(1) (2) (3) (Reply) (Go Down)

Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 7:53am On Jul 16, 2021
Project - construction of BIODIGESTER system of SOAKAWAY
Venue - Oke-Owa Area of Ijebu Ode, Ogun state, Nigeria
Days - 4days
Project cost - #250,000
Size - 3x6feet wide and 4feet deep

Day 1 - Digging of the pit and moving of material to the site

Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 8:30am On Jul 16, 2021
FACTS ABOUT BIO digester TOILETS YOU NEED TO KNOW

Biodigester toilets are biodegradable systems that turns solid waste into organic manure for a safe disposal into the environment.

These toilet waste digesters aim to address the liquid and solid waste water treatment issues associated with traditional means of waste water treatment methods that we have become accustomed to and grew up using.

Some of these methods included the use of pit latrine, ventilated pits (KVIP) and more modern waste treatment means like cesspit, culvert tanks and septic tanks.

What is different from these other toilet waste management systems?

Unlike the cesspit and septic tanks that requires periodic emptying, biofil waste toilet biodigesters as the name suggest are biodegradable and does not require emptying (dislodging) the way septic tanks require trucks to do that.

Before explaining how this is done, the biodigesters described in this article are NOT those that produce gas for domestic purposes.

Here are the facts about biodegradable digesters that you need to know:

FACT 1: Where does this solution come from? History of biodigester toilets

The history of biodigesters is not clear but they became prominent after the 2014 severe cholera outbreak in some parts of Accra.
The solution was first introduced to me in Nigeria by a Ghanaian friend.

The Ghana Government with the aid of the World Bank agreed that considering the sanitation situation especially in low income households in Accra, these biodegradable waste digesters from the test of the effluent level would avert the problems we have in the way human waste is managed traditionally in Accra and its environs.

The Government through the GAMA Project has since been constructing these digesters for home owners in low income areas. This technology has proven to be a better option than traditional foul smelling cesspits and septic tanks in Ghana and has since helped considerably in reducing the problems brought about by the lack of effective human waste management systems

for more detail and construction call/wathsapp : ACEWELL ENGINEERING 0805-272-95-58
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 12:28pm On Jul 16, 2021
Small but mighty
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 9:03am On Jul 17, 2021
Setting blocks of the biodigester pit

Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 8:09am On Jul 18, 2021
We move
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 11:42am On Aug 05, 2021
New innovation at it's best
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 6:41am On Aug 06, 2021
Biodigesters System is a modern way of
handling waste whereby

dislodging(exhausting) is eliminated to save on Future mentainance cost.

The biological tank break down human waste into water by

help of aerobic reactions and the water is then soaked away into a soakaway pit or trench drain.

Its cheaper than the obvious septic tank, its shallow as it goes for only 3 feet deep and that minimizing any possible risk,

it saves your space and also it doesn't produce disturbing stench(bad odours).

The system have been in use for more than 15 years and it have been proved efficient and reliable
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 5:30am On Aug 09, 2021
Biodigesters System is a modern way of
handling waste whereby

dislodging(exhausting) is eliminated to save on Future mentainance cost.

The biological tank break down human waste into water by

help of aerobic a reactions and the water is then soaked away into a soakaway pit or french drain.

Its cheaper than the obvious septic tank, its shallow as it goes for

only 3 feet deep and that minimizing any possible risk,

it saves your space and also it doesn't produce disturbing stench(bad odours).

The system have been in use for

more than 15 years and it have been proved

efficient and reliable

BENEFITS OF A BIO DIGESTER

Firstly, it is Cheaper than convenational septic tank.

One of its economic benefits is, the cost of installation.

The bio digester toilet is cheaper and quicker to install than the conventional septic tank

in that a standard bio digester toilet that can serve between 8 and 12 toilets can be done with 250K - 280k
while a bigger one that can serve many toilets can be done with 320k - 350k

I'm sure you know how much it costs to sink a concrete septic tank in a waterlogged environment.

Secondly,
the Bio Digester toilet take just a small space and leaves you with more land for other economic activities.

In contrast, the conventional septic tank toilet takes so much space

thereby robbing you of other economic activities the land can be used for.

[i]Thirdly[/i],
No dislodging.
This is in fact why so many people are abandoning their septic

tank toilet for the bio digester toilet.

You see dislodging truck showing up every now and then to evacuate

feces from the septic tank. The cost of evacuation varies from area to area.

The bio digester toilet puts a permanent stop to this.

No truck will show up for feces evacuation as the human

waste is effectively treated at the source and then turns the

waste to manure that can be used for agricultural purposes.
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 4:04pm On Aug 10, 2021
Very. Innovative
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 1:22pm On Aug 16, 2021
Change has started
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 11:23am On Aug 27, 2021
The solution is here already, don't waste your land and money

Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 7:49am On Aug 28, 2021
Doing what you we know how to do best
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 12:05pm On Aug 28, 2021
Moving ahead
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 12:40pm On Aug 30, 2021
We are available for your stamped concrete floor.
Do you need to change the look of your compound, beautiful the look and save from unwanted grass by interlocking,
Stamped concrete floor keeps your compound neat and from unwanted grass.
It doesn't grow algae.
Once it's done that's how it's going to be.
We are Affordable
Call/WhatsApp ACEWELL ENGINEERING 080-52-729-558
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 2:13pm On Sep 01, 2021
Biodigesters System is a modern way of
handling waste whereby
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 10:36pm On Sep 03, 2021
phabulousangel:
The solution is here already, don't waste your land and money
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 8:50am On Sep 04, 2021
Another conversion of the already dig soak away to a biodigester system

Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 7:07am On Sep 07, 2021
phabulousangel:
Small but mighty
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 7:02am On Sep 08, 2021
Biodigesters System is a modern way of
handling waste
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 10:52am On Sep 09, 2021
Is a new normal
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 6:22pm On Sep 13, 2021
Happy New week
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 6:41pm On Sep 14, 2021
it saves your space and also it doesn't produce disturbing stench(bad odours).
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 5:03pm On Sep 16, 2021
New innovation
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 8:57am On Sep 20, 2021
What a golden week
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 12:10pm On Sep 22, 2021
Stop living in the past, BIODIGESTER IS A NEW NORMAL.
SMALL LAND SPACE,
SMALL MONEY,
ZERO MAINTENANCE,
ENVIRONMENTAL FRIENDLY.

To construct a standard SOAKAWAY cost between 450k to 550k but a standard biodigester cost far less than this and with biodigester, it is zero evacuation/maintenance

Call/ wathsapp - ACEWELL ENGINEERING 0805-2729-558
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 2:14pm On Sep 26, 2021
All round the country
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 4:30pm On Sep 30, 2021
Otta ogun state on site
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 7:49am On Oct 03, 2021
What a happy day
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 5:02pm On Oct 07, 2021
SANGO OTA done and dusted now Ibadan on site then lekki Lagos
Re: Construction Of BIODIGESTER SYSTEM SOAKAWAY In Ijebu Ode by phabulousangel(m): 8:59pm On Oct 12, 2021
Lekki ajah on course

(1) (2) (3) (Reply)

Hectares And Plots Of Land For Sale At Osogbo, For Just N400,000 / How Much Will A 2 Flat Decking Cost In Benin-city / Cement Required To Cast Parapet/ Cement Facial

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 30
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.