PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 7:54am On Oct 15, 2025
Saw this question on Facebook, Should a separate soak away be dug for bathroom water and kitchen waste? That is, a soakaway for bathroom water, and another soakaway for kitchen waste.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 7:47am On Oct 15, 2025
olukaygold:
Save yourself the headache; just ask for the installer’s price per square meter.
Requesting a detailed breakdown of a quotation often leads to inflated costs and exaggerated material estimates, especially when the artisan is the one handling the purchase and you’re not familiar with the materials.
On our ongoing project, I charged my client ₦9,000 per square meter; this not only reduced her total cost but also saved her from unnecessary stress and price manipulation.
Is 9000 included with the materials, sir?

Secondly, what's the location of your current project? I would like to know if our site is also within the same location.

Thank you for your quick response.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 3:46pm On Oct 10, 2025
Is this quote moderate for a 4bedroom bungalow, including the workmanship price he gave?

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 6:25am On Oct 10, 2025
Hello, everyone.

Should a separate soakaway be dug for bathroom water and kitchen waste?

If yes, why?
If no, why?

Thanks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 3:33pm On Apr 05, 2025
topsy23:
I can give you a comprehensive list of what you can get for the first fix work. This will include the provision for the solar inverter DB. And also give a detail breakdown of all things you should be expecting in each location.

Bedroom 1
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 2
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 3
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)
2-way switch in all the bedrooms

Master Bedroom
Recess light 4
Double Socket 4
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 2
Shaver socket 1
Strip light(Ceiling design will determine that)

Kitchen
Recess light 4
Double Socket d 6
Cooker 1
15A socket 1
Tv point 1 (optional)
AC power connection 1
Water heater power connection 1

Main entrance/Kitchen Entrance
13A double socket 1 each

Sitting Room
13A double socket 5
Spot light 6
Strip/rope light (ceiling design will determine that)
Chandelier 1

Lobby/passage way
Recess light 1 or 2 (depend on the length of the area)
13A double socket 1

External wall light
Fence light

Materials
20mm pipe 18bundles (original dignity pipe of 2.8m long
25mm pipe 2bundles
20mm Couples 5pkts
25mm coupler half pkt
Male bush 2pkts
20mm 4-way box 3pkts
20mm U box 1pkt
3*6 box 7pkts
3*3 box 8pkts
6*6 adaptable box 2
4*4 adaptable box 1
Cable tie l(ong one) 1pkt

6-Way TPN distribution board for raw power 1
6-way consumer unit for the solar inverter 1
Wow! This is valuable information.

Thank you, sir.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 10:24pm On Apr 04, 2025
topsy23:
Full conduit is better as TwinsKenny said earlier. Leaving your cables inside the ceiling void without protecting is not the best
practice. Safely and Protection is very key to avoid bridging of cable(live and neutra).

Those are okay if he's buying correct materials. Let him him give you analysis of what he plan to install I. e
BEDROOM 1
Double socket 3
TV point 1
Recessed light 4
AC switch 1
Water heater connection point/ switch 1
Thank you for your efforts,sir. I'd appreciate your review of the provided quote to ensure it aligns with your initial recommendations. Could you also provide a customized quote for a standard 4-bedroom bungalow, including solar power integration and other stuff neeesed for a stand 4bedroom flat? This will greatly assist me in moving forward with the project.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 10:14pm On Apr 04, 2025
twinskenny:
For your safety kindly jettison the ideal of halve conduit go for full conduit sir

God speed
..
Thanks, sir
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 12:12pm On Apr 03, 2025
twinskenny:
For your safety kindly jettison the ideal of halve conduit go for full conduit sir

God speed
..
Thank you, sir. Regarding the quotes, do you think they're reasonable? Unfortunately, I won't be able to supervise the work in person since I'm currently out of the country.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 10:50am On Apr 03, 2025
Hello everyone, I've been a guest here for a long time, gathering valuable information that has greatly assisted me with my project.

I've decided to create an account because I need help understanding the quotes an electrician provided me.

The quotes are for both full conduit piping and half conduit piping. I've attached the quotes for your reference.

The project location is Ile-Ise Awo, Idi Ori, Abeokuta.

Thank you.