Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,681 members, 7,827,516 topics. Date: Tuesday, 14 May 2024 at 12:58 PM

FG To Resume Expansion Joints Replacement On Lagos Bridges - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / FG To Resume Expansion Joints Replacement On Lagos Bridges (8368 Views)

Profile Of Nnamdi Kanu's Replacement On Radio Biafra, Simon Ekpa (photos) / FG To Resume Third Mainland Bridge Repair As Other Lagos Bridges Get Facelift / FG To Begin Repairs Of Third Mainland Bridge Expansion Joints Jan (2) (3) (4)

(1) (Reply) (Go Down)

FG To Resume Expansion Joints Replacement On Lagos Bridges by mrakeli62: 1:02pm On Jul 07, 2019
The Federal Controller of Works in Lagos State, Mr Adedamola Kuti, on Sunday said that materials being imported for replacement of expansion joints on the Alaka Bridge in the state had arrived Nigeria.

Kuti told the News Agency of Nigeria (NAN) that the materials were currently being cleared at the port for the contractor to immediately mobilise to site to begin second phase replacement of damaged expansion joints.

“Important materials for the repairs of the expansion joints has arrived and we are at the point of clearing them at the Wharf.

“We would look at the very critical expansion joints and change them. The contractor has replaced two of the joints just recently,” he said.

The controller said that materials needed for replacement of expansion joints were not available locally hence the delay in fixing the bad portions and appealed for understanding by motorists.

On the damaged expansion joints causing discomfort on the popular Long Bridge on Lagos-Ibadan Expressway, he said that the joints had been repaired before.

Kuti however said that the Federal Ministry of Power, Works and Housing was carrying out a “review” of the work done on the bridge to tackle new faults.

He added that he had given a directive to Julius Berger to speed up action on reducing discomfort to motorists on the highway.

He however said that progress was being made on construction works by Julius Berger in the ongoing reconstruction/rehabilitation of the Lagos-Ibadan Expressway project.

“Rain is slowing us down but work is going on and we are making progress. As at the last report, section one which spans from Lagos to Sagamu Interchange is about 42 per cent completed,” he said.

Speaking on the trailer park in Apapa, Kuti explained that trailers were already using the park while the contractor was completing some facilities there.

“We have finished one borehole and we are doing some electrical works also,” he said.

He said that the entire trailer park project has achieved 98 per cent completion while the shoreline protection of the park was 70 per cent completed.

https://www.akelicious.net/2019/07/fg-to-resume-expansion-joints.html

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by baralatie(m): 1:21pm On Jul 07, 2019
okay
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Studyinchina200(m): 2:23pm On Jul 07, 2019
Okay
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by ashantitope: 2:23pm On Jul 07, 2019
Good work our able president may you live long to finish all your project so by the end of your tenure your enemy can say good work

3 Likes

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Eedrisa(m): 2:23pm On Jul 07, 2019
Okay dey r showing workings
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Vikzz(m): 2:24pm On Jul 07, 2019
we hear lol

1 Like

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Phock2sweet: 2:24pm On Jul 07, 2019
Abuja is a goal.... Lagos out lazzdent
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Firefire(m): 2:24pm On Jul 07, 2019
Only baseless promises with nothing to show.

2 Likes 3 Shares

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Amuocha: 2:26pm On Jul 07, 2019
Traffic
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Staro: 2:42pm On Jul 07, 2019


Nothing, I mean, nothing is going to happen.
Just baseless talk and lies as usual


1 Like

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by Lanre4uonly(m): 2:44pm On Jul 07, 2019
Good development.
Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by oluwasegun007(m): 3:21pm On Jul 07, 2019
Tears just rolled down my cheek...

We have a paralysed steel factory in lokoja..

With natural minerals to produce steel litter the whole nation...

Yet we import this steel...

Have you wondered where the steel used in constructing the oshodi fly over came from..

Or the steel used in the on going construction of second naija bridge..

There was a nation.

1 Like

Re: FG To Resume Expansion Joints Replacement On Lagos Bridges by bigpicture001: 6:32pm On Jul 07, 2019
FG is paying too much attention to lagos and neglecting other states...if a pot hole is found in lagos, contracts are immidiayely awarded to fix it..not to offend tinubu...while the whole nation's life saving infrastructures are all dilapidated....

Foolish president!

(1) (Reply)

Breaking- U.K. Temporally Ban Buhari .. / US Navy Ship Caused Haiti Earthquake / UNDENIABLE Greatness Of GEJ Revealed. Your Eyes Must See This!

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 13
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.