892sqm Land For Mixed Development / 4 Unit 2 Bedroom Block Of Flats Design - One Plot / Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Construction of Block of Flats, Mixed development and more by folmus: 11:41am On Jan 29, 2022
Beautiful.

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 3:32pm On Feb 03, 2022
Form work and reinforcements for the gate/power house roof slab

2 Likes

Re: Construction of Block of Flats, Mixed development and more by Hatesin: 4:29pm On Feb 03, 2022
Aforxzy:
Sub structure works continues: Blinding & placement of column base rebars.

Is it really a good practice to blind only the colum bases, stand the starter pillars before actually blinding the rest of the trenches as you did here?
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 5:10pm On Feb 03, 2022
Would you prefer we blinded everywhere at the same time??

Blinding is to correct the uneveness of the excavated trench and also to provide cover for the rebars.

In this case we blinded the column bases first because the wall strips do not have any rebars on them and to prevent the iron bender walking over them during placement of the rebars.


Hatesin:


Is it really a good practice to blind only the colum bases, stand the starter pillars before actually blinding the rest of the trenches as you did here?

1 Like

Re: Construction of Block of Flats, Mixed development and more by Hatesin: 6:08pm On Feb 03, 2022
Aforxzy:
Would you prefer we blinded everywhere at the same time??

Blinding is to correct the uneveness of the excavated trench and also to provide cover for the rebars.

In this case we blinded the column bases first because the wall strips do not have any rebars on them and to prevent the iron bender walking over them during placement of the rebars.



So what you are saying is that it's not totally out of place to stand the columns first before proceeding with the strips blinding?
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 6:32pm On Feb 03, 2022
Yes. You will still achieve the same result.

Hatesin:


So what you are saying is that it's not totally out of place to stand the columns first before proceeding with the strips blinding?

1 Like

Re: Construction of Block of Flats, Mixed development and more by Hatesin: 6:51pm On Feb 03, 2022
Aforxzy:
Yes. You will still achieve the same result.


Ok.
Thanks for the clarification.

Coming to the rods, I have seen some people use 12mm for the bases and 16mm for the pillars.

How good is that?
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:10pm On Feb 03, 2022
I won't say good or bad cos most people just provide rebars without any structural design.

But the size and spacing of the rebars (iron rods) are determined from structural calculations based on the loading on the building.

From the calculated area of steel the structural engineer can recommend 12mm /16mm or any other diameter depending on his/ her choice of rebars at a particular spacing that will sufficiently support the load.

So it's the area of steel gotten ,that determines the size and spacing of the steel. If the area is such that 12mm is okay for the column bases then use 12mm and if 16mm is okay for the columns then it's good as well...

Hatesin:


Ok.
Thanks for the clarification.

Coming to the rods, I have seen some people use 12mm for the bases and 16mm for the pillars.

How good is that?

2 Likes

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 12:35pm On Feb 14, 2022
More works on the gate/ power house.


Contact us for your building construction works.

Pinettum: 08028136294

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:33pm On Feb 24, 2022
Plastering of gate house completed.

Pinettum.....08028136294

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 9:40am On Mar 04, 2022
External works

1 Like

Re: Construction of Block of Flats, Mixed development and more by Kingdemu: 12:16pm On Mar 04, 2022
This is lovely

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 5:45pm On Mar 04, 2022
Thanks.

Kingdemu:
This is lovely
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:10pm On Mar 17, 2022
External works continue.

Paving stones are used as pavement for external works.
They are the most suitable pavement in water logged areas. The space between the stones allows water to seep through it and ensure that water retention is reduced to minimum..
They are easy to install , maintain and repair.
They can be reused. They come in various shapes, sizes and colours.

They are referred to as interlocking paving stones because each piece of the paving stone is interlocked with the other piece to prevent movement of one part from the other.

They come mostly in 6mm and 8mm thickness. The 6mm thick is used for walk ways and light vehicular loads while the 8mm are for normal to heavy vehicular loads.

2 Likes

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:19pm On Mar 28, 2022
Some people lay nylon before placing the paving stones to prevent plants/ weeds from growing between the space.

See here.

Whichever method you choose, make sure the slope/ gradient is such that allow water to flow out of your property with ease and quickly too.

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:41pm On Apr 05, 2022
More pictures on the external works..


We are almost good to deliver.

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:16am On Apr 18, 2022
Happy Easter.

Contact us for your building construction

Pinettum: 08028136294

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 9:26am On May 13, 2022
We are experienced building/ civil engineering construction experts.
Call us for your projects today. Pinettum.....08028136294


You'll be glad you did.
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:21pm On May 28, 2022
We have completed the project.

Check out the night view.

1 Like

Re: Construction of Block of Flats, Mixed development and more by Kingdemu: 10:52am On May 29, 2022
Aforxzy:
We have completed the project.

