Loko Oweto Bridge Vs The Second Niger Bridge by DonXavi(m): 8:57pm On Aug 19, 2022
�LOKO OWETO BRIDGE VS THE SECOND NIGER BRIDGE ..

✍️This is the 2.2km Loko-Oweto Bridge that connects Benue to Nassarawa ( Both State in the North Central)...

✍️It was done and dusted without any noise and fanfare... it is also not tolled.

✍️The Construction of this Bridge started in 2011 and was completed and delivered in 2020. This Bridge is not in any form or manner tolled .

✍️This Bridge is way longer than the Second Niger Bridge that connects the south west and south south to the south east

✍️I never saw any news in the media asking the indigenes of Benue and Nassarawa state to carry gay cows and atilogwu dance to go and thank Goodluck Jonathan and Buhari

✍️But, everyday human beings with grey matter in their cranium ( abi is it pig pooh pooh?), will always remind us to dobale before Buhari for allowing the continuation of work on the 1.6km Second Niger Bridge that will be tolled and levied ...

✍️The FGN and her private sector partners, who funded the construction of this Second Niger Bridge at an outrageously overinvoiced cost, when compared to the longer Loko -Oweto Bridge, will toll it to recover the cost of construction from us plus profit over a period of 30 years plus .

✍️Me and other Bridge users will pay for the cost of this Bridge plus margin, via tolling, despite the fact that it was done with part of the oil revenue from my Imo state and our taxes

✍️Please next time, as a southern Nigerian ( from SW, SS and SE,) before you post the picture of the uncompleted Second Niger Bridge and ask us to dobale before Buhari, take a good look at the picture of this LOKO OWETE Bridge , stare into the mirror, look at the person staring back at you... do you know who he is ? MUMU MAN



#DoubleStandards

12 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by DonXavi(m): 9:03pm On Aug 19, 2022
Those with gullible mindset are saying that Igbos are not appreciating Buhari.
How can Igbos appreciate him when he put toll to get the expenses back with profits?
It is only in Igbo land they can marginalize and expect praises for what they have done differently from other regions.
They should come out openly and mention other region where they are collecting toll.
Hopeless government.

23 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by NoIgboSoundTueh: 9:23pm On Aug 19, 2022
Igbos will forever be grateful to President Muhammad Buhari for massive infrastructure built in SE. The many roads, the bridge.
Funnily the GEJ we worship left SE to rot yet we love him and hate the man who done everything in terms of infrastructure for us.
God bless Buhari

14 Likes 4 Shares

Re: Loko Oweto Bridge Vs The Second Niger Bridge by paramakina202: 9:23pm On Aug 19, 2022
This second Niger bridge looks like 18th century bridge in this modern time.

13 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by DonXavi(m): 9:24pm On Aug 19, 2022
Second Niger bridge and Rehabilitation of the Enugu international Airport that are the only projects APC federal government can show in the entire South East region for 7 years, now let us compare with Duara that is just a town in Kastina state that is found in the North West Region. The list goes down to over 25 projects in Duara alone. Not the entire North or West o.

6 Likes

Re: Loko Oweto Bridge Vs The Second Niger Bridge by duro4chang(m): 9:51pm On Aug 19, 2022
DonXavi:
Second Niger bridge and Rehabilitation of the Enugu international Airport that are the only projects APC federal government can show in the entire South East region for 7 years, now let us compare with Duara that is just a town in Kastina state that is found in the North West Region. The list goes down to over 25 projects in Duara alone. Not the entire North or West o.
Tell us the projects done by the PDP in the South east after all these years.

3 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by EndsarsReloaded: 9:54pm On Aug 19, 2022
DonXavi:

Those with gullible mindset are saying that Igbos are not appreciating Buhari.
How can Igbos appreciate him when he put toll to get the expenses back with profits?
It is only in Igbo land they can marginalized and expecting praises for what they have done differently from other regions.
They should come out openly and mention other region where they are collecting toll.
Hopeless government.

Extremely annoying!!!

