Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract (3227 Views)

25,000MW Siemens Power Project Begins Q1 2022 / 25,000MW Deal: FG, Siemens Sign Pre-Engineering Contract / Joe Igbokwe Cleaning Gutter In Lagos As He Begins Work (Photos) (2) (3) (4)

(1) (2) (Reply) (Go Down)

Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 7:58pm On Jul 29, 2020
THE Federal Government has approved Siemens’ pre-engineering contract, thus enabling the company to start work on Nigeria’s 25,000 megawatts expansion project.

In a statement obtained by Vanguard, yesterday, the company stated: “The pre-engineering contract forms the initial step in the Presidential Power Initiative (PPI), formerly the Nigeria Electrification Roadmap, outlined by Siemens and the Federal Government of Nigeria in July 2019.

“The PPI project aims to upgrade the electricity network to achieve the operational capacity of 25,000 megawatts (MW) from the current average of around 4,500 MW, through a series of projects spanning three phases.


“Siemens will begin pre-engineering works for the transmission, distribution, and meter data management systems (MDMS) infrastructure across the country, to enable the development of a functional, efficient and reliable electricity grid system. Comprehensive studies and power system analysis software for the Nigerian utilities are also included.

“Nigeria’s power system is suffering from an imbalance between power generation and demand. Despite more than 8,000 MW of operational power generation capacity in the country, only an average of 4,500 MW reliably reaches consumers.

“This inadequate power supply results in regular brownouts and blackouts and has restrained Nigeria’s economic development. Raising Nigeria’s operational electricity capacity to 25,000 MW will power various industries and businesses, as well as significantly improve access and reliability of power supply to the Nigerian people.

“This project will also facilitate the creation of thousands of jobs while generating new opportunities for small and medium enterprises (SMEs) across the country. This will in turn increase Nigeria’s GDP and boost economic productivity.”

Similarly, Minister of Power, Saleh Mamman, stated: “This significant, timely and high-level intervention between President Buhari and Chancellor Merkel addresses critical infrastructure deficits in the value chain and helps reposition the power sector to become more attractive, viable and investable.”

Also, the Minister of Finance, Zainab Shamsuna Ahmed, said: “The Government loses over $1 billion annually due to technical and commercial inefficiencies along the electrification value chain. The PPI will help eliminate these inefficiencies and unlock economic value for the country.”

“The PPI aligns very strongly with the key objectives of the power sector reforms initiated by Government and superintended by the Bureau of Public Enterprises, which were to attract private sector investment into the power sector, increase operational efficiencies and improve service delivery to end-users,” said Alex A. Okoh, Director General, Bureau of Public Enterprises, Federal Republic of Nigeria.”

“This contract is one important step as part of the development of vital electrification infrastructure that will ensure reliable power supply, remove constraints in Nigeria’s electricity grid, secure additional revenue for investors, and build competent local content and capacity,” said Onyeche Tifase, Managing Director Siemens Nigeria.

“The projects will create vital direct and indirect jobs for Nigerians and local businesses, thus enabling economic growth and increased productivity, based on the supply of reliable electricity.”

The pre-engineering contract is the start of a longer-term approach. Phase 1 of the PPI will focus on essential and quick-win measures to increase the system’s operational capacity to 7,000 MW and to significantly reduce the ATC&C financial losses.

As part of Phase 1, Siemens will provide general technical training on core competency areas as well as training for employees of Nigeria’s 11 electricity distribution companies, the Transmission Company of Nigeria, and regulators, on all the equipment and software being provided by Siemens.

Phase 2 will target the remaining network bottlenecks to enable full use of existing generation and distribution capacities, bringing the systems operational capacity to 11,000 MW.

Phase 3 will develop the system up to 25,000 MW in the long-term. This includes upgrades and expansions in the generation, transmission, and distribution.


https://www.vanguardngr.com/2020/07/siemens-begins-work-on-25000mw-project-as-fg-approves-pre-engineering-contract/amp/

2 Likes 1 Share

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 8:14pm On Jul 29, 2020
White elephant project.

Billions will go down the drain as usual.

Next!

3 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 8:15pm On Jul 29, 2020
Every Government in second term dey always find white elephant project to take steal money comot

4 Likes 1 Share

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by jidamsel43(m): 8:18pm On Jul 29, 2020
Another white elephant project.

I have lost confidence in Nigerian government

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 8:24pm On Jul 29, 2020
For now, we may not need foreign companies for our power supply. Wasting millions without find solution to transmission and distribution is a waste of resources.
My own kobo........

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Ugaboy: 8:33pm On Jul 29, 2020
flyingpig:
White elephant project.

Billions will go down the drain as usual.

Next!
nigeria has a big issue, no one wants to trust this politifcian.

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Abohboy: 9:27pm On Jul 29, 2020
flyingpig:
White elephant project.

Billions will go down the drain as usual.

Next!

