Chekitaut's Posts
Nairaland Forum › Chekitaut's Profile › Chekitaut's Posts
1 2 3 4 5 6 7 8 ... 104 105 106 107 108 109 110 111 112 (of 152 pages)
Unbeatable OFFER Granite dust(stonedust) Mainland 30tons = 70k Island, Ikoyi, Lekki-Ajah 30tons = 80k Call for Granite order. |
Unbeatable OFFER Granite dust(stonedust) Mainland 30tons = 70k Island, Ikoyi, Lekki-Ajah 30tons = 80k |
Block production Shape sand only Stonedust only Shape sand + Stone dust Stonedust only will require low quantity of cement because both are from same family nature. i.e 50kg of cement can produce good 37blocks, but this can not be done with Shape sand. 50kg of cement will produce 28-30 block with shape sand |
profkris:Dangote cement sell for 1,900-2,000 depend on the quantity. |
Unbeatable OFFER Granite dust(stonedust) Mainland 30tons = 70k Island, Ikoyi, Lekki-Ajah 30tons = 80k |
mallamhabib:Pls don't be a victim. Dangote never sell at this price |
GEJ was not honored like this... ![]()
|
I bless God for the grace on Nairaland wish I received, I was d 1st to state prices of materials on the forum what I met was give me your email or I text you, sm Nairalander uses my prices to benchmark aswell, but one thing I know strongly it require a inner mind to state if you want to be rip off or not. Money, Engineer, Labour, Supplier and Owner can be the reason of rip off. People that can understnd are Aventure, Segcymore, Pmil, Junapril, owner's I cant count Take for example Aventure will always request for pulkit or Tiger Iron rod because is full and meet standard Segcymore will go for nothing less than Ukraine Iron Rod which is the best, some will prefer local which is not full and not all met standard Granite some times the buyer is the reason for rip off. take for example 30tons load to Lekki-Ajah is btw 140k-145k, but buyer will negotiate for 120k, is simple a ton of 3/4Down(5/ is N2200 direct from Quarry and cost of transport with Revenue tickets is 75k, If you remove 75k from 120k = 45k/2200=20.4tons. imagine that and you want 30tons you can not get it under the SunLekki-Ajah supplier will charge 180k-200k for 30tons i don't blame them but still will deliver less, that is the reason most owner's/Engineer call for granite themselves. Cement: No doubt those buying 1bag, 10Bags may be victim of the rebag, My delivery is minimum of 300bags, when cement is hot is direct from loading, some seller buy direct from people that do rebag because is cheap they make more profit. is simple just get your scale arround scale randomly Sand: i call it Nite market, we have different type of loading 1. Ashawo bed, is load in a sag form 2, Tansho, hip only in the middle of the bucket 3, Bambam, front to back hip 4, Yo idi e, after loading driver will drop small somewhere else if you have more than 4loads all the drop out will be load back as one load 5, Offloading skill, they will deliver 2trips as 3rips all these applicable to Granite. Some supplier will tell you the granite will arrive @ nite so you will not see what there are bringing. Why some do not compromise quantity. Shape Sand at Sand field is 24k-27k within ajah and Bogeje for 10tons and 20tons is 34k-48k excluding transport Filling sand 10tons is 8k and Bambam is 15k from field transport excluded no transport on filling is less than 20k Transload filling is what you see at abraham adesanya Junction in Ajah. an experience: an order was requested for a trailer load of Cement(900bags) the engineer now called me Engineer: Oga na u dey bring Cement? Me: Yes Engineer: Bring 600bag i request for 900bag so u will deliver 300bags to a site at Ikotun for me. Me: Tell Oga to give the direction. Imagine that |
Is a pity I was here late, but my Oga(Spyder) have spoken well, the item I pity people most on is Granite, Iron rod, Cement and Sand THESE ITEMS are the most expensive in building. In a simple word ucan only be rip off if you are greedy, selfish and when you try to do what is called ITK. Is difficult to get an honest supplier, but sometimes client tend to miss them up. In my own case client pays for my honesty, transparency...
|
Come may 29, no transmission of handing over. |
...is going, amazing |
ebony202000:N1,950/bag |
Another N25 add to price of cement by May 14, 2015 by Dangote. |
on thursday 14, May 2015 another big blow from Dangote. N25 increase will commence. Which way Nigeria. |
Just materials, Granite, Iron Rod, Cement, Sand all at pocket friendly prices |
IHate9ja1:50-70naira/bag |
Bookmarked |
igwedexy:Sand for 10cubic is 23,000(Sand only) transportation cost depend on your destination... |
Aventure good one there and all others that has written, my observation is that the foundation is low you need one or two block round... i wonder why people do not like use Pillars for a bungalow building. Your blocks are not good product, you can fill holes with weak concrete. |
From Lagos-Island, Victoria-Island, Banana Island, Ikoyi, Lekki to Songotedo [size=14pt]Granite= N4,350/Ton[/size](Transportation Fee included) Minimum Order=60tons [size=14pt]Stone Dust= N2,800/ton[/size](Transportation Fee included) Minimum Order=60tons Call Now: 08055545355, 08032887233 |
1 2 3 4 5 6 7 8 ... 104 105 106 107 108 109 110 111 112 (of 152 pages)
is N2200 direct from Quarry and cost of transport with Revenue tickets is 75k, If you remove 75k from 120k = 45k/2200=20.4tons. imagine that and you want 30tons you can not get it under the Sun