Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:04pm On Dec 07, 2022 |
Hello all, We are set to embark on a construction of a 3 storey block 2 and 3 bedroom flats, located at orogwe, Imo State. Client: Nairalander Design and construction: Frank designs and construction ltd. #FDC Project Stages: Foundation (Strip & Pad) Ground floor block work 1st floor slab First Floor Blockworks 2nd floor slab Second Floor Blockwork 3rd floor slab Third floor block works to parapet Roofing. Building Size/Area: 10.1 x 23.4m Budget : not available Duration: to be determined. Kindly join us as we commence this project from start to finish. You can find the Building design below; 1 Like
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by qwertyboss(m): 8:23pm On Dec 07, 2022 |
Frankdesigns:Contact Meta Horizons for your Structural designs... Efficiency, accuracy, reliability and economy in our analysis and designs... We also provide manual designs services if desireable... https:///message/BJ6OUFLZAF2QE1
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 1:18pm On Dec 10, 2022 |
We started with the fencing of the site few weeks ago
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 1:30pm On Dec 10, 2022 |
Them proceeded to install a rolling gate.
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 6:36am On Dec 12, 2022 |
For the fencing we used about; #2300 - 5" solid blocks 43 bags of cement @4400/bag 4 lengths of 16mm @8000/length 3 lengths of 12mm @4600/length 3 lengths of 8mm @2500/length 3 trips of sand @28000/trip Chippings Binding wire -2 small rolls @1000/each Nails - 3 and 2" - 5 pounds each 1x12 board - 16pcs @2000 each 2x2 - 10pcs @400 each Etc. |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 7:11am On Dec 12, 2022 |
Setting out and excavation commenced for the main building this past week. Depth of trench - 4ft Depth of Column base - 5ft
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by topsy23: 10:28am On Dec 12, 2022 |
Following. Weldone sir |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 6:05am On Dec 13, 2022 |
topsy23: Thanks |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by gratefulheart(m): 8:32pm On Dec 13, 2022 |
can we see the back and sides views of the design? Frankdesigns: |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:52pm On Dec 13, 2022 |
gratefulheart: Maybe later 1 Like |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:55pm On Dec 13, 2022 |
Blinding of the foundation trench and column base has commenced
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 11:40pm On Dec 14, 2022 |
Materials arriving to site
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Nobody: 5:23am On Dec 15, 2022 |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 2:51pm On Dec 18, 2022 |
Mounting of columns 6Y16
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:09am On Dec 22, 2022 |
Available |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Bigbright7(m): 10:13pm On Dec 27, 2022 |
Well done Mr Frank, this is a challenging project and I commend you for putting your best and coming out with an amazing design for your project. Would you mind complimenting your beautiful project with professional electrical installers? We specialize in all aspect of electrical installations for industrial, commercial and residential buildings. Check my signature and get intouch. |
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 6:04am On Jan 07, 2023 |
Block works coming up
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 6:05am On Jan 07, 2023 |
More block work and casting of columns
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:03am On Jan 29, 2023 |
Formwork for Chain beam ongoing
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:12am On Jan 29, 2023 |
first filling done and watering ongoing as well as Blinding of internal block work with weak concrete
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:18am On Jan 29, 2023 |
Chain beam done. Compaction ongoing
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:24am On Jan 29, 2023 |
Oversite concrete being done. We used the chain beam as a sort of formwork for the oversite concrete.
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:34am On Jan 29, 2023 |
Block forming
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:36am On Jan 29, 2023 |
More pictures
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:43am On Jan 29, 2023 |
We're up
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:49am On Jan 29, 2023 |
Block work to lintel done
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:53am On Jan 29, 2023 |
Meanwhile, soak away was excavated and blinding is being done here.
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:57am On Jan 29, 2023 |
Mounting of column reinforcement 6Y16
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 4:56pm On Feb 02, 2023 |
Formwork for lintel and columns
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 1:38pm On Feb 08, 2023 |
Casting of lintel ongoing
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 12:38pm On Feb 10, 2023 |
Levelling
|
Re: Construction Of A 3 Storey Block Of 2 And 3 Bedroom Flats. by Frankdesigns(m): 8:43pm On Feb 21, 2023 |
We're bringing in materials for 1st deck. Carpentry works Bamboo 200pcs 1x12 400pcs 1x6 50pcs 2x2 120pcs Plywood 2pcs 80kg waterproof membrane 3" nail 2 bags 2" nail 2 bag
|
Plots Of Land Now Selling Beside Crown Estate Ajah For 3m: / Two Plots Of Land For Sale @ Isawo, Owutu, Agric, Ikorodu, Lagos / Mini Flat,2bedroom,3bedroom,duplex To Let Around Ikeja, Maryland Magodo,ogudu Ax
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |