Bill Of Quantities /materials And/or Labour Estimations/quotations by Analyst01(m): 9:50pm On Mar 05, 2019 |
A bill of quantities is a comprehensive breakdown of the materials and labour requirements to execute a defined project. The project can be a building, culvert, pavement etc. The first step to prepare a bill of quantities as to provide the cost engineer or quantity surveyor with a detailed drawing and description of the project. |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by Chekitaut: 11:21pm On Mar 05, 2019 |
Analyst01:Your location |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by Analyst01(m): 4:34pm On Mar 17, 2019 |
Enugu, You can reach me on 07033544353 or frankitangltd@gmail.com |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by Analyst01(m): 4:47pm On Mar 17, 2019 |
Cont'd With this building and the specifications, he/she can go on with the take-off to work out the materials required in each stage of the project. Typical, Civil projects are categorized into two stages. The Substructure and the superstructure. 1 Share
|
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by Analyst01(m): 12:54am On May 25, 2019 |
For building projects, the substructure are the excavation works, concrete works inside the excavation trenches and pits,blockworks through to the DPC (German floor). The superstructure on the other hand are all those above ground. |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by paul234(m): 8:55am On Jul 09, 2019 |
I understand what a review means to a business, that's why have decided to write you one. I contacted you sometimes ago for BOQ estimate for my proposed project, you gave your fee and professiona advises and after much consultation we're able to reach a consensus. I would say my business dealing with you is one of the best have had on nairaland lately, you delivered earlier than the given time. The project started last month and I'd say the BOQ have been quite very helpful and insightful. Kudos to you, and keep up the good work! 1 Like 1 Share |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by Analyst01(m): 10:36pm On Sep 16, 2019 |
paul234:i am glad to hear this. i hope i can continue being of service to you. thank you. |
Re: Bill Of Quantities /materials And/or Labour Estimations/quotations by akaahs(m): 10:38pm On May 24, 2023 |
Can u give me a rough estimate bill of 5 bedrooms duplex. Just use a rough area to be renovated to give estimates |
(1) (Reply)
Aluminium Roofs, Windows & Doors / I Need A Fairly Used MATTRESS / How We Built The Foundation in a Valley / Waterlogged Land by Engr Dubem & Team
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 12 |