Casting of the ground floor is in progress
|
Rebars to ground floor is in progress
|
It's as been 4 days ago we done with compaction of the foundation filling Laying of damp prove membrane (DPM) as done perfect with Blinding to receive reinforcement
|
Backfilling to foundation is done completely it's amazing that I couldn't buy a single trip of filling sand The entire foundation was fill up with excavated materials acquired from the pile cap And it's well compacted
|
Removing of the ground beam formwork taking place ahead of back filling of the foundation
|
We are been working very hard to get the foundation right for the past month and thank we are moving closer to the positive results just exactly as we planned it to be Casting of the ground beam is done successfully with grade 30kn/m³ according to the structural engineer description After this stage we are moving to back filling in the foundation to make up level . There's is a room for questions and business contact me on 08033925673,08087141253, and email royalconstructionengineering1@gmail.com
|
surveyor has an important role to play on site such as setting out the building point,pile carp point, columns location, setback I have surveyor on site to get all those things done There's some tasks need to start on before finishing of pile cap,such as blinding in some part that's ready Blinding to receive ground beam as commence in some area of block A,and Shuttering to ground beam is also in place
|
The whole pile cap has been cast with good vibrator
|
Casting of the pile caps
|
It's been some weeks working hard in site to bring out a solid and efficient foundation to resist the load of super-structure After setting blocks on the pile cap we brake the piles to the required level Then we backfill remaining space by the side of the block wall to avoid deformation during the casting of pile cap After the backfilling rebars to pile cap, fixing the reinforcement to the pile cap And locating the column point and fixed the column starter before the casting of the pile cap
|
Thanks boss |
The best way to solidify your building is to get your foundation right by go through the virtue process Check the strength of the pile with wave method the 2 weakest would be used for loading test to minimize the risk for worse case scenario Using 6" block as formwork is economical and safe from deformation
|
Dear Nairalanders, This is my first time here in nairaland, I was training by construction genius (Aventures's) popularly knows in the this platform I'm here to take us through the process of high rise residential apartment owned by popularly know developer in Lagos state God made home(GHM) we have 3 blocks which are A,B,and C. This project contain 10 floors, Ground with mezzanine floor are car park, the remaining floor contain 3 bedroom with BQ and 2 bedroom with BQ, suspended swimming pool,gym house,launch, facility management. This project is sitting on the solid pile foundation of 600 diameter well design and approved by government I'm confidently handle this project from the beginning and to the finishing stage duration of 24 months To make enquiry about getting the price and you want to invest for your future please call me or send E-mail I will respond immediately.
|