EducationRe: Waec Result Has Just Been Released by shehu6669(m): 6:48pm On Nov 02, 2020
Yes is going now just checked my sister's own.
EducationRe: Waec Result Has Just Been Released by shehu6669(m): 6:16pm On Nov 02, 2020
ozoigbondu:
Have seen my brother's own
please re confirm to us again to be sure of what you are saying.
EducationRe: Waec Result Has Just Been Released by shehu6669(m): 4:50pm On Nov 02, 2020
Thanks for the info.
ani4purity:
The uploading is going on... Soon you will be able to access the result
EducationRe: Waec Result Has Just Been Released by shehu6669(m): 2:23pm On Nov 02, 2020
Has any body seen his own, I've been checking and is still saying not available.
Hope the pin is still useful after checking more than 5 times with no result.
PropertiesRe: The Making Of The "White Penthouse" In Anambra by shehu6669(m): 12:15pm On Jul 30, 2020
spyder880:
More blocks being laid........
Thanks for the update.
PoliticsRe: DPR Suspends Import Permits Of Capital Oil, Sahara & Folawiyo by shehu6669(m): 9:11am On Dec 12, 2015
engrshakespeare:
To be biafran is now by force, dreamer grin
hmm just viewing
PropertiesRe: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by shehu6669(m): 11:35pm On Dec 06, 2015
Thank you Mr spyder for all the info pls is it necessary to fill in all the foundation blocks with concrete before casting the floor ?
PropertiesRe: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by shehu6669(m): 6:06pm On Dec 03, 2015
Mr spy can't you use the planks you use in your decking for the column?
PropertiesRe: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by shehu6669(m): 10:19pm On Nov 28, 2015
the pumping machine on the decking what is it for, thank you.
PropertiesRe: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by shehu6669(m): 7:14pm On Nov 25, 2015
Thank you Mr spider for the update pls I need more clarification on the y8 rod what is it for?
PropertiesRe: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by shehu6669(m): 7:09pm On Nov 25, 2015
Everfrank:
He has posted the plan. Check the beginning of the thread.
spyder880:
Cost updates

We bought the following materials, most will be used for the upper floor, but I will like to see them commence work on the block making of the upper floors, plus other works.

1. 100 bags of cement N1,400 x 100 = N140,000
2. 60 lengths of Y16 rods N2,150 x 60 = N129,000
3. 100 lengths of Y8 rods N700 x 100 = N70,000
4. 1 bundle of binding wire N5,000
Transport/loading N31,000
Total N375,000

Add this N375,000 to the previous balance of N2,863,581.00 = N 3,238,581.00

We are planning to buy more materials today, sand, gravel and plumbing materials and electrical piping fittings for conduit works. More pictures and cost updates later today.
spyder880:
Cost updates

We bought the following materials, most will be used for the upper floor, but I will like to see them commence work on the block making of the upper floors, plus other works.

1. 100 bags of cement N1,400 x 100 = N140,000
2. 60 lengths of Y16 rods N2,150 x 60 = N129,000
3. 100 lengths of Y8 rods N700 x 100 = N70,000
4. 1 bundle of binding wire N5,000
Transport/loading N31,000
Total N375,000

Add this N375,000 to the previous balance of N2,863,581.00 = N 3,238,581.00

We are planning to buy more materials today, sand, gravel and plumbing materials and electrical piping fittings for conduit works. More pictures and cost updates later today.
spyder880:
Cost updates

We bought the following materials, most will be used for the upper floor, but I will like to see them commence work on the block making of the upper floors, plus other works.

1. 100 bags of cement N1,400 x 100 = N140,000
2. 60 lengths of Y16 rods N2,150 x 60 = N129,000
3. 100 lengths of Y8 rods N700 x 100 = N70,000
4. 1 bundle of binding wire N5,000
Transport/loading N31,000
Total N375,000

Add this N375,000 to the previous balance of N2,863,581.00 = N 3,238,581.00

We are planning to buy more materials today, sand, gravel and plumbing materials and electrical piping fittings for conduit works. More pictures and cost updates later today.
PoliticsRe: Live Pictures From APC Campaign House by shehu6669(m): 7:53pm On Mar 31, 2015
a big congratulations to my country for this remarkable achievement.

1 (of 1 pages)