Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,153,010 members, 7,817,977 topics. Date: Sunday, 05 May 2024 at 01:16 AM |
Nairaland Forum / Rushtec's Profile / Rushtec's Posts
(1) (2) (3) (4) (5) (6) (7) (8) ... (10) (11) (12) (13) (14) (15) (16) (17) (18) (of 49 pages)
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 8:21am On Apr 28, 2017 |
I am not surprised to here all this development of feeding him fake news, this happens when you did not corporate with owners Family. I can remembered also this kindly situation happened to our sister company, when a Site engineer telling his client we can't use Stone coated for the House because ,there was No parapet. Quack engr! The owner was in abroad. .. Can you believe when Feroof Bond back was supplied to the site, the engr told the Man the roof is 0.45mm, not 0.55mm, they have to wait for another 4days after proved b4 the work commenced. I don't want to go deeper explaining the Nature of various imported roofs, cos I will hurt some people and manufacturer/importers. After 3year many roof around the man area had changed, but his building remain new, infact he gave other clients to the company. If I had added 150,000 for Harry brother the issues of leakages and 0.4mm won't came up, but I will never do that, it's against my regulations They are not talking of the wood nature, wood dt will be eaten up by termites and turned dust easily and all anomalies occurring in that building at Uyo. We saw a lot and heard a lot of atrocities going on at HARRIMAN site in Uyo. LET him come to Lagos, if they really sure of what they are saying.....fools and slow pork every where. As at last Month, the Amount spent on that Building should have done 89% of Job Cc: Lalasticlala |
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 3:13am On Apr 28, 2017 |
SEE MORE LOOK AT THE WOOD WORK BEFORE COVERED THE CANT EVEN USE COMMON FACIAL BOARD, I MANAGED FOR HIM TO HELP HIM, HE SEE ME AS ENEMY HARRY YOU WILL SEE NO PEACE FOR BELIEVING ALL THIS TRASH GIVEN BY MY HATER , U NEVER VERIFY, U KEPT PAINTING ME BLACK AMEN God please raise and afflict calamities on all my haters and my enemy HARRYMANN AND HIS PEOPLE
|
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 3:05am On Apr 28, 2017 |
Conspiracy 3 This MAN HARRY HAS MOVED FROM LEAKAGES TO I SUPPLIED 0.4MM...... I can a metcopo be made from 0.4mm and it come out of the machine normal.... OH no Harry said he brought another installer who had conspired with Harry brother and carpenter to say my roof is 0.4mm many can know the texture of each gauze by picture..... FAKE INSTALLATION TOLD HIM THIS, HE SEAT IN CANNADA, YOU BROTHERS ARE BUYING FAKE PLUMBING MATERIALS, WOOD AND DOUBLING DOUBLING THE COST BY CONSPIRING WITH EACH WORKER. You should have not spent what you have spent if u have given your House to a contractor..... Your pple go reap you to BONE. be wise MAN PLEASE THE ROOF THE COMPLAINING ABOUT
|
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 2:47am On Apr 28, 2017 |
I ADVICE HIM TO GET SOME ONE AROUND TO FIXED THE SMALL LEAKAGES, They cant take 1,500 to apply Kit and it will seal for life. I also advised him to Used the carpenter, He told me, "HE IS ANGRY because I DID NOT GIVE HIM THE ROOF JOB" Harry knows the wanted to Kill him with high cost, Planned by brother and carpenter. But they failed After Like 3 week, HARRY CHATTED ME, One leakage has turned to many leakages, some Join/lapping are leaking He gave me a Number of brick layer plastering to House about the Leakages, I called him, He explained that some places were open by physical force and not connected with Nails. I guess that angry people went and touched the Roof behind, cos they said when the called me if i did not give them Money But i told Harry, it might be wind, since since it done with soft wood, we will go fixed it Next Thursday,,,, But Harry kept blaming me Like i went their to removed the Nails AFTER I TOLD THIS MAN NEXT WEEK WE WILL GO AND RECTIFY IT, WHAT DID HE WANT, HE JUST WANT DO WHAT HE SAID HERE
|
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 2:26am On Apr 28, 2017 |
THE SOUL CALLED INLAW AND BROTHER KEPT FEEDING HARRYMANN SITTING IN CANADA WITH BAD NEW, THEY WERE ON SITE WITH MY INSTALLERS, BUT KEPT CALLING HARRY THAT IS NOT AT HOME. After the Installation was done, A huge rain fell and meet my guys on the site, No where was leaking Really if u are an installer or engineer you know How complected METCOPO will be especially if its 0.45mm. Many wont like to Use it, Use it Only when your wood work is perfect and good installer A week After installers left the site for the Job completed, Harry sent me A whatsapp Messages that a place is leaking, One place and small SEE our chats The Inlaw confirmed one Place is draining little
|
Properties / Re: Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 2:14am On Apr 28, 2017 |
Conspiracy 2 After we harry paid we moved the materials to Uyo, Two number called me Telling I want eat alone, telling me warning me of the out come. Which we are seeing and i will be showing you evidences as i proceed with these post They used ofcut wood to make the wood work, they really fake worked, that the work wont Last.... Can you imagine even the facing board was done with 2 by 2. Gutter were bend, the purline spacing is Not right. I told him all this on phone, my installer said they will do it and I trust them since they are professionals in this work. They some Adjustments, They called the carpenter to come around and drop his saw blade, as the guy were installing they were making corrections But the carpenter and harry brother was not happy, Because Job was not through them and nothing came from me YOU KNOW WHAT THEY DO ??
