Properties › Re: The Total Cost Of Building The House You Want. by eazymanfia: 10:15am On Sep 05, 2018 |
spyder880: No, I don't take full payment. I collect money in 3 stages for a bungalow. This house will take about 3 months or slightly less for every work to be completed. Oh OK.... I will chat you up today on whatsapp. Thanks! |
Properties › Re: The Total Cost Of Building The House You Want. by eazymanfia: 9:29am On Sep 05, 2018 |
spyder880: We have updated the cost of the bungalows my people, thanks for your patience. Got It! Pls, how many months will it take to complete everything once full payment is made? |
Properties › Re: The Total Cost Of Building The House You Want. by eazymanfia: 7:52am On Sep 04, 2018 |
spyder880: Just a little while, my roofer is yet to get me a quote for that size of roof with stone coated tiles. I will call him again now. Alright thanks sir |
Properties › Re: The Total Cost Of Building The House You Want. by eazymanfia: 6:46am On Sep 04, 2018 |
spyder880: 3 bedroom bungalow I have been checking for update sir.... I want you to do something like this for me please so I'm waiting for the budget.
Thanks! |
Travel › Re: I Need Kuwait/Malaysia Visit/Tourist Visa Info by eazymanfia(op): 6:37am On Sep 04, 2018 |
9JAFULLBREED: For Malaysia your need to get the Socia Visa in ABUJA which is valid for 3months but you can only stay in Malaysia for 2weeks.
If You need more info about Malaysia you can respond below. Okay thanks! Please how best can I go about it? |
Sports › Re: Pierre-Emerick Aubameyang Rock Starboy Jersey. Thanks Wizkid For Sending It. Pic by eazymanfia: 8:17pm On Aug 29, 2018 |
grayht: This guy for PS4 dey give me heart attack lols |
Travel › Re: I Need Kuwait/Malaysia Visit/Tourist Visa Info by eazymanfia(op): 3:23pm On Aug 29, 2018 |
eazymanfia: People with experience should pls help. I want to visit Kuwait for 1 week or Malaysia so I want to know how best to get the tourist visa, the requirements and price.
Malaysia Tourist Visa Info!
Thanks! |
|
Travel › Re: I Need Kuwait/Malaysia Visit/Tourist Visa Info by eazymanfia(op): 11:22am On Aug 29, 2018 |
|
Travel › Re: I Need Kuwait/Malaysia Visit/Tourist Visa Info by eazymanfia(op): 11:02am On Aug 29, 2018 |
eazymanfia: People with experience should pls help. I want to visit Kuwait for 1 week so I want to know how best to get the tourist visa, the requirements and price.
Thanks! |
Travel › I Need Kuwait/Malaysia Visit/Tourist Visa Info by eazymanfia(op): 8:31am On Aug 29, 2018*. Modified: 3:22pm On Aug 29, 2018 |
People with experience should pls help. I want to visit Kuwait for 1 week or Malaysia so I want to know how best to get the tourist visa, the requirements and price.
Malaysia Tourist Visa Info!
Thanks! |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 8:45pm On Aug 25, 2018 |
Bimpsyyyyy: Oga budget about 2 to 3 m, u can call or whatsapp me for your construction on 09069193297 To lintel level right? |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 4:39pm On Aug 25, 2018 |
ramafama: That is definitely possible. Mine would have been cheaper if I planned to build the size I eventually built. I reconsidered at foundation stage and reduced the footprint of the house. I would like to see some pictures of ur building and connect on whatsapp if possible sir |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 3:43pm On Aug 25, 2018 |
ramafama: It may be. Lagos and maybe SW? material prices are a cheaper. But labour is cheaper here. No omo-omile as I built in an estate.  Ekiti is pretty cheap and labour too. So, I think 2.5 to 3m should roof it here. |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 2:00pm On Aug 25, 2018 |
ramafama: 3.68m completed everything from plans and drawings to lintel level blockwork. Then it got expensive! Seems things are expensive there. |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 1:39pm On Aug 25, 2018 |
ramafama: At least 12m. I am building a similar structure in Delta. I have installed casement windows (with buglary and net) and iron doors and plastered through out. I did longspan roofing 0.45mm. I have spent around 9m so far. I need to complete flooring, ceilings, electrical and plumbing fittings and painting. So I have about 3m more to find. All the best. wow!!! congrats man! sorry, how much did you spend on building alone? no roofing etc |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 1:18pm On Aug 25, 2018 |
raymondFirstborn: budget N6-7m.
Depends on the finishing. Thanks Sir! Pls I mean, just the building and roofing....NO windows, doors, ceiling etc. just building and roofing |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 1:03pm On Aug 25, 2018 |
raymondFirstborn: you can contact me I am a quantity surveyor (QS) you need a properly dimensioned drawing as a basis for estimating or budgeting.
I can help you with the estimate and costing. contact me on 09056082348(call & what's app) I will message you but I just got this plan online today so I just want to have a rough budget to know if I can choose another plan. A budget is all I need for now. |
Properties › Re: How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 12:09pm On Aug 25, 2018 |
topsy23: It depends on your finishing taste.. you can budget between 6-8m. But QS can help you out Thanks bro..... all I need is how much I can budget. so this help but kinda much! |
Properties › How Much Will Complete This Building In Ado Ekiti? by eazymanfia(op): 11:40am On Aug 25, 2018 |
Pls house, how much can complete this in Ado Ekiti? Got land already and saw this plan online and really like it. I want to start second week of September.
Please kindly help!!! Thanks all.....
|