Clean Naija used RX330 (Tokunbo standard) First body Sound Engine and Gear[b][/b] Custom papers available (imported from the South Korea). Late 2020 Clean original leather seats(not torn yet) Clean black interior Reverse camera Parking sensor Full panoramic Chilling AC Functional full panoramic roof Factory tinted glasses Location- kola alagbado Price- 4.8m Call 07063383501 |
Excavation of Drainage line and fence foundation commence Excavation details Width : 1.4m Depth :0.7m Length : 113m We proposed a sandcrete blockwall drain line width of drain:600mm in to in width Block size: 225mm=9inch
|
Project Name: Construction of office complex and show room Client:private company Company:Western buildpro infrastructure development LTD |
[color=#990000]Phase 1 Construction of perimeter drainage and perimeter fencing of the land Due to the topography of the land,it is required we have a perimeter drainage at the back of the perimeter fence area in order to prevent storm water from damaging the foundation of the fence,which could lead to frequent collapse of the fence.so we have to create a Channel to discharge the storm water flowing form the sharp gradient of land |
Week 2 activities 1)Foundation digging of foundation 2)Casting of foundation base(blinding) 3)Placing and aligning of foundation pad reinforcement(commonly called basket) and column starter bar 4)casting of foundation pad 5) foundation block setting |
Attached is the proposed Event hall development
|
Location: Otta Week 1 Mobilization:All material and tools needed for construction is been moved to site Drawing review:As seen in the drawing,the architectural drawing proposed we have column in the middle of the Event hall but for me that too conventional and it also take space out of the needed space of the hall,also columns can be an obstruction for guest sitting at the back of the hall.so therefore reason for removing the Centre columns Modication; We therefore design our columns to span end to end which is about 10.45 width and hall length is about 21m, so we will be having our columns at 3m c/c around the hall perimeter Mobilization |
Project duration:6month Note:project duration can be less than 6month but client suggested we go for 6month due to finance plan |
Attached is the architectural drawing of proposed Event Hall
|
Project:Construction of proposed Event Hall and guest house Client: private client Contractor:Olu-Ben unique service LTD [b][/b] |
Concrete Frame structure in building Concrete frame structures are a very common - or perhaps the most common- type of modern building internationally. As the name suggests, this type of building consists of a frame or skeleton of concrete. Horizontal members of this frame are called beams and vertical members are called columns. Humans walk on flat planes of concrete called slabs.Of these, the column is the most important, as it is the primary load-carrying element of the building . If you damage a beam or slab in a building, this will affect only one floor, but damage to a column could bring down the entire building. Here is a typical example of what a full frame structure looks likes,this methodology is typically used for construction of high rise buildings and super high structures.
|
Your phone nos? |
Kindly give us a call right away and be rest assured we gonna serve you better |
Let help get your roofing wood supply to your door step with no hassle,it is a process you can always trust,hard wood of various size is available for sales |
MrFinbarr:How much does it cost to change your stereo?am really interested in changing mine too but just want to know the cost implication |
Stack of wood in factory
|
I have large quantity of timber supply on ground for supply in anywhere in Nigeria,kindly contact me and I will give you a cost effect rate Just give us your specifications Timber type: Sizes: Location: Payment terms and agreement: Delivery direct to site with no cost of transportation Company:OLU-BEN UNIQUE SERVICE LTD Km 7 idiroko road,ota,ogun state Factory address:timber field,beside winner chapel saki,oyo state,Nigeria. Phone:07063383501
|
5 tanks |
Reinforcement detailing for the walls and slab of the tank vault
|
Placement of reinforcement for base and walls commence consultmal97: consultmal97:
|
Placement of high yield steel commence for the tank base and walls |
Blinding of vault Thickness:50mm Concrete mix:1:3:6
|
Excavation of tank vault commence Vault size:21.43 × 9.55 × 4.7
|
[b][/b]Evacuation of existing underground tank commence
|
Setting out of tank vault
|
Setting out of the tank vault commence Note:Tank vault is an underground storage compartment where tank for storage of oil produce is store |
The scope of the project basically is reconstruction of the filling station as we have an existing filling station there before which has dilapidated so we condemning all the structures we have on ground and reconstructing a new ones |
i will be runing thread on this platform for my fellow engineers and engineering student who would love to have an idea in construction of a filling station. |
Thanks i really appreciate,am in auchi now carrying out some research |
419 and fraudster should stay off as my own eye sef dey choke |
If you have a direct source of palmfruit around imo,rivers,anambra,enugu kindly signify,pls serious minded individual is needed,not here to play |