4 Likes

Re: Loko Oweto Bridge Vs The Second Niger Bridge by AsabaPropertyAg(m): 10:02pm On Aug 19, 2022
My brother you are on point but there is nothing we can do, this APC must go, they see south east as enemy.

DonXavi:
�LOKO OWETO BRIDGE VS THE SECOND NIGER BRIDGE ..

✍️This is the 2.2km Loko-Oweto Bridge that connects Benue to Nassarawa ( Both State in the North Central)...

✍️It was done and dusted without any noise and fanfare... it is also not tolled.

✍️The Construction of this Bridge started in 2011 and was completed and delivered in 2020. This Bridge is not in any form or manner tolled .

✍️This Bridge is way longer than the Second Niger Bridge that connects the south west and south south to the south east

✍️I never saw any news in the media asking the indigenes of Benue and Nassarawa state to carry gay cows and atilogwu dance to go and thank Goodluck Jonathan and Buhari

✍️But, everyday human beings with grey matter in their cranium ( abi is it pig pooh pooh?), will always remind us to dobale before Buhari for allowing the continuation of work on the 1.6km Second Niger Bridge that will be tolled and levied ...

✍️The FGN and her private sector partners, who funded the construction of this Second Niger Bridge at an outrageously overinvoiced cost, when compared to the longer Loko -Oweto Bridge, will toll it to recover the cost of construction from us plus profit over a period of 30 years plus .

✍️Me and other Bridge users will pay for the cost of this Bridge plus margin, via tolling, despite the fact that it was done with part of the oil revenue from my Imo state and our taxes

✍️Please next time, as a southern Nigerian ( from SW, SS and SE,) before you post the picture of the uncompleted Second Niger Bridge and ask us to dobale before Buhari, take a good look at the picture of this LOKO OWETE Bridge , stare into the mirror, look at the person staring back at you... do you know who he is ? MUMU MAN



#DoubleStandards
Re: Loko Oweto Bridge Vs The Second Niger Bridge by seunmsg(m): 10:03pm On Aug 19, 2022
The second Niger bridge was fully funded by FG. No private sector contributed a kobo to the project. If the bridge is tolled after completion, it’s to generate revenue to the government and nothing else.

7 Likes 3 Shares

Re: Loko Oweto Bridge Vs The Second Niger Bridge by obiekunie01: 10:03pm On Aug 19, 2022
seunmsg:
The second Niger bridge was fully funded by FG. No private sector contributed a kobo to the project. If the bridge is tolled after completion, it’s to generate revenue to the government and nothing else.

oga! don't provoke alusi okija to visit you!


Second Niger bridge IS NOT AN APC GOVERNMENT PROJECT!

It is JOINTLY FUNDED - The bridge was financed under a public private partnership (PPP) WITH 60% OF THE FUNDING COMING FROM THE CONTRACTOR GITTO GROUP. ONLY 20% OF THE FUNDING CAME FROM FEDERAL GOVERNMENT and 10 per cent each from Anambra and Delta State Governments!

THE FEDERAL GOVERNMENT SHOULD STOP CLAIMING IT BUILT 2ND NIGER BRIDGE - IT COULD NOT EVEN RAISE THE 20% FUNDING AS AGREED. SO FAR, FED. GOVT. HAS CONTRIBUTED ONLY 11% OF ITS 20% AND ALLOTTED THE REMAINING 9% TO THE CONTRACTOR TO OFFSET IT AND GET AN ADDITIONAL 5 YEARS to manage the bridge making it 35 years on concession instead of the initial 30 years agreed on.

5 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by YourhealthNG2(m): 10:03pm On Aug 19, 2022
Well said..

