Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left - Travel (2) - Nairaland

Nairaland Forum / Nairaland / General / Travel / Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left (26457 Views)

Pelumi Nubi Involved In Accident While Driving By Road From London To Lagos / I Am Traveling From Asaba To Onitsha Today, This Is How Prepared I Am (Photos) / 12.4km Stretch Of Parked Trailers On The Road In Lagos (PHOTO) (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by blaise26abj(m): 6:50am On Oct 20, 2022
When it comes to new infrastructures , Buhari really tried . Maintenance of existing ones though- zero . Kudos to him on that . I hope he has packed his bags ? Can’t wait for him to be gone .

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Mrkumareze(m): 6:53am On Oct 20, 2022
They re still working at the onitsha/owerri road link. While the Asaba linking point is still a virgin land, they haven't even done Bush clearing.

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Daddyyin: 6:54am On Oct 20, 2022
OnionBandit:
grin

Peter Obi started the foundation

See evidence in the attachment


That time wey e never deep for cult. Na black uniform Peter Obi dey wear now

2 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Lionnation: 6:55am On Oct 20, 2022
Babachukwu:
Let them finish it, the only project we got from APC
you didn't get it from APC you are to pay for it

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by arsenal33: 6:57am On Oct 20, 2022
iHateFraudsters:
Thanks to G.E.J
Thank him terrorism too
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by OnionBandit(f): 6:57am On Oct 20, 2022
Daddyyin:



That time wey e never deep for cult. Na black uniform Peter Obi dey wear now
True o! grin grin
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by twilliamx(m): 6:58am On Oct 20, 2022
Robinmido:
If only the money was used in education system or the money used to pay pensioners i would have like it. The bridge is nice but it is not supposed to be the number one priority
Don't say anything if you don't know what to say. You really sound dumb while trying to sound intelligent

3 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by NwaAdazzi(m): 6:58am On Oct 20, 2022
The bridge is completed but the Connecting roads nko a12km road

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by arsenal33: 6:58am On Oct 20, 2022
Robinmido:
If only the money was used in education system or the money used to pay pensioners i would have like it. The bridge is nice but it is not supposed to be the number one priority
ingrate spotted

4 Likes 2 Shares

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by olugabbie(m): 7:01am On Oct 20, 2022
Babachukwu:
Let them finish it, the only project we got from APC


There is no civilians government in Nigeria that has done well in infrastructure like the Buhari led administration. The upgrade of our major airports (Lagos & Abuja), Rail project, Lagos-Ibadan road (90% completed), 2nd Niger Bridge e.t.c were done majorly under this administration.

But they failed woefully in the two most important areas, SECURITY & ECONOMY.

3 Likes 1 Share

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Mrpojj(m): 7:02am On Oct 20, 2022

3 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Nobody: 7:03am On Oct 20, 2022
Akwamkpuruamu:
Good one. But the tolling is shortchanging the people of the East

Removal of tolling on federal roads is why we have bad roads.

Better the bridge is tolled. Oil money cannot meet all our needs.

Better all other roads are tolled too

2 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Akwamkpuruamu: 7:07am On Oct 20, 2022
Kasssandra:


Removal of tolling on federal roads is why we have bad roads.

Better the bridge is tolled. Oil money cannot meet all our needs.

Better all other roads are tolled too
is there any road in the North been tolled?

4 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by voltron14: 7:08am On Oct 20, 2022
Babachukwu:
Let them finish it, the only project we got from APC

Zik Mausoleum dey there too.
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by phorget(m): 7:12am On Oct 20, 2022
seguntijan:
Every top politcian, even soldiers since Shagari's time (1980s) used the 2nd Niger bridge to play okoso.

They promised and failed. Woefully.

It came to 1999, PDP took over. They used the bridge to campaign. They harvested unparalleled votes from SE people. Elections came and went. Nothing nothing.

It got to Jonathan, he promised to go on exile. Nothing nothing. Na Mali e dey go now sha on Buhari's behalf.

