Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 8:26am On May 18, 2018*. Modified: 8:56pm On Mar 13, 2019 |
The cover page and other files |
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 5:00pm On May 17, 2018 |
fcdgrandforce: how are about 4 bedroom Cant say for now,message ur survey plan to check some certain things required.
08100452977/whatsapp |
|
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 9:32pm On May 16, 2018 |
fcdgrandforce: what are the better option, please tell me Shop cant be attached. 3Bedroom is better tho will b narrow but some aesthetic touch can be given. You can chat me on whatsapp Thanks. |
Properties › Re: Architectural Design At It Best (smart Homese) by Timtol(m): 3:49pm On May 16, 2018 |
freshpzy1: am really interested in dis please can u sen d sketch for the three floors to abiye250@gmail.com
or most preferably whats app; 08086592701 Afternoon sir, Sorry oo May I ask that what do you normally do with all those sketches you do take from nairaland architects from different threads? Just wanna know,appreciate your comment on my thread tho on the sketches given. No vex oo pls answer |
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 11:34pm On May 15, 2018 |
fcdgrandforce: sir design me simple, beautiful, standard, 5 bedroom bungalow, feat; guest toilet, living, dinning, kitchen, store, laundary, 5 bedroom all ensuite, that will fit into helf plot of land (30ft x 120ft or 9m x 36m) with space to park 1 or 2 cars, small 1 shop at front, cost price to design and build, at ajangbadi, ojo, lagos. fcdgrandforce@yahoo.com 09094850854 After it all it was considered it cant fit but. there are better options tho |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 11:24pm On May 15, 2018 |
Rubbiish: Sir are u d man on native at the back? Perhaps sir,why did you ask? |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 11:22pm On May 15, 2018 |
Rubbiish: Sir are u d man on native at the back? Not me. Only my engineer with the client's brother and one of our worker i mean one of the mason and some other people went there today. The engr confirmed the soil strength that raft foundation is best to transfer d load on. Having a tight schedule ATM and presently the engr needs to go there to know the place and confirm the foundation stuff. When I storm the site for layout shortly you will see me by God's grace in action. Thanks. |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 8:40pm On May 15, 2018 |
The estate is secured having police at the entry point cos kidnappers do operate. The estate large mehn |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 8:24pm On May 15, 2018 |
Today at ibeju Lekki. Site visitation. Using raft foundation This is the land we are transfering the load
|
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 8:19pm On May 15, 2018 |
Timtol: Files printed.
Its really bulky as a question asked @General building thread.
Will start update pix from d 2d printed work.
Sealing shortly.
Boq shortly. Considered suspended for certain issues tho uploading later.
Start upload from site visitation |
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 4:59pm On May 15, 2018 |
fcdgrandforce: sir design me simple, beautiful, standard, 5 bedroom bungalow, feat; guest toilet, living, dinning, kitchen, store, laundary, 5 bedroom all ensuite, that will fit into helf plot of land (30ft x 120ft or 9m x 36m) with space to park 1 or 2 cars, small 1 shop at front, cost price to design and build, at ajangbadi, ojo, lagos. fcdgrandforce@yahoo.com 09094850854 ok,will reach u shortly. Will need ur survey plan n if d building can fit it well. |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 11:56pm On May 14, 2018 |
Files printed.
Its really bulky as a question asked @General building thread.
Will start update pix from d 2d printed work.
Sealing shortly.
Boq shortly. |
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 11:24pm On May 14, 2018 |
More update
|
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 11:22pm On May 14, 2018*. Modified: 7:37am On Apr 02, 2020 |
[/quote]... |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 5:21pm On May 12, 2018 |
We now get 5 good masons and 30 workers. Setting out to start God's willing next week Saturday.
Stay tune. |
Properties › Re: Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 5:18pm On May 12, 2018 |
Both architectural files and structural files to be sealed next week.
