Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 6:20pm On Mar 11, 2021 |
Project Title: Residential Development Of a Block of Four units of 2bedroom flats Project Location: Kubwa, Abuja Contractor : Harneyprojects ltd RC 781615 ( www.harneyprojects.com) Client : Nairalander Project cost: 69 million naira Project Duration: 7 months 1 Like
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 6:28pm On Mar 11, 2021 |
The building approval process was done with Federal Capital Developement Authority (FCDA) . The lead Engineer ( Engr. A.P Saliu ) is a Coren Registered engineer and also a member of the Nigerian society of engineers(NSE) , his registration status lead to a smooth building approval process.
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 6:53pm On Mar 11, 2021 |
The Construction team of 1 Coren registered engineer, Building technologist, carpenters, iron benders and other skilled artisans were dispatched to the site to execute the project.
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 9:50am On Mar 14, 2021 |
The preliminaries work involved the construction of a store and drilling of a borehole |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 10:54am On Mar 14, 2021 |
The main work began with the foundation. FOUNDATION WORKS : The setting out [/i]of the foundation was done using line, square, pegs, profile board, measuring tape and nails. The setting out team involved an engineer, builder and a carpenter. [i]The excavation works [/i]preceded the conclusion of the setting out of which the buildings strip foundation was excavated to a depth of approx 1.2meter and width of 0.675m while the pad foundation was excavated to a depth of 1.4m and width of 1.2m. The excavation team involved a team of locally sourced labourers and the building technologist. The foundation involved a combination of stip foundation and pad foundation . The strip foundation would cater to the sancrete blocks walls while the pad foundation would cater to the columns which serve as part of the structural frame of the building. [i]The Reinforcement work [/i]preceded the excavation. This involved a combination of 16mm,12mm and 10mm high yield TMT bars bent to the structural specification in the approved structural drawings. The reinforcement work for the pad base and columns were done and placed in the excavated foundation pit. [i]The concrete works involved mixing the concrete to a ratio of 1:2:4 using a concrete mixer and placed with wheelbarrows and shovels. A vibrating machine was used to ensure well-vibrated concrete. The strip footing has a thickness of 225mm while the pad footing has a thickness of 350mm https://www.youtube.com/watch?v=85PUGjYVPy4
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 12:08pm On Mar 14, 2021 |
Foundation blockwork Blockwork preceded the foundation concrete works. It involved the placement of sancrete blocks on the strip footing bonded with mortar(a combination of cement and sharp sand (1:6). The blocks are laid to the Damp proof course (DPC) level specified in the architectural design. The specified height above Natural ground level (NGL) is 1.25m. The foundation blockwork was filled with concrete with a mix ration of 1:4:8 Foundation Colunms ,Pinth Beams and Damp proof course (DPC) This involved reinforcement work, concrete works and carpentry works. The plinth beam became necessary due to the height of the foundation columns and was provided to prevent buckling The reinforcement works was done to structural specifications and involved 4Y16 as main bars and Y10-200 c/c as shear reinforcement ( rings) for both the columns and plinth beam. The carpentry works involved covering up the sides and providing bracing against failure. A combination of 1'' X 12' boards, 2'' x 4'' planks of wood and 3'' nails were used for the carpentry works. The concrete was mixed to a mixed ratio of 1:2:4 conforming to the specified mix ratio in the structural design. The concrete was placed and compacted with a vibrating machine to avoid honeycomb and voids in the concrete. N.B - - ' sign denotes feet. An imperial system of measurement - '' sign denotes inches. An imperial system of measurement
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Timberwolves(m): 6:41pm On Mar 16, 2021 |
Job weldone For the concrete, you used 1:2:4, is the ratio by weight or by volume? can you share more light on this ? |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 8:37pm On Mar 16, 2021 |
Timberwolves: Thank you. The concrete mixture for this project was done by volume using head pans/ wheel barrows. 1 bag of cement would can be poured into 2 head pans, therefore the mix ratio by headpans was fone by mixing 1 bag of cement : 4 head pans of sand : 8 head pans of gravel. We put as little water as possible while still maintaining a workable mixture because workability of concrete is very important in concrete placement. For larger projects with significant concrete volume, harneyprojects employes the use of a batching plant where concrete is mixed by weight. |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Timberwolves(m): 10:36pm On Mar 16, 2021 |