Front page pls

Cc: Mynd44, Seun, OAM4J
Re: Loko Oweto Bridge Vs The Second Niger Bridge by YourhealthNG2(m): 10:04pm On Aug 19, 2022
seunmsg:
The second Niger bridge was fully funded by FG. No private sector contributed a kobo to the project. If the bridge is tolled after completion, it’s to generate revenue to the government and nothing else.
Liar



https://www.google.com/amp/s/www.thisdaylive.com/index.php/2022/04/04/2nd-niger-bridge-linked-engineering-work-completed-to-be-unveiled-october/amp/
Re: Loko Oweto Bridge Vs The Second Niger Bridge by ajekpaks(m): 10:21pm On Aug 19, 2022
okay
Re: Loko Oweto Bridge Vs The Second Niger Bridge by Spandau: 11:52pm On Aug 19, 2022
seunmsg:
The second Niger bridge was fully funded by FG. No private sector contributed a kobo to the project. If the bridge is tolled after completion, it’s to generate revenue to the government and nothing else.

Hmḿmm! Kadoso Mutairu!
Re: Loko Oweto Bridge Vs The Second Niger Bridge by seunmsg(m): 12:22am On Aug 20, 2022
obiekunie01:


oga! don't provoke alusi okija to visit you!


Second Niger bridge IS NOT AN APC GOVERNMENT PROJECT!

It is JOINTLY FUNDED - The bridge was financed under a public private partnership (PPP) WITH 60% OF THE FUNDING COMING FROM THE CONTRACTOR GITTO GROUP. ONLY 20% OF THE FUNDING CAME FROM FEDERAL GOVERNMENT and 10 per cent each from Anambra and Delta State Governments!

THE FEDERAL GOVERNMENT SHOULD STOP CLAIMING IT BUILT 2ND NIGER BRIDGE - IT COULD NOT EVEN RAISE THE 20% FUNDING AS AGREED. SO FAR, FED. GOVT. HAS CONTRIBUTED ONLY 11% OF ITS 20% AND ALLOTTED THE REMAINING 9% TO THE CONTRACTOR TO OFFSET IT AND GET AN ADDITIONAL 5 YEARS to manage the bridge making it 35 years on concession instead of the initial 30 years agreed on.

Sadly, the false part in bold is what some deluded folks from the SE are spreading. Can you bring up just a link to support your claim that Gitto is funding the project? You guys just read nonsense from Twitter and rush to post same here without thinking. How can Gitto, a rival construction company be providing 80% of the funding for a bridge being constructed by Julius Berger? Are you guys this daft?

Even if paid influencers are lying and deceiving, are you not supposed to use your senses?

For the avoidance of doubt, the Muhammadu Buhari bridge is not a PPP. It is fully funded 100% by the FG. Peter Obi Pandora supporters must stop this silly lies. It is becoming embarrassing to be honest. Jonathan only paid for the engineering design of the project and the early works. He did not even award the contract for the main construction of the bridge before leaving office. Buhari awarded the contract for the bridge and provided 100% funding. All credits goes to him and no one else.

9 Likes 2 Shares

Re: Loko Oweto Bridge Vs The Second Niger Bridge by EmeraldJD: 12:24am On Aug 20, 2022
Oh! So Loko-Oweto bridge is longer than second Niger bridge? shocked ahn ahn.. then why all the noise about it as if it's the second wonder of the world after my wife's jellof rice?

6 Likes

Re: Loko Oweto Bridge Vs The Second Niger Bridge by Evergreen4(m): 3:32am On Aug 20, 2022
seunmsg:
The second Niger bridge was fully funded by FG. No private sector contributed a kobo to the project. If the bridge is tolled after completion, it’s to generate revenue to the government and nothing else.
Next time, verify information before you conclude. The bridge is a PPP project oga

2 Likes

Re: Loko Oweto Bridge Vs The Second Niger Bridge by Spandau: 4:10am On Aug 20, 2022
seunmsg:


Sadly, the false part in bold is what some deluded folks from the SE are spreading. Can you bring up just a link to support your claim that Gitto is funding the project? You guys just read nonsense from Twitter and rush to post same here without thinking. How can Gitto, a rival construction company be providing 80% of the funding for a bridge being constructed by Julius Berger? Are you guys this daft?

Even if paid influencers are lying and deceiving, are you not supposed to use your senses?

