Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 10:25pm On Jul 25, 2018 |
German floor casting concluded.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 7:02am On Jul 26, 2018 |
We started the block setting for the ground floor on Wednesday 25th July. Laying out the first coach blockwork to show the spatial arrangement.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by seunben(m): 7:27pm On Jul 26, 2018 |
BITSWORKS:Thank u for the analysis |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 5:44am On Jul 27, 2018 |
Block setting layout.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:05pm On Jul 27, 2018 |
Block setting in motion, slow, steady and neat...thats how we do it. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:09am On Jul 28, 2018 |
Block setting ongoing. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by seunben(m): 4:19am On Jul 30, 2018 |
BITSWORKS:You have been very honest with ur answers. God bless you sir. Was the german floor was done in stages over a period of more than one day? Secondly if u don't mind what is the total size and cost of the damp proof membrane (nylon) |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:21pm On Aug 01, 2018 |
Block setting getting to lintel level gradually. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:01pm On Aug 04, 2018 |
seunben: Apologies for the late response, have been a bit busy lately. Yes, the german floor was casted in 2 stages since we had a step down level from the foundation work, that made it easy to cast it over 2 days. The size of the german floor is 9.5m x 26.5m and the DPM material covered this. We bought 4 rolls of double layer nylon unlike the black one readily available in the market that comes in small sizes. I will have to check the nylon wrapper to get the coverage of one roll which is in grams anyway. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:31pm On Aug 04, 2018 |
Lintel level achieved, almost 100% done but we will definitely wrap it up today to begin the carpentry formwork next week. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by seunben(m): 8:17am On Aug 05, 2018 |
BITSWORKS:Thank u sir for the prompt response |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 2:56pm On Aug 05, 2018 |
More block setting pictures at lintel level. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:16am On Aug 08, 2018 |
Aerial shots of ongoing construction.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:02am On Aug 10, 2018 |
Carpentry formwork for the lintels and columns ongoing. 1 Like 1 Share
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by Nobody: 3:41am On Aug 10, 2018 |
How are you getting the aerial pictures? Thanks. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 8:25am On Aug 13, 2018 |
Casting of the columns, beams and lintels.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 11:38am On Aug 13, 2018 |
EgunMogaji: I own and pilot a DJI Phantom drone for my projects and for commercial rentals. How are you doing sir. 3 Likes |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 11:41am On Aug 13, 2018 |
Drone shots from BITSWORKS ONE. 1 Like
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by Nobody: 2:07pm On Aug 13, 2018 |
BITSWORKS: Oh, that’s really nice. I’m doing really good Sir, thanks for asking. Did you ever get consent to post the plans? I’ll love to read them. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by UncleRovas(m): 11:59pm On Aug 18, 2018 |
This plan is just perfect for me. Nice job BITSWORKS |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 7:17pm On Aug 20, 2018 |
EgunMogaji: Yes, the client has given us a go ahead and I will post it ASAP. 1 Like |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 7:19pm On Aug 20, 2018 |
UncleRovas: Thank you sir. Regards. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by jp130(m): 8:06pm On Aug 20, 2018 |
Nice n neat work that u r doing here, i feel like i am d owner of d work. My dream will com to pass someday 1 Like |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by Nobody: 8:43pm On Aug 20, 2018 |
BITSWORKS: Excellent, thank you Sir. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by Nobody: 8:45pm On Aug 20, 2018 |
jp130: You will build bigger than this Insha Allah! It motivates me when I see artisans that take pride in their work. The bricklayers are wizards. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 7:41am On Aug 21, 2018 |
jp130: Thank you sir for the kind words. You will definitely build yours and we will be at your service if you need us. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 7:49am On Aug 21, 2018 |
Casting of the front unit lintels, beams and columns. To save cost, we are using the planks from the rear unit for the formwork and that is why it took a bit of a while.
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 8:04am On Aug 21, 2018 |
The architectural drawings showing: 1. Ground floor plan 2. First floor plan 3. Front Elevation 2 Likes
|
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by jp130(m): 8:17am On Aug 24, 2018 |
Oga any update so far? |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by seunben(m): 2:55am On Aug 30, 2018 |
Excluding blocks used for foundation, what is the total number of blocks used so far for the ground floor. Also, how many blocks are you estimating for the first floor. |
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 4:49am On Sep 06, 2018 |
jp130: Apologies for the long hiatus, I have been a bit under the weather. We have taken levels and set for the decking work. |
Various Properties For Sale Around - Gbagada, Ogudu & Surulere. / How To Deal With Problem Tenants / Alucobond ACP Panels (Sales And Installation)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26 |