Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,613 members, 7,827,306 topics. Date: Tuesday, 14 May 2024 at 10:23 AM

Royal Duplex In Anambra - Properties (10) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Royal Duplex In Anambra (26869 Views)

Doctor Godwin Maduka Builds 100 Houses For Widows & Less Privileged In Anambra / Owner Of Mansion Swept Away By Flood In Anambra Threatens To Kill Himself (Photo / Twin Duplex In Aso Rock Villa For Lease In Abuja With Pictures (2) (3) (4)

(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) (Reply) (Go Down)

Re: Royal Duplex In Anambra by spyder880(m): 11:08pm On Dec 13, 2011
The size of this house will be 50ft x 55ft, with a 12ft x 14ft sit out at the front of the house. Just making sure its like that before we start forming blocks.

Re: Royal Duplex In Anambra by spyder880(m): 11:41pm On Dec 13, 2011
If you are thinking of building this size of house, it will consume some good amount of money, check out our current costs at this first stage.


S/N MATERIAL OR JOB QTY RATE TOTAL

FOUNDATION AND DPC

1 SETTING OUT 10,000.00
2 BUNDLES OF PEG 3 400.00 1,200.00
3 2X3X12 WOOD 23 180.00 4,140.00
4 3" NAIL 3 120.00 360.00
5 EXCAVATION 42,600.00
6 SAND 6 67,500.00
7 GRAVEL 6 150,000.00
8 CEMENT 150 1,850.00 277,500.00
9 BLOCKS 1320 120.00 158,400.00
10 12MM IRON RODS 42 58,400.00
11 BINDING WIRE 1 2,450.00
12 6MM RODS 50 350.00 9,500.00
13 1X12X12 WOOD assorted 29,500.00
14 LABOUR FOR BLINDING 41,000.00
15 LABOUR FOR BLOCKWORK/LABOUR 51,000.00
16 LABOUR FOR CASTING PILLARS 22,000.00
17 LABOUR FOR FILLING 26,000.00
18 TRIPS OF FILLING SAND (IF NEEDED)
19 IRON BENDER 16,800.00
20 CARPENTER 20,000.00
21 MIXING OF CONCRETE FLOOR SLAB 60,000.00
22 TRANSPORT AND LOADING/OFFLOADING 20,000.00
23 WATER 23,500.00


1,091,850.00



We still have some materials on the ground from these ones paid for, like 6mm rods, sand stone and wood, we shall reuse some of the woods seen in the pics and only buy some when we want to do the first floor lintels.
Re: Royal Duplex In Anambra by rastaman20(m): 8:15am On Dec 14, 2011
Oga spyder880, u are grin
the Teacher, Now the fun begins!!!!!!. Here I am to learn more.Eze comes back to School.
Re: Royal Duplex In Anambra by atasteve: 8:40am On Dec 14, 2011
Lord Spyder880, I must first of all commend your taste for perfection, unfortunately this is not a common practise as many builders are always in an hurry to consider details. You ensured that the dimension of the building was accurate, thumb up to you. smiley

21 MIXING OF CONCRETE FLOOR SLAB 60,000.00 does the cost include the casting of the german floor?
Re: Royal Duplex In Anambra by spyder880(m): 9:02am On Dec 14, 2011
^^^^ yes bro, the N60k includes all the casting, mixing, pouring and the 3 masons ranging the german floor, they worked for 2 days wages.

Work continues today as we shall start forming blocks on the foundation. We shall start buying more blocks today, meanwhile we are starting with the few remaining blocks we have on site. More pictures later today.
Re: Royal Duplex In Anambra by rastaman20(m): 4:05pm On Dec 14, 2011
Oga spyder880, keep up the good work, eyes are itcching for pics!!! Lol
Re: Royal Duplex In Anambra by Fhemmmy: 4:17pm On Dec 14, 2011
Looking awesome . . . .
Re: Royal Duplex In Anambra by Jussi(m): 5:31pm On Dec 14, 2011
Gbam cheesy
Re: Royal Duplex In Anambra by Fhemmmy: 5:41pm On Dec 14, 2011
Show us more oh
Re: Royal Duplex In Anambra by spyder880(m): 5:43pm On Dec 14, 2011
My people, thank you very much. We are still on site, laying the first blocks for this great mansion. (Captured on camera already).
We bought 700 blocks today to add to the 187 or so in the site.
Re: Royal Duplex In Anambra by Fhemmmy: 6:31pm On Dec 14, 2011
How many blocks could be laid in a day assuming you have a full labour presence
Re: Royal Duplex In Anambra by spyder880(m): 6:58pm On Dec 14, 2011
^^^ up to 1000 blocks, but we are taking it slowly because this stage needs much care.
Re: Royal Duplex In Anambra by Fhemmmy: 7:28pm On Dec 14, 2011
^^ Fair
Re: Royal Duplex In Anambra by spyder880(m): 1:33am On Dec 15, 2011
What will building be like without pictures? grin grin grin