Atiku and Obi (Aki and Paw Paw) came too. They used the same bridge to campaign. Voice mail!

Ladies and gentlemen, the rejected stone has become the headstone. Buhari who is viølently hâted by a lot of the people has done it.

They even refused him audience with Ohanaeze. In fact, they didn't reply his letters. Man wrote thrice 2015, no response.

Everything Buhari wished to do, they mount barriers. Despite the distractions, the general with his commanding officer Fashola have delivered. Full dose.

They once said nothing was going on there. That it was a ruse. But today, they say Jonathan paid for it. Oh what a shame.

But we move. Fashola is a Tinubu protege. Where they were made, they keep promises. Tinubu will take the bridge template to other projects and deliver them.

That's the difference between substance and style. In this case, the Buhari government has earned both.
I salute them.

We were called names because of Buhari. But today, one of the biggest projects executed in Nigeria by government is that bridge. We, who support Buhari deserve accolades. Between us and those who support IPOB that imposed sit at home and múrder our people, it's obvious who loves the land.

May God bless Buhari and his team. The promise keepers. This is marvelous.



Thank you for your eloquence, I hope a bag of rice is 15,000 naira in your area sha? i hope you can travel on rail or train without whispering some prayers along your journey.

If you consider constructing a bridge is the ultimate achievement then Congratulations.
Government is continuous and it is their duty to deliver infrastructures without expecting applause from the nationals but we Nigerians do see the government effort as a favor.
We elected them for a purpose and if they can't deliver then they should quit and that is simple enough.

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by zoedew: 7:12am On Oct 20, 2022
WHO SAYS IT IS NOT UNLIKELY THAT IPOB WILL, SOMEDAY, BLOW UP THAT BRIDGE.
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Corporate2020: 7:13am On Oct 20, 2022
Onyi90:
I thought the Minister Fashola said it has been completed. Which one is this news again undecided

Show us the one your PDP completed
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by phorget(m): 7:13am On Oct 20, 2022
Akwamkpuruamu:
is there any road in the North been tolled?


Ask the mumu abeg.
It is only igbos that should be suffering and smiling without complaining.

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by phorget(m): 7:14am On Oct 20, 2022
Corporate2020:


Show us the one your PDP completed


Bag of rice is now 45k bro.
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by humberjade: 7:15am On Oct 20, 2022
Nicoddemus:
You borrowed trillions of naira for infrastructure and was only able to deliver 10% while the rest was looted by your cronies, plunging us into the highest figure of external depth in history. Now we're poverty capital of the world. Are there expecting gratitude from us? No it's a shame

APC failed!!!

Yeah APC failed by a mile to say the least, but is PDP any better? For a party who invested trillions in the power sector only to give us undiluted darkness, despite the fact that the price of crude oil tripled what we have now? They have no moral ground to seek power ever again, hence, they should crawl into any available hole abeg.

2 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by luluosas(m): 7:17am On Oct 20, 2022
Good one. But come 2023, we are sending APC packing just as we did to PDP in 2015. Let's test a new breath with Labour Party and Peter Obi on the saddle.
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by muykem: 7:17am On Oct 20, 2022
Robinmido:
If only the money was used in education system or the money used to pay pensioners i would have like it. The bridge is nice but it is not supposed to be the number one priority
Are you for real? Children have taken over nairaland.

3 Likes 1 Share

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Slynation(m): 7:20am On Oct 20, 2022
seguntijan:
Every top politcian, even soldiers since Shagari's time (1980s) used the 2nd Niger bridge to play okoso.

They promised and failed. Woefully.

It came to 1999, PDP took over. They used the bridge to campaign. They harvested unparalleled votes from SE people. Elections came and went. Nothing nothing.

It got to Jonathan, he promised to go on exile. Nothing nothing. Na Mali e dey go now sha on Buhari's behalf.

Atiku and Obi (Aki and Paw Paw) came too. They used the same bridge to campaign. Voice mail!

