Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,745 members, 7,820,572 topics. Date: Tuesday, 07 May 2024 at 05:21 PM

Pls Who Can Explain This Electrical (renewable Energy) Procurement Order - Career - Nairaland

Nairaland Forum / Nairaland / General / Career / Pls Who Can Explain This Electrical (renewable Energy) Procurement Order (486 Views)

"Explain-PM-to-Grandma": Project Management Class Highlights / ‘Forget About the Stigma’ Male Nurses Explain Why Nursing Is a Job of the Future / Any Renewable Energy Specialist In The House (2) (3) (4)

(1) (Reply)

Pls Who Can Explain This Electrical (renewable Energy) Procurement Order by galax1: 7:48pm On May 03, 2018
Supply and installation of Battery 13.8VDC output @ 22Amp; Battery 88 to 264 AC 60/50 Hz input (auto ranging); No break battery backup facility; Full protection; Includes IEC mains cord; power cable and Mains power supply operators manual
Supply and installation of Battery backup cable 3 meter for Power
Supply includes universal battery plugs
1 piece 60A MPPT charge controller – 80,000
2 pieces long 2.5mm Cables – 50m each (red and black)- 12000*2= 24000
12 pieces 200mah battery – 150000*12=1,800,000 Fabricated metal rack for inverter and batteries = 40,000 Steel platform for solar panel – 150,000


pls who can explain this procurement order
especially this phrase
12 pieces 200mah battery – 150000*12=1,800,000 Fabricated metal rack for inverter and batteries = 40,000 Steel platform for solar panel – 150,000
Re: Pls Who Can Explain This Electrical (renewable Energy) Procurement Order by cashful(m): 10:06pm On May 03, 2018
pls who can explain this procurement order
especially this phrase
12 pieces 200mah battery – 150000*12=1,800,000 Fabricated metal rack for inverter and batteries = 40,000 Steel platform for solar panel – 150,000

You're to supply the following

(1) Item: 200mah battery
Quantity: 12Nos
Unit cost: N150,000

(2) Item: Fabricated metal rack for inverter and batteries
Quantity: 1Nos(Not stated clearly)
Unit cost: N40,000

(3) Item: Steel platform for Solar panel
Cost: N150,000
Re: Pls Who Can Explain This Electrical (renewable Energy) Procurement Order by asksteve(m): 4:38pm On May 04, 2018
cashful:

pls who can explain this procurement order
especially this phrase
12 pieces 200mah battery – 150000*12=1,800,000 Fabricated metal rack for inverter and batteries = 40,000 Steel platform for solar panel – 150,000

You're to supply the following

(1) Item: 200mah battery
Quantity: 12Nos
Unit cost: N150,000

(2) Item: Fabricated metal rack for inverter and batteries
Quantity: 1Nos(Not stated clearly)
Unit cost: N40,000

(3) Item: Steel platform for Solar panel
Cost: N150,000



And also
Supply and installation of Battery backup cable 3 meter for Power Supply includes universal battery plugs

1 unit of 60A MPPT charge controller at 80,000
2 units of 2.5mm Cable single core – 50m each (red and black) at 12000*2= 24000

(1) (Reply)

Commercial Sex Workers In UK Join May Day Celebrations / We Are Hiring! / Pls Save A Soul

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 7
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.