Abiibus's Posts
Nairaland Forum › Abiibus's Profile › Abiibus's Posts
1 (of 1 pages)
What is the basis for the cost estimate? Design (Architectural, structural, electrical and mechanical drawing) should be the basis for cost estimate. Materials specification also plays a major role in determining the cost estimate. I will advise you to budget like 18m and consult a well experience construction project manager to liase with other professional and come up with the design and materials specification that will meet your budget without compromising standard. I you need further advise on how to realise you dream house, feel free to contact me: abiodun@hermonproject.com. 08034344983 |
Your architectural design did not conform with statutory requirements in terms of setback. Based on the available space and the irregularity of the land, you can build this duplex almost the cost of your 4 bedroom duplex. If you need the complete drawings including structural engineering drawing for pad foundation and the bill of quantities (BOQ) call or send mail to abiodun@hermonproject.com, 08034344983
|
Your architectural design did not conform with statutory requirements in terms of setback. Based on the available space and the irregularity not the land, you can build this duplex almost the cost of your 4 bedroom duplex. If you need the complete drawings including structural engineering drawing for pad foundation and the bill of quantities (BOQ) call or send mail to abiodun@hermonproject.com, 08034344983
|
Building collapse will continue until National Assembly do the needful by passing into law National Building Code. National Building Code spells out the role of each professional in built environment and the procedures for building production in Nigeria. 1. ARCON registered Architect: To produce architectural working drawings 2. COREN registered Structural Engineer: To produce structural engineering drawings 3. COREN registered Electrical & Mechanical engineer : To produce electrical and mechanical drawings respectively. 4. Quantity surveyor: To produce complete Bill of quantities. 5. CORBON registered Builder: To produce following document and ensure its implementation om site. A. Construction Quality Management Plan B. Construction Health & Safety plan C. Construction program of work D. Construction Methodology. Builders are statutory empowered to manage entire Building production on site while other professionals only supervise their input. |
Wonder shall never end |
1 (of 1 pages)