Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,154,739 members, 7,824,125 topics. Date: Friday, 10 May 2024 at 11:44 PM

1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / 1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January (345 Views)

AG Dangote Completes Apapa-wharf Concrete Road, / The True State Of Apapa Wharf Road (photos And Video) / After The Rain Comes A Floody Apapa-Wharf Road - Photos (2) (3) (4)

(1) (Reply) (Go Down)

1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January by AutoReportNG: 2:36pm On Jan 15, 2018
The Federal Controller of Works in Lagos, Godwin Eke, says the Section 1 of the four-kilometer Apapa-Wharf Road in Lagos State currently under reconstruction would be opened to traffic before January end.

Eke who made this known to newsmen in Lagos on Wednesday said that the measure was to reduce gridlock and hardship to road users plying the road.

An engineer on site who craved anonymity told newsmen that work was also progressing on Section 2 of the project.

The engineer said that the project was divided into four sections.

He said the pace of construction in each section would depend on how fast the utilities in the Right of Way (RoW) of the project were relocated.

He said that there were both surface and underground utilities, which include the covering of the gas pipelines, internet cables, water lines, 11KVA and 33 KVA electric cables in the RoW.

The engineer said that these must be taken care of before their workmen construction works could start.

“We are working here now because we have been able to identify where gas pipelines are and work around it.

“We have also hung the utility cables that were removed here so that we can replace them in the new service ducts that we will provide after construction.

“We cannot move to Section 3 without taking care of the various utilities.

“The whole section is about 550 meters and we have done the drains more than halfway on this side,” the source said.

The engineer also said that all the precast elements needed to speed up construction works were ready.

The Minister of Power, Works and Housing, Babatunde Fashola, had on June 17, 2017, signed a N4.34 billion Memorandum of Understanding (MoU) with AG Dangote Construction Company Ltd., and some other stakeholders for the reconstruction of the four-kilometer Apapa-Wharf Road.


Source:
http://www.autoreportng.com/2018/01/1-section-of-apapa-wharf-road-to-be.html


Lalasticlala, Seun

Re: 1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January by AutoReportNG: 2:36pm On Jan 15, 2018
Relief for all motorists..
Re: 1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January by LionDeLeo: 2:38pm On Jan 15, 2018
God bless The president
God bless The vice president
God bless The Honourable minister of Power, Works & Housing.
God bless the Dangotes.
God bless patriotic Nigerians.
Long live the Federal Republic of Nigeria.
Re: 1 Section Of Apapa - Wharf Road To Be Opened To Traffic Before End Of January by LessNoise: 2:40pm On Jan 15, 2018
Fash baba!!!! grin

(1) (Reply)

PHOTOS: Bayelsa State Teachers Visit Governor Dickson / Police Fraud Unit Arrests 20 Visa Racketeers In Lagos / Save Lives, Do Not Be Like Wicked Mass Murderers Buhari, Elrufai, Buratai & Gang

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.