|
Properties / Conspiracy Btw Harrymann Brothers And Other Workers At Uyo Roof Work by Rushtec(m): 1:58am On Apr 28, 2017 |
Good day every One. Importers and some site engineers, From the Look of any kind of roofing sheets, they can deduce if inferior or superior and if 0.35mm, 0.4mm, 0.45mm and 0.55mm. U cant compared China stone coated roof that weigh more than Real Korea roof, such as Feroof, Ds, Rosa and others. the differences is far apart. Note st those customized Korea/ Newzealand roof dt fades within 7months are not from source bware. Stone coated are made from ZINC and ALUMINIUM, wc is call ALLOY. So the higher the concentration of ALU, the better the roof against corrosion and weather degradation. Pure Aluminium are lighter, flessible and maliable. But when mixed wit Zinc or other group 2 Metals, its bcoms heavier, this reduce it quality, leading to rusting and fading due to fast oxidoxidation btw the roof and moisture. THAT IS WHY MANY STONE COATED ROOF RUST AND FADE... THAT FADING U SEE, THE BROWNISH COLORE, is call surface rusting. BOZAC COIL ARE PURE ALUMINIUM, Not mixed: That's what we Supplied and installed for HARRYMANN in UYO..... Perfectly dt u can't even Notice it's of lower gauze..... I swear we are d best when comes to roofing. I HELPED THIS MAN, BUT HE WANT TO PAINT ME BLACK.....Never I will never cheat any, even if i will Loss millions. NA God they help us , enemy and hater plenty, I due meet them on sites, on emails, and social media Conspiracy 1: Harry brothers dont have my numbers, I sent my installer to UYO for the measurement and harry brother is to direct my installer to the site when get to Uyo. Note: I never called his brother before sending my Installer. After AKIN done the measurement the brother told AKIN that any body that worked here must add theirs otherwise he will Loss the JOB. Harry brother told AKIN they will Need 150,000 from us as a return, Akin replied him "my Oga wont do this". So harry brother insisted we cant get the Job then, Akin called me and explained the situation at the site OMG Harry brother called me that he wanted to discuss some issue with me, I told him I'm on the road i cant here him clearly .....After he added me on whataapp. See our chats and how I terminated him from defrauding his bother how they been doing at the site with other work.... Do you know how much they made from the work work alone Check my thread and read more how Family cheats their blood abroad. 1 Like
|
Properties / Re: . by Rushtec(m): 7:39pm On Apr 27, 2017 |
KEEP IT UP, CONTINUE TO LIE. 1 Like |
Properties / Re: . by Rushtec(m): 10:07am On Apr 27, 2017 |
DONE IN LAGOS, IKORODU. ON 20TH OF MAY, 2017. 0.55MM METROCOPO CLINT UK based and NAIRALANDER. 3BED ROOM ROOF 208SQM FLAT SHEETS 67M TRANSPORT 19,000 ACCESSORIES 19,500 LABOUR 45,000 TOTAL COST N 724,600
|
Career / Re: See How My Ex Boss Rewarded Me For Being Loyal by Rushtec(m): 5:28pm On Apr 25, 2017 |
Evidence1000:Phone addicted. Why can't u leav aside your phone in lecture hall. Olodo 1 Like |
Properties / Re: . by Rushtec(m): 7:41pm On Apr 22, 2017 |
HI good day |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 10:39am On Apr 21, 2017 |
hi pple |
Properties / Re: Aluminium Steptile 0.55 Thickness Installation And All Cost by Rushtec(m): 10:38am On Apr 21, 2017 |