The first line of blocks in this magnificent mansion is being laid, and all glory goes to GOD ALMIGHTY, for his mercies, his blessings, his endowments, his enablements, his empowerment, his benevolence, his provisions, his magnanimity, his love and kindness, should I go on

Re: Royal Duplex In Anambra by spyder880(m): 1:41am On Dec 15, 2011
great things start small

Re: Royal Duplex In Anambra by olubuffett: 1:43am On Dec 15, 2011
@Sypder
I beg go on no stop o, He is just too much, the excellently excellent, The Greatest of the Great, The wonderful designer,
Re: Royal Duplex In Anambra by spyder880(m): 1:45am On Dec 15, 2011
olubuffett:

@Sypder
I beg go on no stop o, He is just too much, the excellently excellent, The Greatest of the Great, The wonderful designer,

Yesooooo!!!
Re: Royal Duplex In Anambra by olubuffett: 1:47am On Dec 15, 2011
When i see buildings start like this i just they happy for the owner.
Re: Royal Duplex In Anambra by spyder880(m): 1:54am On Dec 15, 2011
more

Re: Royal Duplex In Anambra by spyder880(m): 1:58am On Dec 15, 2011
more

Re: Royal Duplex In Anambra by spyder880(m): 2:09am On Dec 15, 2011
and this is only the sit out grin grin

Re: Royal Duplex In Anambra by spyder880(m): 2:16am On Dec 15, 2011
more

Re: Royal Duplex In Anambra by spyder880(m): 2:20am On Dec 15, 2011
more

Re: Royal Duplex In Anambra by caseymoney(m): 2:25am On Dec 15, 2011
Duplex coming out good. Nice job Spyder.
Re: Royal Duplex In Anambra by spyder880(m): 6:35am On Dec 15, 2011
^^^ Thank you bros.
Re: Royal Duplex In Anambra by rastaman20(m): 1:06pm On Dec 15, 2011
olubuffett:

@Sypder
I beg go on no stop o, He is just too much, the excellently excellent, The Greatest of the Great, The wonderful designer,
you have said it all, THE FIRST AND THE LAST ,,,,,,,, JAH ALWAYS GUIDE
Re: Royal Duplex In Anambra by Fhemmmy: 4:47pm On Dec 15, 2011
Keep it up, Sir
Re: Royal Duplex In Anambra by spyder880(m): 5:05pm On Dec 15, 2011
We are trying to hit 4 lines of blocks all round the house (window level) work still in progress as more materials are arriving. Cement, blocks, water and sand are arriving so we dont lack any material. More pictures at night.
Re: Royal Duplex In Anambra by rastaman20(m): 5:46pm On Dec 15, 2011
winkkeep the good work!!!!!
Re: Royal Duplex In Anambra by Trustworth(m): 6:40pm On Dec 15, 2011
Eyes misting.
Looking forward to my own as well, In Jesus Name.
AMEN!
Re: Royal Duplex In Anambra by Fhemmmy: 6:44pm On Dec 15, 2011
spyder880:

We are trying to hit 4 lines of blocks all round the house (window level) work still in progress as more materials are arriving. Cement, blocks, water and sand are arriving so we dont lack any material. More pictures at night.

Eyes are itchy . . . Without any financial delay, what is the time frame to end this project till painting?
Re: Royal Duplex In Anambra by spyder880(m): 7:47pm On Dec 15, 2011
@ trustworth, am ready anyday anytime.
@ Baba Fhemmmmy, with full supply of funds, 4 months.

(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) (Reply)

My Experience With A Landlord In Ibadan / My Hostile Neighbor / South Africans Hijacked A Nigerian's House

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 32
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.