Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,697 members, 7,816,850 topics. Date: Friday, 03 May 2024 at 06:46 PM

Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi (22937 Views)

What 188MW Geometric Power Plant Means For Aba Residents / Vice President Shettima Commissions Geometric Power Plant In Aba / Peter Obi In Abia State For The Commissioning of Aba Geometric Power (Pictures) (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Nicoddemus(m): 1:54pm On Mar 07
Kosoco:
Please someone in Aba should confirm... infact I'm going there myself.

Almost a month now our area at OgborHill, Aba do not have light angry
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by muykem: 1:54pm On Mar 07
We have been scammed.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Gboom: 1:56pm On Mar 07
The man is saying the truth.
Ideally, the power project should be testing run for at least a month before commissioning. All these it political brainwashing up and down should stop if Nigerians want real progress.

2 Likes

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Kaiser20: 2:04pm On Mar 07
Ayo25:
Whenever I see any news of some phantom developments ongoing in Abia under Oti, I laugh very hard. Understandably, Abians have suffered neglect for so long under successive administrations that any semblance of development is celebrated with pomp and pageantry
EPI PA AWON BAD BELLE PEOPLE!

1 Like 1 Share

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by SalamRushdie: 2:10pm On Mar 07
paramakina202:
Geometric are currently installing free recharge meters in houses and apartments in Aba and environs.
Why blame state government when the project isn't state owned?

Is geometrics now a DISCO? Is it on PHCN lines they want to install metre?
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by paramakina202: 2:17pm On Mar 07
SalamRushdie:


Is geometrics now a DISCO? Is it on PHCN lines they want to install metre?

Yes a DISCO covering 9 LGAs in Abia state.The difference is that they generate and distribute energy to consumers and bill them too.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Faposky95: 2:22pm On Mar 07
As long as the commissioning had a lot of APC written all over it.......something fishy had to accompany it......
Let there be light, didn't come with wait till Meter complete....
if there's light, we'll all see
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Elidrisy20: 2:23pm On Mar 07
He remain me of our late deputy Senate president ikay Okworomadu
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by kayceejazz: 2:32pm On Mar 07
24/7 electricity, some people never see light for almost two weeks
Kosoco:
Please someone in Aba should confirm... infact I'm going there myself.

1 Like

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by sukar886: 2:40pm On Mar 07
Mumu man
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by offongk(m): 2:44pm On Mar 07
Light come by 9pm and go by 5:30pm or 6pm max.

I stay in ABA


Kosoco:
Please someone in Aba should confirm... infact I'm going there myself.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by adams123: 2:58pm On Mar 07
nony43:
Commissioned in a Hurry to please who? Abia state Government has already said it will start functioning fully in few weeks time.

Why rushing for commissioning in the first place when the project is yet to be ready for use?

This man is right here

1 Like

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by adams123: 3:00pm On Mar 07
MarketDispatch:
Going by the topic, what has the writer got to say about Buhari and Dangote Refinery commissioning

He equated this power project to that if you truly read
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by jmoore(m): 3:02pm On Mar 07
paramakina202:


Yes a DISCO covering 9 LGAs in Abia state.The difference is that they generate and distribute energy to consumers and bill them too.
Geometric is GENCO, Aba power is DISCO. Both are seperate companies owned by one person.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by gbengayandipo20: 3:05pm On Mar 07
It doesn't mean that it must take off immediately and supply all the areas, it's stage by stage. Edo state 95megawatt OSSIOMO power of Obaseki was test runned in November 2020 and has been working till now with willing customers connecting but was commissioned recently in December 2023.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by jmoore(m): 3:05pm On Mar 07
offongk:
Light come by 9pm and go by 5:30pm or 6pm max.
I stay in ABA

It depends on the feeder. The majority are complaining of lack of power.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by tivity101: 3:06pm On Mar 07
Pls go and give us update cos we nor trust bad Belle people

Kosoco:
Please someone in Aba should confirm... infact I'm going there myself.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Arabaincubus: 3:15pm On Mar 07
Bad belle
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Glassysea(m): 3:17pm On Mar 07
Useless goat
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by VanuatuWycombe: 3:22pm On Mar 07
Kosoco:
Please someone in Aba should confirm... infact I'm going there myself.

Wait make I pick my car key. I dey go check am too myself.

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by christistruth01: 3:38pm On Mar 07
paramakina202:


Prove where he claimed credit.

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by paramakina202: 3:41pm On Mar 07
[quote author=christistruth01 post=128824876][/quote]

This is no prove.Post where Otti claimed credit for Geometric power plant.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by VanuatuWycombe: 3:44pm On Mar 07
Can Abians who have gotten prepaid meters from Geometric Power start sharing pictures and videos of it here please?

Let’s put these people on their toes. Let’s challenge other state governors to start something like this.
There is no state that cannot generate a minimum of 400megawatts of electricity daily. It’s just that they are all bunch of th!eves.

We read somewhere on a thread where a state is using N110 billion monthly to pay salaries to unproductive people. Half of this is sto!len buy our greedy civil servants. Another 1/4 goes to ghost workers. Only 1/4 goes to real, lazy unproductive staff.

At N1600 to $1, paying N110 billion monthly as salaries is like paying $68,750,000 monthly.
Are the state civil servants working offshore? Are they space scientists?

This money our governors are stealing can build power generation, transmission, and distribution companies for states.

Having steady electricity would spur growth in each state and won’t put governors under political pressure to keep employing dullards who have nothing to offer our states.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by christistruth01: 3:49pm On Mar 07
paramakina202:


This is no prove.Post where Otti claimed credit for Geometric power plant.

You see the truth and still deny it
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by paramakina202: 4:21pm On Mar 07
christistruth01:


You see the truth and still deny it

Where is the truth?
Otti is a governor so you should be able to have video or newspaper evidence where he claimed credit easily.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by callthefred: 4:26pm On Mar 07
lexyclasy:
No wonder this man could not win in Gubernatorial because his level of thinking would have been a disaster to Abians, just look at the people he is commending, Orji Kalu, Theordor Orji and Ikpeazu of all people, looks funny, and is this man aware that the project is a private own and not state government owned, the only thing that may hinder the operations of the plant is to put finishing touches with the Transmission Company of Nigeria-TCN and Gas agreement supply to the plant and identification of customers which the state has already indicated interest for bulk purchase of power generation to Aba and Umuahia, so this man is not abreast in the happenings of his state only but Badbelle.

And they had to commission a project before finalizing agreement with TCN and others on gas supply??

This is according to you or did I miss something here Sir.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by NSK4U(m): 4:54pm On Mar 07
We still love Otti, do your own make we see

1 Like

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by nony43(m): 4:56pm On Mar 07
adams123:


Why rushing for commissioning in the first place when the project is yet to be ready for use?

This man is right here


Same way Buhari rushed to commission Nigerian air that didn’t function or Dangote refinery that is yet to refine a drop of oil.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by NSK4U(m): 4:58pm On Mar 07
jmoore:

It depends on the feeder. The majority are complaining of lack of power.

How did you source the majority??
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by Praying4Nigeria: 5:04pm On Mar 07
paramakina202:
Geometric are currently installing free recharge meters in houses and apartments in Aba and environs.
Why blame state government when the project isn't state owned?
This is good news. Youths should demands their other State Governors to do same.

1 Like

Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by OALandAgents: 5:06pm On Mar 07
Thank God it was done in a hurry! More government should also be in a hurry to positively impact the live of their people.
Re: Aba Geometric Power Project Commissioned In A Hurry — Sir Udensi by beyondPen(m): 5:09pm On Mar 07
paramakina202:
Geometric are currently installing free recharge meters in houses and apartments in Aba and environs.
Why blame state government when the project isn't state owned?

Why did the LP government takes credit then for the project?

(1) (2) (3) (4) (Reply)

Stop Moaning... Petrol Is 326.21 Naira a litre in the UK! / Justice Abang Suspends PDP Convention / Jubril Gawat: Lagos Blue Line Rail Will Be Electric

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.