Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch / Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 / Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (11) (Reply) (Go Down)

Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 9:05am On Sep 30, 2015
This house was build around 1968-70
Client;non. Nl member
Duration;2month
Contractor; Rotech77
Contact; 08066619493

Restructuring/beautification.
This building has 7rooms without any toilet/bathroom "oldskool" now we are going to extend the sittingroom, create one bathroom, the kitchen and others bathroom will be a detached structure,

Let's go

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 10:02am On Sep 30, 2015
More

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 11:20am On Sep 30, 2015
Work is going on

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by mexxy1(m): 11:42am On Sep 30, 2015
Rotecch77, I wish you could advice the owner to demolish this structure and set up a new one, even if smaller.
From what I see the building doesn't seem to have lintels with reinforcement bars (as seen from the crack on that door in the pic from the top) and the blocks look very weak.
My opinion though. Thanks.

3 Likes

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:19pm On Sep 30, 2015
@mexxy1; thanks, good observation from. You, work just begin all the windows/doors will have lintels it will be a round lintels that will hold the structure together with support. Of pillars
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:30pm On Sep 30, 2015
More

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 10:57pm On Sep 30, 2015
Work in progress... we are getting our plank from this bush ( abora wood) with the help of. Chain saw people

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 11:40pm On Sep 30, 2015
These people are very hard working guys

1 Share

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by FastShipping: 12:00am On Oct 01, 2015
Why not tear down the whole structure and start from foundation again? The walls are not holding up anymore when you look at the picture below.

2 Likes

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by Nobody: 12:04am On Oct 01, 2015
FastShipping:
Why not tear down the whole structure and start from foundation again? The walls are not holding up anymore when you look at the picture below.

Exactly.

I will also like to look at the base of the pillars.

1 Like

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:27am On Oct 01, 2015
thanks for the observation, the client wanted to spend according to his capacity,although the block are still ok
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:32am On Oct 01, 2015
More

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:38am On Oct 01, 2015
The pillar base
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by Nobody: 1:47am On Oct 01, 2015
rotecch77:
thanks for the observation, the client wanted to spend according to his capacity ,although the block are still ok

Makes sense.

Good luck on the project.
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 5:51am On Oct 01, 2015
@egunmogaji;amen,same to you on your project
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by brabus(m): 6:37am On Oct 01, 2015
@rotecch,

You've removed the roofs, Windows, doors, Electricals, mechanicals, ceiling, introducing columns which I guess might be to support a parapet or hold the structure together, redo the Oversite flooring - why not kuku ma advice the client to demolish and rebuild the structure? Isn't it cheaper and safer that way than using columns to hold the 1978 walls in place?

Hope the scope of work are clearly defined and agreed? It's not always the client that will complain. It's the friends and relatives that will attack and you may not be there to do the explaining. And what will be more shocking is that he won't tell anyone that it was his decision to spend less but that he was ill advised. I've been there and I'm telling you the utmost truth.

Well done and God be with you!


______
The Chateau in Ile Oluji project was actually meant to be a renovation of a very old building like this but I quickly snapped at the client and told him he's better off with a new build because the cost of patching up an existing structure and a new build is not always noticeable but the difference between a new build and renovations are always clearer when completed because no builder has X-Ray vision.

Below are the pictures of another Nairalander project when we bought an old house in Iba, Lagos. I had to demolish the structure and use the rubbles to Sandfill the compound and as hardcore on the new build. I could have plastered the house and save the clients some costs but have I built a safe house?

4 Likes 1 Share

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 7:54am On Oct 01, 2015
@brabus, thanks so much,the scope of the project is well defined and agreed with the entire family

1 Like

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 11:40am On Oct 01, 2015
More update coming soon
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by KolaShangOne(m): 8:40pm On Oct 01, 2015
the owner thought it would cost him less if he retains the block wall.. At least he won't have to pay One Millon plus for foundation..

The consolation is that old buildings have good foundations.
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by brabus(m): 8:59pm On Oct 01, 2015
KolaShangOne:


The consolation is that old buildings have good foundations.


Says who? Not all o my brother.

_____
Sir rotecch, sorry for the distraction o!

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 6:09am On Oct 02, 2015
@brabus; you are right not all old building,but most do have,..good point from both of you there sirs
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 4:25pm On Oct 02, 2015
More. Coming
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 7:56am On Oct 03, 2015
Still coming
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 6:31pm On Oct 03, 2015
Update? Watch out.
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 7:25pm On Oct 06, 2015
Coming soon!
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 6:19am On Oct 13, 2015
Update

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 6:22am On Oct 13, 2015
More

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 10:57am On Oct 14, 2015
Roofing will start soon

1 Like

Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 12:28pm On Oct 15, 2015
More coming soon
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 9:09am On Oct 18, 2015
Still on the way
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by EndiaSami: 10:18am On Oct 18, 2015
Brother Rotecch...well done o! smiley
Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(m): 3:05pm On Oct 18, 2015
@Endiasamy; my brother from another mother how far

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (11) (Reply)

Can I Be Forced To Sell My Inheritance? / Buy And Build Land On A Budget. Sold Out / 2 Children Die In House Fire In Akwa-Ibom (Graphic Pix)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)