Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 5:49am On Sep 05, 2017 |
Good day all, I will be sharing the construction process of a 32 family block of 1 bedroom flats, pictures will be shared and questions answered. Below are some brief of the project. Project Name: 32 families 1 bedroom flat, 8 families in a floor, 3 suspended floors. Client : A developer LOCATION: Jahi district Abuja. Contractor : MASTER PEDRO CONSTRUCTIONS. U can get to us via the number 08060467945. Project Duration: 6months. Built up area : 679 sqm Area of land: 5000 sqm The project is located in Jahi district, Engineering infrastructures(light, drainage, road, sewage system, water etc) have been built by Gilmor construction in the area. It is actually a developing zone with many building constructions going on. Construction started on Monday 21st august and 3 weeks was stipulated to read h the first milestone, that is the damp proof course stage. Questions will be entertained as we go on, so feel free to ask questions and make suggestions. A terrace building will also be built in the plot but that's after this one. The floor plan and side view of the building is shown below. 2 Likes
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 5:51am On Sep 05, 2017 |
Front elevation view
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 6:03am On Sep 05, 2017 |
DAY 1 went to development control DC department of the FCDA to apply for setting out inspection after which we moved down to the site to resume site clearance and setting out. I made sure I maintained the setting out rule in Abuja of 6m from the entrance fence wall and 3m from the side fence walls. We also ordered for sharp sand and granite. 1. Site clearance. The company building engineering infrastructures there dumped laterite on the land making it impossible for water to flow out. So an artificial lake was formed. 2. Setting out 1 Like
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Nutase: 6:53am On Sep 05, 2017 |
Following with keen interest. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by abouzaid: 8:22am On Sep 05, 2017 |
Gabrielclint:I gave you a like but the floor plan would be more appreciated. 1 Like |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 2:19pm On Sep 05, 2017 |
abouzaid: It's not ethical to share a clients floor plan without consent. But can send to u privately.. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 2:26pm On Sep 05, 2017 |
The pictures below are still on day 1. Couldn't finish sending it yesterday cos I had to do a structural design for a new project coming up soon by God's grace. Picture 1. 30ton granite delivered to site. Negotiated Wt the supplier and he was able to give me at 2300/ton.then 13,000 for transport. Picture 2. Profiling and setting out. The block moulding was also given out as contract and would be done insitu so I can supervise his mixing and curing very well.
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by abouzaid: 3:40pm On Sep 05, 2017 |
Gabrielclint:greenermodels@gmail.com, thanks a million and remain blessed. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by toxxnoni(m): 3:43pm On Sep 05, 2017 |
Gabrielclint: urgent request my client need 6 nos. 3 bdrm with spacious compound or 4 nos 4 bdrm terrace with spacious compound on a major road, for office use, at lekki scheme 1, or its environment for immediate purchase. budget is 250 million to 350 million (naira) call or whatsapp 08136569906 or 08120553460 |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 6:38am On Sep 06, 2017 |
abouzaid: Will send to u this morning |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 6:40am On Sep 06, 2017 |
toxxnoni: Thanks.. Will get back to u asap |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 6:47am On Sep 06, 2017 |
DAY 2 AND 3.. trench digging proper. The width of the foundation is 700mm and the depth 1000mm. The total length of trench to be dug is 462m. So it took exactly two days to dig Wt over 15 labourers digging each day. I also observed that some part of the land was sand filled, so I am considering introducing a beam to chain those areas. I was able to negotiate Wt them and the dug per meter 350naira for me. Below are pictures of the trench digging. 1 Like
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by abouzaid: 9:18am On Sep 06, 2017 |
Gabrielclint:thanks. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by snakebeat: 10:22am On Sep 06, 2017 |
Gabrielclint:@bold quite cheap? Are your labourers based in Abuja? If yes can u help me with the contact of their coordinator? Will really appreciate. Always help us with the prices of labourers, seems u have good labourers. What is the dept of your column base? Foundation for three suspended floor shouldn't have been anything less than 1.2m ooo Great job... |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 10:25am On Sep 06, 2017 |