Check out the night view.
Congrats

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 2:45pm On May 30, 2022
Thanks.


Kingdemu:
Congrats
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 4:46pm On Jun 07, 2022
Gate/ generator house

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 3:15am On Jul 07, 2022
Contact us for your construction works.

Pinettum: 08028136294
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:11pm On Aug 03, 2022
I need a transparent roller shutter. Any fabricator should please contact me. It's urgent.

Like this

Location: Lagos

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 10:04am On Sep 21, 2022
We are constructing a mixed development for our client in Lagos.
The building consists of a church auditorium, offices and residential apartments. The cark park is on the ground floor.

The buidling has three floors and a pent with two open well staircases, lift shaft and shear walls. The structureis framed in reinforced concrete slab with beams around the perimeter and within the slab to stiffened the panels as well as transfer loads through the columns and the shear walls to the foundation. The roof beams support the steel trusses.

The foundation type is raft beam and slab.
Re: Construction of Block of Flats, Mixed development and more by Akerewe(m): 9:11pm On Sep 21, 2022
Aforxzy:
Form work and reinforcements for the gate/power house roof slab

Pls like how many tons of steel for this decking?
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 10:36pm On Sep 21, 2022
For this reinforced concrete roof slab and beams, we used a total of about one ton of steel ( Y10&Y12 for the slab and beams, while Y16m bars for the beams).

Akerewe:

Pls like how many tons of steel for this decking?
Re: Construction of Block of Flats, Mixed development and more by Akerewe(m): 9:26am On Sep 22, 2022
Aforxzy:
For this reinforced concrete roof slab and beams, we used a total of about one ton of steel ( Y10&Y12 for the slab and beams, while Y16m bars for the beams).

Thanks for the Swift respond!
Is it possible to use 12mm for the pillars and also the beams including the slabs(decking)?

16mm for all the columns(pillars) or beams?
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 2:21pm On Sep 22, 2022
How many floors does your building has?

For your ground to first floor columns ( pillars
) please use 16mm bars.

Beam reinforcements are determined by the load it will be subjected to and the length/span of the beam. This will be calculated/ designed by the structural engineer. So I can't tell you the rebars to use on your beams.


However for the slab, Y12mm is very appropriate but the spacing depends on the load and span..

Do you have a structural drawing for your building?



Akerewe:

Thanks for the Swift respond!
Is it possible to use 12mm for the pillars and also the beams including the slabs(decking)?

16mm for all the columns(pillars) or beams?
Re: Construction of Block of Flats, Mixed development and more by Akerewe(m): 4:41pm On Sep 22, 2022
Aforxzy:
How many floors does your building has?

For your ground to first floor columns ( pillars
) please use 16mm bars.

Beam reinforcements are determined by the load it will be subjected to and the length/span of the beam. This will be calculated/ designed by the structural engineer. So I can't tell you the rebars to use on your beams.


However for the slab, Y12mm is very appropriate but the spacing depends on the load and span..

Do you have a structural drawing for your building?




It's a storey building on 30feets W by 60feets L
Re: Construction of Block of Flats, Mixed development and more by Akerewe(m): 4:45pm On Sep 22, 2022
Aforxzy:
How many floors does your building has?

For your ground to first floor columns ( pillars
) please use 16mm bars.

Beam reinforcements are determined by the load it will be subjected to and the length/span of the beam. This will be calculated/ designed by the structural engineer. So I can't tell you the rebars to use on your beams.


However for the slab, Y12mm is very appropriate but the spacing depends on the load and span..

Do you have a structural drawing for your building?





It's a storey building on 30feets W by 60feets L
Hmm, what if 12mm is already in the ground foundation of like 3 coaches foundation, is it possible to continue the remaining long pillars with 16mm?

structural design is at the back of the building plan but I think it's bn ignored because am not on ground physically but everybody checking it said the buildings ok so far but I still want to b on more saver side
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:03pm On Sep 22, 2022
Yes, it is good and better you continue the columns with 16mm bars.

Please don't ignore the structural drawings unless the building drawings has been completely altered.




Akerewe:



It's a storey building on 30feets W by 60feets L
Hmm, what if 12mm is already in the ground foundation of like 3 coaches foundation, is it possible to continue the remaining long pillars with 16mm?

structural design is at the back of the building plan but I think it's bn ignored because am not on ground physically but everybody checking it said the buildings ok so far but I still want to b on more saver side

1 Like

(1) (2) (3) (4) (5) (Reply)

500 acres at Kobape 10 mins off Abk/Sagamu Expressway - 180k/ acre / 13.5kva MIKANO GENERATOR, Year 2010, The Generator Is In Very Good Condition. / Beautiful Solid Wood Interior Doors With Veneer Finish FOR SALE

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 44
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.