFirstborn:


Good afternoon, I can help you with the full cost breakdown.

Send the drawings to me on Whatsapp.
09056082348(call & WhatsApp)
raymondfubara@gmail.com

Done.

Much appreciated sir
Re: Request For Building Estimate by Chekitaut: 6:18pm On Nov 18, 2020
Precise location in Lagos...?
Re: Request For Building Estimate by Chekitaut: 6:20pm On Nov 18, 2020
Foot size of the building...
Re: Request For Building Estimate by amakaDD(f): 1:57am On Nov 19, 2020
Chekitaut:
Precise location in Lagos...?

Surulere
Re: Request For Building Estimate by amakaDD(f): 2:00am On Nov 19, 2020
Chekitaut:
Foot size of the building...

Around 28m x 5.5m
Re: Request For Building Estimate by Chekitaut: 9:29am On Nov 19, 2020
amakaDD:


Around 28m x 5.5m
Carcass
Foundation @₦8m
Block set to 1st Decking @₦8m(ground floor)
Block set to 2nd Decking @₦8.5m
Block set to Roofing @₦8m
Total =₦32.5m

Finishing will cost you close to ₦35m
Re: Request For Building Estimate by peaceland(m): 10:31am On Nov 19, 2020
Please can you further break down the foundation aspect,
I find it interesting that half plot foundation will be that much.
Just for self education sir.
Thanks
quote author=Chekitaut post=96204208] Carcass
Foundation @₦8m
Block set to 1st Decking @₦8m(ground floor)
Block set to 2nd Decking @₦8.5m
Block set to Roofing @₦8m
Total =₦32.5m

Finishing will cost you close to ₦35m


[/quote]
Re: Request For Building Estimate by Chekitaut: 10:42am On Nov 19, 2020
peaceland:
Please can you further break down the foundation aspect,
I find it interesting that half plot foundation will be that much.
Just for self education sir.
Thanks
quote author=Chekitaut post=96204208] Carcass
Foundation @₦8m
Block set to 1st Decking @₦8m(ground floor)
Block set to 2nd Decking @₦8.5m
Block set to Roofing @₦8m
Total =₦32.5m

Finishing will cost you close to ₦35m


Recommend Raft foundation 1.2m height
Approx 6tons of TMT steel @₦295k/ton
3 trips of 30tons Granite @₦210k/trip
6trips of Sharp Sand@₦90k/trip
300 bags of Cement@₦3500/bag
300 1x12 @₦1600each
250 2x3 @₦450each
Binding wire 3bundle @₦8k/each
3bags Nail @₦8k./each
Filling Sand 10trips @₦90k(Sharp Sand)

Workmanship @₦800k
Supervision fee @₦500k
Re: Request For Building Estimate by peaceland(m): 2:02pm On Nov 19, 2020
Thanks greatly sir.
Really appreciate this.
Chekitaut:
Recommend Raft foundation 1.2m height
Approx 6tons of TMT steel @₦295k
3 trips of 30tons Granite @₦210k/trip
6trips of Sharp Sand@₦90k/trip
300 bags of Cement@₦3500/bag
300 1x12 @₦1600each
250 2x3 @₦450each
Binding wire 3bundle @₦8k/each
3bags Nail @₦8k./each
Filling Sand 10trips @₦90k(Sharp Sand)

Workmanship @₦800k
Supervision fee @₦500k
Re: Request For Building Estimate by Chekitaut: 1:21am On Nov 20, 2020
peaceland:
Thanks greatly sir.
Really appreciate this.
You welcome sir
Re: Request For Building Estimate by Bimpsyyyyy: 10:44am On Nov 21, 2020
amakaDD:
Good morning Engineers and QS in the house.

Kindly help a sister with the estimate for this commercial build. Location is Lagos.

I need bulk pack figure for each stage of the contract.

Suggested breakdown could be:

1. Foundation/Substructure
2. Superstructure
3. Slab
4. Roofing
5. Mechanical/Electricals/Plumbing
6. *Finishing (Intetnal)
7. **External Finishing
8. Building Approval/community settlement

*Finishing includes _Windows, Doors, Burglar Bar, Borehole, Overhead tank, Ceiling, Balustrades etc._

**External Finishing includes _Septic tank, Interlocking tiles, Fence, Gate, Gatehouse..._

1. The build is sitting on a half plot.

2. This is expected to be a commercial project and ROI is key. So responsible cost cutting advice is welcome.

3. This is a crowdfunded project hence the need to clarify cost to non-technical members

cc: saydfact, rotech77, abdulwastecx, raymondFirstborn, KolaShangOne, spyder880, segcymoore, QSFemi etc.
You can give a sister this job also, I am a female engineer will help u out cost effectively but will be paid percent for working on it , you will regret .
Re: Request For Building Estimate by Chekitaut: 10:55am On Nov 21, 2020
Not is missing
Re: Request For Building Estimate by Chekitaut: 10:56am On Nov 21, 2020
Bimpsyyyyy:

.
last sentence check
Re: Request For Building Estimate by amakaDD(f): 3:55pm On Nov 21, 2020
Bimpsyyyyy:

You can give a sister this job also, I am a female engineer will help u out cost effectively but will be paid percent for working on it , you will regret .

huh?

I assume typo.

But I reject it!!!
Re: Request For Building Estimate by topsy23: 5:15pm On Nov 21, 2020
You can contact us for your MEP design and estimate


Check out our thread

MEP installation
https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/25


Distribution boards
https://www.nairaland.com/2668061/abb-distibution-board-schneider-distribution/6

(1) (Reply)

Can I Get A Nice Self-contain For N80 - N100k At Ui Area, Ibadan / Oxford International Group / Hot Properties In Osapa London

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 23
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.