that would be a rich concrete mix, keep it up one more thing, how do you cope with workmanship? I have one site at pyakasa, opposite lugbe, the labourers n artisans in that axis aren't much professionals as per construction industry is concerned |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 1:48am On Mar 17, 2021 |
Timberwolves: We have a team of artisans with whom we have developed a working relationship over many years. They understand the quality we desire and they deliver accordingly. 1 Like |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 2:06pm On Mar 19, 2021 |
Damp proof course (DPC )Works This involved filling up the foundation voids with laterite of significant volume, compaction with a mechanical compactor, placement of hardcore, carpentry works and concrete works. A damp proof membrane (DPM) was placed before concrete works to reduce the effect of the capillary action of moisture. https://www.youtube.com/watch?v=uRhMXdQ9Fso 1 Like
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 10:18am On Apr 04, 2021 |
Ground floor construction This involved masonry works, reinforcement works, carpentry works and concrete works. Reinfrocement works This involved the reinforcement works for the ground floor colunms and lintel . Y16mm reinforcement bars was used for the colunms with 10mm reinforcement bars for the links. The lintel had a combination of 12mm reinforcement bars and 10mm reinforcemnt bars for the links. The structural drawings for the columns indicated 4Y16 and the links are Y10 @ 200mm c/c . The lintel is also 4Y12 with links of Y10 @ 300mm c/c Masonry works This involved laying of 9'' and 6'' blocks bonded with mortar . The blocks are laid to the height specified in the architectural drawings . A combination of plum, line.,square and leveling instrument was used to ensure a well levelled block. Capentry works This involved the use of 1'' x12''x 12' , 1'' x 9'' x 12' , 1'' x 6'' x 12' machine sawed planks to cover the vertical sides and suffix of the lintels and colunms. A combination of 2'' x 4 '' woods and binding wire were used to brace the planks against failure. Concrete works This involved placement of insiitu concrete for the colunms and lintels. The mix ratio used was 1:2:4 and the concrete was well vibrated with a vibrating machine. A concrete mixer was used to ensure a consistent well mixed workable concrete. The Ground floor stage concluded with the laying of the final four courses of blocks on the lintel taking the height to the level specified in the architectural design. The plumber works for the ground floor and first floor was done to the specifications in the mechanical drawings N.B Mortar is a mixture of cement and sand in a mix ratio of 1:6 , Mortar is used to bond the sancrete blocks to achieve the desired bond type. The sharp sand can be partly or fully replaced with stone dust in location where stonedust is ready available. Experiments have shown that the best replacement for sharp sand with stonedust is a 50% partial replacement , this is also the best for partial replacement of sharp sand in concrete. https://www.youtube.com/watch?v=pBbDEFK4TNs
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 8:33am On Apr 05, 2021 |
Happy Easter from the Harneyprojects family
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 7:08pm On Apr 24, 2021 |
First floor Slab Construction This stage of work involves constructing the first-floor slab and beams based on the structural design of the structure. For this structure, a combination of 16mm reinforcement bars, 12mm reinforcement bars and 10mm reinforcement bars was used. TMT reinforcement was used as it is closer to the design tensile stress of 410N/mm2 than the other reinforcements in the market ( KAM reinforcement is also a very nice choice of reinforcement ). Formwork Placement This involved the placement of formwork comprising of 1"x 12" planks ( Marine boards are better due to strength and straightness of the boards and should be used if the budget permits), 2'' x 4 '' woods and bamboo for suffix support. A team of 5 carpenters worked for 5 days to complete this task. Reinforcement placement Reinforcement was placed based on the structural drawings. 12mm bars served as both the main and distribution bars for the slab while a combination of 16mm bars and 12mm bars were used as the main bars in the beams for both the tensile and compression zones. 10mm bars were used as links for the beams. Concrete Plcaement This follows the completion of the formwork and reinforcement placement. The concrete was mixed to a mix ratio of 1:2:4 in order to achieve the design concrete strength of 25N/mm2. A concrete mixer and poker vibrator was used to achieve a well compacted and workable concrete mix during the concreting. https://www.youtube.com/watch?v=YsjpXO6Ssvc
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 5:33pm On Apr 29, 2021 |
More pictures of the first-floor slab work
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 5:36pm On Apr 29, 2021 |
more.....