For the avoidance of doubt, the Muhammadu Buhari bridge is not a PPP. It is fully funded 100% by the FG. Peter Obi Pandora supporters must stop this silly lies. It is becoming embarrassing to be honest. Jonathan only paid for the engineering design of the project and the early works. He did not even award the contract for the main construction of the bridge before leaving office. Buhari awarded the contract for the bridge and provided 100% funding. All credits goes to him and no one else.

As hard as you try, your Buhari is a disaster. Provide a link that Buhari completed the project 100% too. Buhari is a disaster and those who associate or ascribe any success to him are also disasters.

Kadoso Mutairu!

2 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by Nobody: 4:13am On Aug 20, 2022
The 2.1km loko oweto bridge was built with N51bn and un-tolled..

The 1.6km Second Niger bridge would cost almost N400bn and tolled for 35 years
...

Buhari you did well, but whats really going on?

3 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by Buccalcavity2: 4:52am On Aug 20, 2022
YourhealthNG2:

Liar



https://www.google.com/amp/s/www.thisdaylive.com/index.php/2022/04/04/2nd-niger-bridge-linked-engineering-work-completed-to-be-unveiled-october/amp/

Did you read your own link? I can't see any private sector funding in there o. You probably want to share another link.

2 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by pointblank247(m): 5:37am On Aug 20, 2022
seunmsg:


Sadly, the false part in bold is what some deluded folks from the SE are spreading. Can you bring up just a link to support your claim that Gitto is funding the project? You guys just read nonsense from Twitter and rush to post same here without thinking. How can Gitto, a rival construction company be providing 80% of the funding for a bridge being constructed by Julius Berger? Are you guys this daft?

Even if paid influencers are lying and deceiving, are you not supposed to use your senses?

For the avoidance of doubt, the Muhammadu Buhari bridge is not a PPP. It is fully funded 100% by the FG. Peter Obi Pandora supporters must stop this silly lies. It is becoming embarrassing to be honest. Jonathan only paid for the engineering design of the project and the early works. He did not even award the contract for the main construction of the bridge before leaving office. Buhari awarded the contract for the bridge and provided 100% funding. All credits goes to him and no one else.
Thunder and Amadioha make una come finish this pertological lieing son of lie Mohamed
Re: Loko Oweto Bridge Vs The Second Niger Bridge by buksarki: 6:53am On Aug 20, 2022
This is not good for one Nigeria.
Re: Loko Oweto Bridge Vs The Second Niger Bridge by Omihanifa: 6:55am On Aug 20, 2022
Lol
Re: Loko Oweto Bridge Vs The Second Niger Bridge by Moh247: 6:55am On Aug 20, 2022
cool

1 Like

Re: Loko Oweto Bridge Vs The Second Niger Bridge by seunmsg(m): 7:59am On Aug 20, 2022
Evergreen4:
Next time, verify information before you conclude. The bridge is a PPP project oga

Lol, you’re talking rubbish and still telling me to go and verify your rubbish. Exactly how Peter Obi will spew nonsense and then shout go and verify. You guys always think Nairaland is your village square where you all tell and believe each other’s lies.

The Second Niger bridge is being funded 100% by the Federal government. It is not a PPP or whatever project. There is no one kobo of any private investor in the funding. Stop lying like Peter Obi.

5 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by obaaderemi: 8:18am On Aug 20, 2022
DonXavi:
�LOKO OWETO BRIDGE VS THE SECOND NIGER BRIDGE ..

✍️This is the 2.2km Loko-Oweto Bridge that connects Benue to Nassarawa ( Both State in the North Central)...

✍️It was done and dusted without any noise and fanfare... it is also not tolled.

✍️The Construction of this Bridge started in 2011 and was completed and delivered in 2020. This Bridge is not in any form or manner tolled .