...h |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 12:27pm On Apr 20, 2017 |
Hello |
Career / Re: Police Beats Man For Asking For His 2 Months Salary From His Boss(video+pics) by Rushtec(m): 6:12pm On Apr 19, 2017 |
Please can I have details |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 1:43pm On Apr 18, 2017 |
h. |
Properties / Re: . by Rushtec(m): 1:42pm On Apr 18, 2017 |
DONE IN BENIN, EDO STATE MAY 19, 2017. FACTORY ALUMINIUM VILLAGE/YANAPAJA...... LAGOS 0.45MM STUCCO LONGSPAN ALUMINIUM. 5BED ROOM ROOF 345 SQM FACIAL 23M CEILING 67M FLAT SHEETS 83M ACCESSORIES 25,000 TRANSPORT 50,000 INSTALLATION 65,000 TOTAL COST N963,800 UNIT PRICE VARIES M; means meters contact 08169498907
|
Properties / Re: . by Rushtec(m): 11:23am On Apr 17, 2017 |
ALUMINIUM ROOFING DONE Using 0.55mm At IYANA IYESI/ OBASANJO FARM AREA. OGUN DONE on APRIL 11, 2017. Client based IN SWEDEN PAID N1,393,000 ON 20TH APRIL AND WORN DONE 22ND TOTAL COST N 1,392,000 UNIT COST 2,170 ROOF: 456.3 METERS FACIAL CLADDING: 30M FLAT SHEETS: 98M ACCESSORIES N 25,500 TRANSPORT From Lagos N 20,000 INSTALLATION N 80,000 Call 08169498907 for more info BUY OUR PRODUCTS AND WORK WITH US TODAY...... THANKS AND REMAIN BLESS
|
Politics / Re: Fly Over And Road Construction In Epe, Lagos Ongoing (Photos) by Rushtec(m): 6:35pm On Apr 16, 2017 |
I see! |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 5:43pm On Apr 16, 2017 |
Hi |
Properties / Re: . by Rushtec(m): 3:11pm On Apr 16, 2017 |
NEXT PROJECT to be cover in Ayobo, Lagos. 312sqm of 0.55mm Black steptiles to be used... Soon! rushtecm@gmail.com
|
Religion / Re: Which Church Has The Best Hymn Songs by Rushtec(m): 1:19pm On Apr 16, 2017 |
Which church is d source of xtain. Then they are d best |
Properties / Re: . by Rushtec(m): 11:53am On Apr 16, 2017 |
ALUMINIUM ROOFING DONE Using 0.35mm NON Joining/Not Bundle type At UROMI Community of Edo State. DONE on APRIL 11, 2017. Client based In RUSSIA TOTAL COST N 822,632 UNIT COST 1,080 ROOF: 414.4 METERS CEILLING CLADDING 60M FACIAL CLADDING 29M FLATSHEETS 112M ACCESSORIES N 28,000 TRANSPORT From Lagos N 50,000 INSTALLATION N 80,000 DISCOUNT 15,000 Call 08169498907 for more info
|
Properties / Re: . by Rushtec(m): 11:18am On Apr 16, 2017 |
MORE PICS
|
Properties / . by Rushtec(m): 11:15am On Apr 16, 2017 |
.
|
Crime / Re: Kidnappers Arrested In Isiala Mbano In Imo State - Pictures by Rushtec(m): 12:05pm On Apr 13, 2017 |
ONLY THERE |
Romance / Re: Is It The Man That Weds The Woman Or Woman Weds Man? by Rushtec(m): 4:03pm On Apr 11, 2017 |
You are slowpoke OlajumokeBread: 5 Likes |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 10:26am On Apr 07, 2017 |
...j |
Properties / Re: Thick And Affordable Newzealand Stone Coated Steptiles In Lagos by Rushtec(m): 10:21am On Apr 07, 2017 |
good day |
Properties / Re: ALLUMINIUM Roofing Distributor And Installation In Nigeria by Rushtec(m): 11:59am On Apr 06, 2017 |
Good day |
Properties / Re: Longspan Aluminium From Lagos Done In Benin (cost Of 4bed Bungalow) by Rushtec(m): 11:48am On Apr 05, 2017 |
hu |
Fashion / Re: Young Ladies Are Viciously Insulted After Posting Make-up Free Photos by Rushtec(m): 2:30pm On Apr 04, 2017 |
if money see them, de go pretty by force! |
(1) (2) (3) (4) (5) (6) (7) (8) ... (10) (11) (12) (13) (14) (15) (16) (17) (18) (of 49 pages)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 48 |