Ladies and gentlemen, the rejected stone has become the headstone. Buhari who is viølently hâted by a lot of the people has done it.

They even refused him audience with Ohanaeze. In fact, they didn't reply his letters. Man wrote thrice 2015, no response.

Everything Buhari wished to do, they mount barriers. Despite the distractions, the general with his commanding officer Fashola have delivered. Full dose.

They once said nothing was going on there. That it was a ruse. But today, they say Jonathan paid for it. Oh what a shame.

But we move. Fashola is a Tinubu protege. Where they were made, they keep promises. Tinubu will take the bridge template to other projects and deliver them.

That's the difference between substance and style. In this case, the Buhari government has earned both.
I salute them.

We were called names because of Buhari. But today, one of the biggest projects executed in Nigeria by government is that bridge. We, who support Buhari deserve accolades. Between us and those who support IPOB that imposed sit at home and múrder our people, it's obvious who loves the land.

May God bless Buhari and his team. The promise keepers. This is marvelous.
As much as Buhari failed in most aspects, he effectively delivered the second Niger bridge and construction of double lane road from Umunya to Awka...!! He tried and deserved some accolades, But his overall performances was nothing to write home about...

1 Like 1 Share

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Simplythebest: 7:25am On Oct 20, 2022
The only visible project did by Buhari for the people of South East is still not free, the have already put toll gate in it. So what did south east benefit from this government pls can someone tell me?
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Nicoddemus(m): 7:31am On Oct 20, 2022
humberjade:


Yeah APC failed by a mile to say the least, but is PDP any better? For a party who invested trillions in the power sector only to give us undiluted darkness, despite the fact that the price of crude oil tripled what we have now? They have no moral ground to seek power ever again, hence, they should crawl into any available hole abeg.


We're not talking about PDP here my friend
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by zcee: 7:32am On Oct 20, 2022
Only project in south east which is supposed to be a normal basic infrastructure govt should provide for the people and we are celebrating..
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Tinubuagbado: 7:33am On Oct 20, 2022
Thanks to Goodluck Jonathan
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Nobody: 7:37am On Oct 20, 2022
Akwamkpuruamu:
is there any road in the North been tolled?

Is any road in the north in good shape?

Most of them are in bad shape.

That is why i said every road in nigeria must be tolled.

Get it?

1 Like

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Bigleaf1006: 7:39am On Oct 20, 2022
Akwamkpuruamu:
Good one. But the tolling is shortchanging the people of the East

Pls quit this rather pedestrian posture of urs,there are tolled roads and bridges everywhere in the world this isn't new.

Would you rather pay a token for toll or have no new bridge into the east,consider the socio economic benefits of this bridge,this bridge alone will reduce transit time by 1hr or even 2 hrs,onitsha will be less congested and rapid development move out to the outskirts.

My brother what ever till u will pay on that bridge will be worth it and if u don't want to pay any toll,the old niger bridge is still available as an alternative and free.

2 Likes

Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by victorazy(m): 7:40am On Oct 20, 2022
noyd911:
This is actually a good development.
God bless PMB
God bless our incoming president PO


God bless Yardua
God bless GEJ
God bless Nig
Re: Update On Second Niger Bridge: Only 4km Approach Road From Asaba Left by Painsoother(m): 7:41am On Oct 20, 2022
Kasssandra:


Removal of tolling on federal roads is why we have bad roads.

Better the bridge is tolled. Oil money cannot meet all our needs.

Better all other roads are tolled too
Mounting tolling points on the yet to be completed 2nd niger bridge plus linking road that is just about 13.6km while the closely 500km completed northern roads and railways that are already in use but without a single tolling point. Isn't that the height of bigotry?

(1) (2) (3) (4) (Reply)

NRC Begins Free Train Rides From Aladja-Warri To Itakpe-Abuja / Two Children From Same Parents Crushed To Death By Reckless Driver In Ogun (Pic) / Accident Along Kaduna-zaria Express Way(graphic Pic)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.