How To Transport The Concrete If The Floor Is Too High by daswell: 10:04am On Apr 18, 2017
All various concrete finished products produced by commercial concrete mixing plant is always used in different engineering project construction Concrete Mixer with Pump, such as high buildings etc. However, if the floor is too high, how to transport the concrete produced by concrete mixing plant to the roof?

Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:highway construction companies,plough shear mixer design,If you are interested in our products, please contact us freely: info@daswell.com

In fact, regardless of commercial concrete mixing plant or engineering concrete mixing plant, you will meet the question when you irrigate concrete to some special engineering, will encounter this problem. Taking the world famous Dubai Lugger Hotel as an example, in the beginning of construction of the high buildings, it's almost impossible to complete the transportation of commercial concrete with ten thousands cubic meters. However, the concrete delivery of Lugger Hotel doesn’t through the crane or other similar tools.

First of all Quartz plant, you should put the concrete produced by concrete mixing plant into the pipe with a high pressure pipe of 10cm~20cm diameter, and then send out the concrete in the pipe to the high buildings with the powerful air pressure. This is the common methods of delivering concrete in the world at present. And using this method, you should pay attention to the following two problems:

1. You should choose a suitable injection time according to the actual construction situation. As for the desert area, you can only work at night, this can avoid the concrete in high-pressure pipe clot caused by the high temperature during the day; However, as for the low temperature area year-round, such as Russia overpass bridge construction, it can only work during the daytime, samely, this is also in order to avoid the clot of concrete in pressure pipe caused by low temperature at night;

2. If you want to use different labels to have mixing work, you not only should use different pipelines to spray, but also you should take care that the concrete sprayed to the high building can't be mixed together.

(1) (Reply)

Facebook Records 1.3 Billion Users Daily, Says Zuckerberg / Glo Claims Highest Data Penetration In Q1 / Check Out Our Guide On How And What To Look Out For In Picking A Phone.

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.