PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: . by Nobody: 9:08pm On Jul 18, 2012
.
Re: . by Nobody: 7:56pm On Aug 10, 2012
.
Re: . by Nobody: 7:57pm On Aug 10, 2012
.
Re: . by Nobody: 7:58pm On Aug 10, 2012
.
Re: . by ahf(m): 7:02am On Aug 11, 2012
very very good stuff !! thumbs up !!!
Re: . by Nobody: 9:51pm On Aug 14, 2012
.
Re: . by Humanbeans(m): 9:31am On Sep 07, 2012
Great job, ytech. My assumption is that it will take about 15-17 M to finish a 4 bedroom duplex. Pls correct me if I'm wrong.
Re: . by Nobody: 9:28am On Sep 10, 2012
.
Re: . by Humanbeans(m): 1:17pm On Sep 10, 2012
Ytechconst: @humanbeans. Its not so. Maximum time frame to complete a standard detach duplex is 4months if fund is readily available. For semi-detached duplex like this maximum 5-6months. In the case of this project we had to pause during subsidy period because of fluctuation of market price of building materials so we had to revisit the bill of quantities of the project to re-negotiate and reach an agreement before we proceed. That is the reason why we used 8months on this project.

I'm actually referring to money, and not months.
Re: . by Nobody: 9:55am On Sep 11, 2012
.
Re: . by FLORIDACAR: 6:57am On Feb 14, 2013
Quite impressive, extral ordinary amount of professionalism exhibited . My best on Nairaland so far. Kudos!
Re: . by rexxx: 4:05pm On Feb 14, 2013
I like the tiolet fittings. How much did a shower cabin cost
Re: . by Nobody: 6:09am On Feb 15, 2013
.
Re: . by TBrownAuto(m): 9:25am On Feb 16, 2013
can you plz tell me the name of the paint used it charming
Re: . by Nobody: 7:24am On Feb 18, 2013
.
Re: . by kunlekunle: 7:49am On Feb 18, 2013
where can i get concrete paint and pigments, and exernal wood paint in lagos?
Re: . by mufutau55(m): 2:32am On Aug 20, 2013
Ytechconst, Any new construction/project lately? And what is progress update on this lovely building?
Thank you.

Hajji Mufutau
Re: . by Nobody: 7:42am On Aug 20, 2013
.
Re: . by mufutau55(m): 2:48pm On Aug 20, 2013
Ytechconst:

This project has is completed since July 2012, but 2units similay to this is ongoing at the same omole estate phase 1, still on the substructure level because of the soil terrain, we are doing steel cased driveIn pile foundation.

You can check my recent post here I've opened a thread for the project.


Thank you.. I will check for the new thread.. I surely followed and enjoyed your construction thread..
May be one day I will have enough fund to engae your services. Thank you.

Are you refering to the new thread on consturction in Magodo Phase 2? If so, I am there now, if not, point me to it.

Hajji Mufutau
Re: . by kunlekunle: 6:54am On Aug 21, 2013
where can i get kitchen cabinets and at what cost.
Re: . by Nobody: 10:31pm On Aug 21, 2013
.
Re: . by Nobody: 6:48am On Sep 14, 2018
,,

(1) (2) (3) (Reply)

/ ,, / Check The Pix Of Pop, Stamping & Interlocking, Tilling, Precious Stone Designed

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 11
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.