Half season gone, remaining half shall b better. Check my signature n register |
Half season gone, remaining half shall b better. Check my signature n register |
Here it is equally 5k, 3k for mason n 2k for masons labour. Akwa ibom soonest: |
Pic here for guidance, d circled points are d columns. Dimension of d base for d columns is 800mmby800mm. 7bags of cemnt was used to cast d base alone
|
Would you also recommend d same for a 16mm iron reenforcement n dimension of 2500mm by 3000mm just above d kitchen? rotecch77: |
Casting of columns done
|
That is quite fast. Did you notice reduction in block usage btw dpc n lintel? |
I had answered this before. 1f6" dept. D ground was hard. 150 naira per meter jedisco: |
Not at all, it is just that down here engineers use 5" blocks for bungalows n 6" or 9 for high rise buidings. I decided to use 6" for external because i will b using casement wit buglar embedded wic will flush well in 6" than 5". I intend to av overhead tank above where d kitchen is. [quote author=mickykhe post=87749379][/quote]
|
That would depend on if u already have some materials like blocks, sand, granite, n cements like i had. I only had to pay for labour n used seven bags to mould additional 6" blocks. Here is d tips i used: 1. I got materials on ground, blocks, sand, granite n cement. I only paid for labour n water ricki: |
My brothers pig born yesterday but she refuse to feed them colostrum n even bites them. Wat can we do to calm her and make her accepts her piglets (3) |
My brothers pig kindles or put to bed 3piglets yesterday bt she refuse to feed them n even bites them. What can we do to calm her n make her accept her kits n feed them colostrum |
Marking n set out: N10000 Digging(N150 per meter) Foundation 1. 12bags at 2500 per bag 2. Skilld n unskilled labour + water= N23000 3. Form work+casting of basket for overhead tanks=N23000 Cements used11bags 4.block to dpc, 200 blocks per 3mason+labour=N30000+supervision(3000). Note: N50 per block here. N30 for masonn N20 for labour. Minimum of hundred blocks for a mason Granite n sand has to b provided 36bags of cement for block moulding, 3 trips of sand@15000, labour N500 per bag for moulding+ water[ quote author=azimo post=87651592]please update me with the cost I need something like this in aba. Can we chat on WhatsApp?[/quote] |
Leveling of blocks, remaining frontage
|
No prob sir, credits to boss like saydfact, seczy, rotect, et al I have been following them to learn jiday4: |
6" blocks, i used 6" for external walls n wher i will place d overhead tank. 5" for internal partitions. After dpc level, i will use hollow 6" n normal solid 5" for internal partitions I hop i av answered ur question well penitential: |
Gradually taking shape. I will update wit d cost breakdown |
Second part of the game going on, get along on my signature |
Second part of the game going on, get along on my signature |
Second part of the game going on, get along on my signature |
Tanx boss for your reply, i understand that of the slab n i must ensure it. But how do i make them damp proof walls? Hargbo: |
Space is the constraint here, 2000litre tank is to be placed there for domestic use. What should be the dimensions of the coulumns? Dimension of basket formed n casted= 80cm x 80cm Coulumn re-enforcement= 16mm rods formed to flush with 6" blocks used. Please masters, is there anything i should be worried about? EgunMogaji2: |
Form work done, block work to dpc to b done tomorrow
|
The circled point is where the beams would be stand. 80cm by 80cm basket is used n 16mm rods are used for the beams
|
Please i need some assistance concerning over head tank stand embedded in a 3bedroom bungalow flat. What should be the dimension of d pillars/beam? 6" blocks is used as block work |
Plan using an online app to create n my architect's plan
|
Casting done n dusted. Form work to commence. It is a diy project n i am really learning. I have a few observations which i will like every1 to contribute. I cudnt take much pic as i had low ba3
|
1F6", dats wat d engineer recomended wit 5coaches to dpc bt i will do 4coaches. 5 will be too high |
Casting of foundation to be done today, i pray for clement weather |
Total area dug is 101m
|
Plz wat is d estimated cost of this window of dimension 1200mm by 1200mm? |
Updates coming up soon, set out/marking carried out n Excavation done |