snakebeat: I will give u the number, u can reach me wt 08060467945. The depth of the trench doesn't really matter, rather the thickness of the column base and it's depth... 1 Like |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by snakebeat: 11:08am On Sep 06, 2017 |
Gabrielclint:Okay thanks alot. Will reach u sir. What is d depth of the base? |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 9:39pm On Sep 06, 2017 |
snakebeat: We have three types of column base Wt different thickness. Our 1600*1600 is 450mm, the 2000*2000 is 500 while the 2500*2500 is 600mm. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 9:58pm On Sep 06, 2017 |
Day 4. The iron bender started cutting and bending of the column base reinforcement (basket). We have 64 columns in the building, 35 is 1600*1600mm in dimension and 450mm thick, so for that I told the iron bender to cut the irons 2m so I can get 6 from one rod. The reinforcement is y12 @ 150mm spacing. We also have 20 columns which is 2000*2000mm with 500mm thickness , Y12@150mm spacing. It was cut 3m Then the remaining 9 is 2500*2500mm, 600mm thickness(depth) Y16@150mm spacing. All the starter bars are Y20. 55 of the columns are 4Y20 while 9 are 6Y20. PRICING. .. The basket and starter bars Wt mounting was done for 2500/column. On that same day, the digging was concluded and Wt my level instrument I made sure I leveled everywhere and introduced step up of 225mm when necessary. I always like maibtaining my height at foundation level. I also negotiated price for the Column base digging and some laterite dropped inside the rooms were packed out to give way for column base digging.
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 10:00pm On Sep 06, 2017 |
Pls feel free to comment and ask your questions. Will be sharing pictures at the end of each work day. Thanks |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Aceskay(m): 5:42am On Sep 07, 2017 |
This is a great work and nice development for the breakdown and follow up of the project here... � bro 1 Like |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by raymondFirstborn(m): 8:05am On Sep 07, 2017 |
Gabrielclint: Boss I hail o, nice job going on there.Anything for the boys? I do pulmbing and water supply contracts 1 Like |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 8:44pm On Sep 07, 2017 |
DAY 5-6. DIGGING OF COLUMN BASE. Wt lines drawn from the centre lines, the column base of different dimensions were marked and the digging commenced. Pricing: the 1.6*1.6m * .45 column base was dug for 1200 The 2*2*.5m was dug for 1600 while the 2.5*2.5*.6m was dug for 2500. While the digging was going on, parking of the layette dug was also going on simultaneously so they wount collapse. 1 Like
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by abouzaid: 10:52am On Sep 08, 2017 |
Gabrielclint:chairman, still expecting your mail o. |
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 8:52pm On Sep 09, 2017 |
Day 7 blinding... The whole 64 columns were blinded Wt grade 15 concrete 1:3:6 mix, blinding thickness is 50mm
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 8:16am On Sep 10, 2017 |
While the construction is going on, block moulding started at the site too. The block is produced with Stone dust and cement. 1 bag of cement was producing 48-50 bags and it's watered till the 6th day. We will be needing like 6000 blocks to bring it up to DPC level
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 8:21am On Sep 16, 2017 |
Day 8-9. Mounting of the column basket and starter bars. Guage for the trench casting was also marked with the help of the levelling instrument. Sorry for the delay in updating, I had a very busy schedule.
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 8:24am On Sep 16, 2017 |
Some of the columns had double reinforcement
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 1:57pm On Sep 17, 2017 |
Day 10. Casting of the column base. A mix ratio of 1:2:4 was used, and batching by volume was the method of batching used. The mixing was done Wt a concrete mixer and the transportation with a wheel barrow. The cost of casting the column base was 180,000 And 450 bags of cement was used. Rem: u can ask your questions as we go.
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by Gabrielclint(m): 1:59pm On Sep 17, 2017 |
Casting contiues
|
Re: Construction Process Of A 32 Family Block Of 1 Bedroom Flat by DerMeister: 3:23pm On Jan 19, 2018 |
Nice job! Please how much does it cost to hire a concrete mixer for a day. |
(1) (Reply)
Land For Sale In Idi Ape, Olorunda Aba After Akobo, Ibadan / Are You In Need Of Sand, Granite, Paving And Interlocking Stones Supplier? / Houses For Sale @ Mushin Lagos. (very Cheap & Attractive Price)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 63 |