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 11:42am On Apr 30, 2021 |
First floor construction This involved masonry works, reinforcement works, carpentry works and concrete works for the lintel and columns. Reinforcement works This involved the reinforcement works for the first floor colunms and lintel . Y16mm reinforcement bars was used for the columns with 10mm reinforcement bars for the links. The lintel had a combination of 12mm reinforcement bars and 10mm reinforcement bars for the links. The structural drawings for the columns indicated 4Y16 and the links are Y10 @ 200mm c/c . The lintel is also 4Y12 with links of Y10 @ 300mm c/c Masonry works This involved laying of 9'' and 6'' blocks bonded with mortar . The blocks are laid to the height specified in the architectural drawings . A combination of plum, line., square and levelling instrument was used to ensure a well-levelled block. Due to the height involved, extra precautions were taking for the safety of the masons. Capentry works This involved the use of 1'' x12''x 12' , 1'' x 9'' x 12' , 1'' x 6'' x 12' machine sawed planks to cover the vertical sides and suffix of the lintels and colunms. A combination of 2'' x 4 '' woods and binding wire were used to brace the planks against failure. Concrete works This involved placement of in-situ concrete for the columns and lintels. The mix ratio used was 1:2:4 and the concrete was well vibrated with a vibrating machine. A concrete mixer was used to ensure consistent well mixed workable concrete.
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 7:28pm On May 07, 2021 |
More pictures
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 9:02am On May 14, 2021 |
Happy Sallah celebration to our Muslim brothers and sisters
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 2:01pm On May 14, 2021 |
Roof Construction This stage is divided into two units - Construction of the roof beam/ concrete facial - Construction of the Roof truss and placement of roof covering |
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 2:06pm On May 14, 2021 |
Roof beam/Concrete Facial The roof beam as a depth of 300mm and reinforcement detail that involved the use of 12mm bars as the main bars and 10mm bars as the links. Concrete facial with an horizontal/vertical pattern was used. Concreting was done after the completion of the reinforcement and formwork placement
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 3:25am On May 16, 2021 |
Roof truss/ Roof covering The roof truss was done with treated hardwood timber .The number used is listed below :- 2x6 @ 160pcs 2x4 @ 380pcs 2x3 @ 450pcs 2x2 @ 250pcs nails 4" inches @ 4 carton nail 3" inches @ 2 cartoon sohangram @ 3 gallon The roof covering used was 0.55mm thick aluminium shingle measuring 450sqm .
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 3:28am On May 16, 2021 |
More roofing pictures.
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 3:30am On May 16, 2021 |
Roof covering pictures..
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 10:16am On Jul 01, 2021 |
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 5:16pm On Jul 20, 2021 |
DESIGN | BUILD | REALESTATE
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 4:38pm On Dec 25, 2021 |
DESIGN | REAL | REALESTATE
|
Re: Kubwa-build Construction Diary Of a Block of 4 units of 2 bedroom flats in Abuja by Harneyprojects: 7:22am On Jan 01, 2022 |
Happy new year from the Harneyprojects team
|
(1) (Reply)
Luxury 3bedroom Duplex With Gerard Roofing Selling At Command/alagbado / 2 Bedroom of 4 Units for sale At Isawo, Ikorodu + Pictures / Housing Units For Sale @ Dantata Housing Estate, Kubwa Abuja - From N10.5m
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 52 |