Some site updates from here. Decking Carpentry Works still ongoing. Back View of the building
|
We bought about 6 Planks already for this decking. About 140Pcs of 16mm, 480pcs of 12mm and 130 Pcs of 10mm and 5 Roles of binding Wire. Bamboo is about 1500 Per one and we have about 400 Pcs. Estimated granite for the work is 60T and 50 - 60T Sharp sand. Estimated number of Cement is about 260 - 290 Bags. To do decking is no joke. If you must do it well and get it right. This is the equivalent of what we are going to use here. If some are to remain, it will be a little here and there.
|
We have some site updates from the decking works.
|
More photo updates from site. Decking carpentry works is now going to be on full gear from today. Stay tuned.
|
Final leveling of the main building 90% Completed. Everything would be rounded up tomorrow morning. Meanwhile, decking is carpentry works have commenced from the back.
|
Beframia:Good question. Most importantly, using good amount of materials is the key and very important aspect of every stage of work. It is only when materials are under utilized that such cases can occur. Else, nothing of such will happen. I have been doing alot of projects with POP and haven't had any single issue. Even POPs that have Ceiling speakers on them. Secondly when a client or contractor for example, decides to DYI and end of managing materials. You get such results. Hence, adequate use of materials is key when it comes to building construction and finishes. When you underused materials. You end up spending twice correcting what ought to have been done well from the beginning. After all is the same amount of time it takes to do a bad work that is used also to do a good work. |
Some more picture updates from this site. The building has been powered...
|
Final leveling commenced already from the back of the building. We are now doing a Total of 14 coaches excluding the decking beam which will make it 15 coaches before the decking slab. This is our standard. And it gives us a very nice headroom for POP finishing when the time comes.
|
STINEKPROJECTS1:No sir. Not at all I maintain a minum of 600 - 1200mm for colum lapping at all projects as you can see the one the attached picture is still this same project.
|
More picture views from here. Some of the form works have been removed from the Colums and Beams. Block work will commence ASAP for the final de king leveling...
|
More picture updates from the works here. Mainly from the furniture aspect. 1st Picture - 6th Bedroom Wardrobe and dresser area. 2nd Picture - Kitchenette At the Pent House 3rd Picture - Family Lounge TV area 4th Picture - Same as Picture 3.
|
View from the top. Lintel (Beam), and Colum (Pillars) concrete works... Our concrete works are pure and very neat...
|
More external view of the building... 3 Units of 6 Bedroom Luxury Duplex.
|
We continue the lintel and colum concrete works today.
|
We have more views from this design. We shall be posting them soon. |
We walk the talk. We don't just say it. We do it. |
More views from the furniture Works we are doing here. A look at the Master's bedroom area. The walk in closet and the TV Console area.
|
Work progress from site today. We have commenced the lintel and colum concrete works today.
|
Our work speaks volume. We walk the talk. We don't just say it. We do it. |
Some site pictures from this location. We are doing Finishing Works which include the following: - Electrical Fittings - Furniture Works - POP Final finishing and wall screeding - Paint Works
|
We are already at the Lintel level now... We are doing our routine - 10 Coaches.
|
More site updates on this site is coming tomorrow. Stay tuned as we hope to show you how far we have come especially with the furniture Works. |
We have started the block forming and layout. We hope to achieve lintel in maximum of 4 days all road.
|
German floor is completed. Find attached pictures for your perusal. We are starting the block laying immediately.
|
engrwilliam5000:Good day. No sir. We have gone past that stage already |
Back View of the building. We have the swimming pool and sitout areas with water fountains.
|
Our works speaks for itself. Keep following up with us. |
Our works speaks for itself. Keep following up with us. |
Our works speaks for itself. Keep following up with us. |
Semi Detached - 4 Bedroom Duplex on 630sqm. Features: Ground Floor - Main Living Room - Dinning - Visitor's Toilet - Kitchen and Store - Guest Room ensuite First Floor - 2 Bedrooms ensuite - Family Lounge with Terrace - Master's Bedroom with Terrace. External Features - Security House - Gen House - Car Parks for 2 Cars. All Drawings are available for the Design - Architectural Design - Structural Design - Mechanical Design - Electrical Design - Plumbing Design DM Us for your Building designs and construction services.
|
Some more photo updates from This site. Furniture Works are ongoing. Site pictures to follow. Stay tuned.
|
We are now ramming and compacting the foundation now after watering has been done. Picture updates to follow today. Stay tuned. |