Tsagero's Posts
Nairaland Forum › Tsagero's Profile › Tsagero's Posts
1 (of 1 pages)
Excavation was the next item after the setting out and we dug trenches for the foundations for columns base and walls
|
For this particular project, the first operation involves the carrying out of setting out of the building. Setting is the process of marking the exact position of a building on the ground before the actual construction starts. It involves the use of of builder's square, ropes, timber boards and other surveying instruments like the theodolite , total station etc.
|
For this particular project, the first operation involves the carrying out of setting out of the building. Setting is the process of marking the exact position of a building on the ground before the actual construction starts. It involves the use of of builder's square, ropes, timber boards and other surveying instruments like the odometer, total station etc.
|
My name is Bashir Sani Tsagero, a civil engineering consultant working on some of the blocks of Flats belonging to NIA at lokogoma district, Abuja. The job consists of 3 bedroom of six flats per block and I was happened to be the consultant doing a supervision. The actual project consist of 15 blocks for the estate that sizes about 3 hectares of land. Apart from the buildings, there is infrastructural work which covers the roads, walkways, landscaping, site drainage, and sewage systems. |
Nice topic... I am really enjoying this beautiful thread, as a civil engineer new to nairaland |
1 (of 1 pages)