Uchristian's Posts
Nairaland Forum › Uchristian's Profile › Uchristian's Posts
1 (of 1 pages)
Hi everyone, this is a quotation given to me by an Engineer to do just a Foundation to Dpc and he charged 1.2million for labor. The house plan is to build a 4 bed room with two sitting room and attached 2 unit 3bed room duplex The land is in Enugu state. Please I need a help also calling on any good qualified Building Engineer. christiawebnet@gmail.com.. thanks Estimate From FOUND. - DPC: -Materials ÷ Reinf. Rod: *Starter bars - 16mm - 48lengths @ #4700each = #228000,. *Basket/chaining - 22mm - 123lengths @ #2800 each = #344400, *Links - 8mm - 46lengths @ #1300each =#59800, Binding wire - #8500. {Estimated cost of rod = #640700} TIMBER Material: *Peg - 4bundles @ #800 each - #3200, *2x2 - 34lengths @ #250each = #8500, *1*12*12 - 129lengths @900each = #116100, *3" nail - 1bag @ #8000 {Estimated timber cost = #135800} CONCRETE Material: *Gravel - 90ton - #540,000. *Sharp sand - 20trips @ #10,000each = #200,000, *Cement - 266bags at #2400each = #638400, *Water -6tanks @ #3500 each = #21000, *Water for compaction - 4tankers @ #7000each = #28000, {Estimated cost of concrete = #1427400} Material For Block Work: *cement - 40bags @ #2400each = #96000, *Sand for DPC filling - 30trips @ #10000 each = #300000, {Estimated #396000} ( Total Estimated material cost = #2,619,900) |
1 (of 1 pages)