✍️This Bridge is way longer than the Second Niger Bridge that connects the south west and south south to the south east

✍️I never saw any news in the media asking the indigenes of Benue and Nassarawa state to carry gay cows and atilogwu dance to go and thank Goodluck Jonathan and Buhari

✍️But, everyday human beings with grey matter in their cranium ( abi is it pig pooh pooh?), will always remind us to dobale before Buhari for allowing the continuation of work on the 1.6km Second Niger Bridge that will be tolled and levied ...

✍️The FGN and her private sector partners, who funded the construction of this Second Niger Bridge at an outrageously overinvoiced cost, when compared to the longer Loko -Oweto Bridge, will toll it to recover the cost of construction from us plus profit over a period of 30 years plus .

✍️Me and other Bridge users will pay for the cost of this Bridge plus margin, via tolling, despite the fact that it was done with part of the oil revenue from my Imo state and our taxes

✍️Please next time, as a southern Nigerian ( from SW, SS and SE,) before you post the picture of the uncompleted Second Niger Bridge and ask us to dobale before Buhari, take a good look at the picture of this LOKO OWETE Bridge , stare into the mirror, look at the person staring back at you... do you know who he is ? MUMU MAN



#DoubleStandards
The question is why did Jonathan not build the second Niger bridge for the south south and southeast people who gave their whole hearts to him? Instead he went up north to build a bridge for those who didn't give a hoot about him. So why are you blaming Buhari now?

2 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by DonXavi(m): 10:17am On Aug 20, 2022
duro4chang:
Tell us the projects done by the PDP in the South east after all these years.
Although the bridge was started by PDP but both PDP and APC have been so unjust to the South East. They have not treated SE fairly but as a conquered territory.
Re: Loko Oweto Bridge Vs The Second Niger Bridge by Nobody: 10:33am On Aug 20, 2022
Evergreen4:
Next time, verify information before you conclude. The bridge is a PPP project oga

Why do you guys have such a natural penchant and love for telling barefaced lies? Such a patently dishonest people. Where do you see any private sector partner or funding mentioned below?

Or are the Nnewi band of billionaires the private sector partner you are talking off? You guys are shameless and always driven by hate.

Per your mission of discrediting those you hate you must always lie shamelessly. Please Google Nigerian Sovereign Investment Authority before you try and lie they are the the private sector partners to the FG in this project. Peter Obi=average IPOBian=shameless liars.

3 Likes 1 Share

Re: Loko Oweto Bridge Vs The Second Niger Bridge by nedu666: 10:36am On Aug 20, 2022
candidtalk:


Why do you guys have such a natural penchant and love for telling barefaced lies? Such a patently dishonest people. Where do you see any private sector partner or funding mentioned below?

Or are the Nnewi band of billionaires the private sector partner you are talking off? You guys are shameless and always driven by hate.

Per your mission of discrediting those you hate you must always lie shamelessly. Please Google Nigerian Sovereign Investment Authority before you try and lie they are the the private sector partners to the FG in this project. Peter Obi=average IPOBian=shameless liars.


Stfu u Arrow. Its a ppp project.
Re: Loko Oweto Bridge Vs The Second Niger Bridge by ASAPFERG1: 10:42am On Aug 20, 2022
If I was buhari, I wouldn't even do anything in that unpleasant clay sand sad beast region. .
God created them to be marginalised and hated cool

2 Likes 2 Shares

Re: Loko Oweto Bridge Vs The Second Niger Bridge by Christistruth00: 10:53am On Aug 20, 2022
DonXavi:

Those with gullible mindset are saying that Igbos are not appreciating Buhari.
How can Igbos appreciate him when he put toll to get the expenses back with profits?
It is only in Igbo land they can marginalized and expecting praises for what they have done differently from other regions.
They should come out openly and mention other region where they are collecting toll.
Hopeless government.


The first Niger Bridge is still free you can use that one instead

2 Likes 1 Share

(1) (2) (Reply)

Zamfara Governor, Dauda-lawal To Be Conferred With Democracy Heroes Award / Declare State Of Emergency In Borno Says Igbo Elders / Nigerian Breweries Invest 15 Billion Naira To Expand It's Factory In Aba.

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 56
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.