We now have good quality iron bender,sound mason n workers,capenters and other things required. |
Properties › Construction Of 5bedroom Duplex With Pent/patio & Suspended 1flat@ibeju Lekki by Timtol(op): 5:13pm On May 12, 2018 |
*5BEDROOM DUPLEX WITH SUSPENDED 1BEDROOM FLAT*
Client: Nairalander
Location: Lekki Lagos.
*Building Area:* 256.33sqm *Percentage Used:* 42.64%
*GROUND FLOOR*
Entrance, Anteroom, Visitor WC, Main Lounge, Dining, Kitchen, Kitchen, Pantry, Veranda, Stairway, Laundry, Bedroom 1 ensuit, Bedroom 2 ebsuit, Lobby with window in view of the back, pool area.
*FIRST FLOOR*
Large family lounge, Toilet, Terrace, Master room ensuit with WIC, Void porch, Covered patio open to the street, Bedroom 3 ensuit, Bedroom 4 ensuit, Power house, Lobby with window in view of the back, pool area, *ATTACHED FLAT* with, Stairway at the ground level, Veranda up, Living room, Kitchen, Bedroom ensuit.
*PENT FLOOR*
Pent office, Lobby, Kitchen Patio.
|
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 4:34pm On May 12, 2018 |
Timtol: Changes after client's specifications Toor here we go in a week time. All preparation on ground. Kindly follow us on our new thread. Thanks. In case u need a building plan u can hit my line 08100452977/whatsapp |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Timtol(m): 10:56pm On May 10, 2018 |
spyder880: You must understand my pain and frustration with the system. I have lived and worked here all my life, and still facing these demons daily. Nothing is more vexing than being delayed on the road daily for searches and document checks, even by cops who clearly can't read. You have to settle to get the most basic of approvals, you have to know someone who knows someone before being considered for anything. Should I talk about government contract awarding process? Horrible. I chose to stay away from any government contract before they will compromise my values.
But if you think there's any part of our economy which has not suffered from corruption, tell us. I am even afraid to invest in the stock market any more. Its just a pity.
The world reading this is a great help, maybe pressure from outside can force the hands of our governments to wake up and do things right, lots of square pegs in round holes, lots of incompetence, lots of avoidable mistakes, lots of same mistakes repeated over and over again to the extent that you start thinking its deliberate. We cannot continue like this.
And for some of you who have seen better, some of you who have experienced a semblance of good governance in foreign countries, how do you manage to lower all your standards, stoop lower to accommodate this sleaze? How do you feel when you see policemen posted to checkpoints for the sole purpose of fleecing motorists and beating anyone who objects into submission? How do you feel paying hefty bribes to free your relatives from cell for the offence of walking around in their own neighbourhoods? How do you feel when patients die just because there is no equipment in hospitals to save them after billions has been budgeted and embezzled, or because the driver of the ambulance drove away to do kabu kabu with the only vehicle for ER and so the patient died on top of a motorcycle after a spinal injury.
In all, nobody will be punished, nobody has been jailed yet for budget padding, nobody will ever be jailed for including thousands of ghost workers into most payrolls. And the whole cycle will repeat itself again tomorrow. How can I keep quiet? This is serious. Very horrible. |
|
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 2:38pm On May 10, 2018 |
More update
You can also get your cool drawings here. Whatsapp,08100452977 or advice on your past,present and future or ahead project. |
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 2:35pm On May 10, 2018 |
You can reach me for your architectural drawings and other drawings,structural or any kind.08100452977/whatsapp |
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 10:15am On May 10, 2018*. Modified: 7:36am On Apr 02, 2020 |
... |
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 1:25pm On May 08, 2018 |
[quote author=SANMINI post=67377085][/quote]Ok,no problem sir.
Where do u base maybe one day will give your product a try? |
|
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 6:11am On May 08, 2018 |
more update coming |
|
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 4:22am On May 07, 2018 |
1759King: Walls like this makes me cringe. cringe in what way sir? |
|
Properties › Re: Construction Of A 3bedroom Bungalow @ogun State by Timtol(op): 2:16pm On May 06, 2018*. Modified: 7:42am On Apr 02, 2020 |
.. |