How dumb can you be to think providing electricity is a white elephant, it will save Nigeria over 5 billion dollars. Create more jobs, more efficiency and spearhead Nigeria into an industrial revolution

7 Likes 1 Share

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 9:30pm On Jul 29, 2020
Abohboy:


[s]How dumb can you be to think providing electricity is a white elephant, it will save Nigeria over 5 billion dollars. Create more jobs, more efficiency and spearhead Nigeria into an industrial revolution[/s]

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Abohboy: 9:32pm On Jul 29, 2020
[quote author=flyingpig post=92247215][/quote]

Some Nigerians and being stupid are like one and two. And you just happen to fall into this demographic well done.

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by favor914: 9:36pm On Jul 29, 2020
jidamsel43:
Another white elephant project.

I have lost confidence in Nigerian government
Failure, at least try and make enough money to buy petrol for your generator, who do you think is going to fix the electricity issues for you?

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 9:43pm On Jul 29, 2020
Abohboy:


[s]Some Nigerians and being stupid are like one and two. And you just happen to fall into this demographic well done[/s].

3 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by slimfit1(m): 9:53pm On Jul 29, 2020
Thunder warm up

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Sammy07: 9:54pm On Jul 29, 2020
favor914:
Failure, at least try and make enough money to buy petrol for your generator, who do you think is going to fix the electricity issues for you?

He's expecting a Miracle.

3 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 9:58pm On Jul 29, 2020
We have wind and solar in abundance.....
Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Miracle1991: 10:26pm On Jul 29, 2020
God bless PMB

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Beremx(f): 10:31pm On Jul 29, 2020
Na siddon look I dey so. All talk no action

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Abohboy: 10:39pm On Jul 29, 2020
Omooba77:
We have wind and solar in abundance.....

Yes they are going to power 5 million houses with solar energy so far they have powered over 20 000 houses. For wind I don’t know why it isn’t being used,
Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 10:40pm On Jul 29, 2020
Miracle1991:
God bless PMB
Get a Chinco name

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by omunabo(m): 11:02pm On Jul 29, 2020
This politicians ehn
if them like award 50,000mw, Nigerian politicians will still sell the electricity to Togo, Benin, Niger etc

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Raydos: 11:02pm On Jul 29, 2020
No be only Siemens, Nah Semen

3 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 11:03pm On Jul 29, 2020
Abohboy:


Yes they are going to power 5 million houses with solar energy so far they have powered over 20 000 houses. For wind I don’t know why it isn’t being used,
North and South like Rivers, Akwa Ibom has wind in abundance
Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by seunmsg(m): 11:04pm On Jul 29, 2020
This is massive. If Buhari can deliver this project, his name will never be forgotten in the history of Nigeria.

4 Likes 1 Share

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by seunmsg(m): 11:14pm On Jul 29, 2020
Omooba77:
For now, we may not need foreign companies for our power supply. Wasting millions without find solution to transmission and distribution is a waste of resources.
My own kobo........

Such a shame you did not read and understand what you posted. The presidential power initiative is a comprehensive plan that cut across all value chain in the power industry. It is not Just about power generation, it involves transmission, distribution, and metering data management. Read the story very slowly and understand the content before criticizing blindly.

4 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by 9jaArea: 11:27pm On Jul 29, 2020
We can't wait, according to the completion timeline Nigerians will start to feel the impact of this before the june 2023.
Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77: 11:30pm On Jul 29, 2020
seunmsg:


Such a shame you did not read and understand what you posted. The presidential power initiative is a comprehensive plan that cut across all value chain in the power industry. It is not Just about power generation, it involves transmission, distribution, and metering data management. Read the story very slowly and understand the content before criticizing blindly.

You are here tonight.....The you know how much it will cost... Same deal that sent Abba out.....Siemens has little to contribute. All we need to do is booster
Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Superwave: 11:39pm On Jul 29, 2020
Abohboy:


How dumb can you be to think providing electricity is a white elephant, it will save Nigeria over 5 billion dollars. Create more jobs, more efficiency and spearhead Nigeria into an industrial revolution

Bro lunatics raised by PDP too many for NL.

2 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Rossikki: 11:45pm On Jul 29, 2020
flyingpig:
White elephant project.

Billions will go down the drain as usual.

Next!

You're a worthless fool. May the failure you wish for the nation befall you and no one else.

5 Likes

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Rossikki: 11:45pm On Jul 29, 2020
Abohboy:


How dumb can you be to think providing electricity is a white elephant, it will save Nigeria over 5 billion dollars. Create more jobs, more efficiency and spearhead Nigeria into an industrial revolution

Na Low IQ be him problem.

1 Like

Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by kolaaderin: 11:51pm On Jul 29, 2020
Superwave:


Bro lunatics raised by PDP too many for NL.
Bros their brains was also looted during those locust years of waste. PDP share the money.

2 Likes

(1) (2) (Reply)

ISRAEL; The World Is Ignoring The Genocide On Biafrans / HURIWA Praise Ugwuanyi For Intervening In NULGE Land Tussle / Tinubu Was The Youngest Senator In 1992. He Was Barely 30 Years Old-Ayu

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.