Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,194,153 members, 7,953,580 topics. Date: Thursday, 19 September 2024 at 07:42 PM

3rd Mainland Bridge To Be Temporarily Shut For 4 Days – LASG - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / 3rd Mainland Bridge To Be Temporarily Shut For 4 Days – LASG (339 Views)

Ijora Olopa Bridge To Be Closed Immediately - FG / Floods At 3rd Mainland Bridge, Oworo Estate (Photos) / BREAKING: Third Mainland Bridge To Be Temporarily Closed For Four Days (2) (3) (4)

(1)

3rd Mainland Bridge To Be Temporarily Shut For 4 Days – LASG by olokeded: 9:15pm On Aug 19, 2018
The Lagos State Government has said that the 3rd Mainland Bridge will be temporarily shut down for four days starting from midnight of August 23 to midnight of August 26, 2018 for Investigative Maintenance Test to be carried out.

The State’s Commissioner for Works and Infrastructure, Mr Ade Akinsanya, who disclosed this in a statement, said the decision was taken after due consultation with the Federal Ministry of Power, Works and Housing.

The four-day closure, according to Akinsanya, will enable the contractors assess the true state of the bridge after which works would commence by the end of the year or early in 2019.

It would be recalled that the Federal Government had earlier announced plans to shut the bridge in July, but had to be shelved after due consultation with the State Government and wide deliberations with other stakeholders, who expressed concern about the indiscriminate parking of articulated vehicles on other alternative routes which would have adversely affected traffic.

Subsequently, a Joint Task Force set up to remove the articulated vehicles from the highway was able to achieve tremendous success.

Justifying the need for the closure, Akinsanya said: “The 3rd Mainland Bridge which was opened about 30 years ago by the then military government has had haphazard maintenance and repairs in the past which the present Federal Government is committed to correct by carrying out proper and continuous maintenance and repairs on it.”

Consequently, the State Government appealed for the cooperation, support and understanding of all motorists and residents, advising them to minimize non-essential travel and movements during the four-day closure.

Besides, Akinsanya said all traffic management agencies including the Lagos State Traffic Management Authority (LASTMA), Federal Road Safety Corps (FRSC) and the Police, among others, have been mandated to ensure smooth flow of traffic on all the other alternative roads and traffic corridor across the metropolis to ensure free flow of traffic.

http://www.metronaija.ng/third-mainland-bridge-closed-lagos/

cc: lalasticlala mynd44
Re: 3rd Mainland Bridge To Be Temporarily Shut For 4 Days – LASG by Mynd44: 3:00am On Aug 20, 2018

(1)

Third Mainland Bridge Shut Down Temporarily (see Alternative Routes) / Los Angeles Will Be The First US City To Install Body Scanners In The Subway / Nigerian Pilgrim Returns Lost N500,000 To Pakistani Man In Mecca (pics)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.