Sports › Re: Great Football Managers, New Season by jp130(op): 7:39pm On Apr 24, 2020
Season about to come to an end, good luck to managers that will be promoted to upper league. Don't lose match o
Properties › Re: The Making Of The "Enugu Block Of 12 Flats Of 1 Bedroom Apartments" by jp130(m): 7:36pm On Apr 24, 2020
Those points are considerate. Godwin
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 9:38am On Apr 18, 2020
Gud morni sir,
On numb 2, some one suggested additional two. How do u see it?
I will b using 6" blocks(solid)
Please i will need that cost of labours, mason, n iron bender n i dnt know if carpenter is necessary because most masons do the wood work.
Thanks a million for this detailed breakdown. I am gonna be well informed now.



QSFemi:
Good evening.

The dimensions of the Septic tank / soak away is given as Length = 3.00m, breadth = 1.80m and depth = 3.90m (13feet) according to you. Although I seriously doubt the feasibility of your depth, I'll do justice to it nonetheless.

Estimate of materials for proposed works;
1) Excavation 21m3 @ 1000/m3 = 21,000.00
2) Columns, 4nr, size 225mm x 225mm x 3900mm depth.
- cement 6 bags
_ 12mm reinforcement 6 length
_ 10mm reinforcement 5 length
3) 225mm blockwall = 380 blocks (same quantity even if you're using 150mm block)
_ cement 4 bags
4) reinforced concrete cover and oversite concrete to the base
_ Cement 10 bags
_ 12mm Dia. Reinforcement 7 lengths
5) 25mm x 300mm x 3600mm softwood as for work 5 lengths
_ 50mm x 50mm x 3600mm bracing 4 length
6) Plastering
_ Cement 6 bags
7) Make a reasonable supply of sand.

That's the quantity of materials needed for he job based on your dimensions.

If you need cost of labour, mention me in your reply.

This is the sound advice of a professional Quantity Surveyor.

Call me for your quantity surveying services.
09012800750
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 9:30am On Apr 18, 2020
Uyo.



dannie007:
Where is the Location I mean state!! I will advice you introduce 2 more columns




[q1uote author=jp130 post=88543139]Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 2:30pm On Apr 17, 2020
Quantity of blocks, rods to use, labour for iron bender, bags of cement. Labour for masonry. Here they charge N50 per block. I have granite at site n i go supply water.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 2:18pm On Apr 17, 2020
Gud efternoon experts, plz cn any experienced expert help me with quotation to construct this septic tank/soakaway. 3m by 1.8m. Dept is 13ft. The ground is solid bt i intend to use 4 columns at the corners. Plz any corrections would be welcomed

Business › Re: Football (+/Other Sports) Betting Season 14 by jp130(m): 3:52pm On Apr 15, 2020
Click my signature and manage a football team to success. My whatsapp is there too. I cn guide u
Sports › Re: Great Football Managers, New Season by jp130(op): 3:43pm On Apr 15, 2020
Just click my signature n it will open to d site. There u cn read all u need. I dnt want nairaland bot to banned me o


omohdesmond:
Please what the name of this football manager game
Video Games And Gadgets For Sale › Re: Online Football Managers by jp130(op): 9:06am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Business › Re: Football (+/Other Sports) Betting Season 14 by jp130(m): 9:05am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Phones › Re: PSP Forum(PSP Emulator For Android/iPhone) by jp130(m): 9:04am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Phones › Re: Tecno N3 Discussion Thread by jp130(m): 9:04am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Business › Re: How To Make Millions In 2020 by jp130(m): 9:03am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Phones › Re: FIFA 14 For Android... by jp130(m): 9:02am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Sports › Re: Great Football Managers, New Season by jp130(op): 9:01am On Apr 15, 2020
Half season gone, remaining half shall b better. Check my signature n register
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 6:28pm On Apr 14, 2020
Here it is equally 5k, 3k for mason n 2k for masons labour. Akwa ibom


soonest:
Benin is 6k. 5k was before o
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 6:14pm On Apr 05, 2020
Pic here for guidance, d circled points are d columns. Dimension of d base for d columns is 800mmby800mm. 7bags of cemnt was used to cast d base alone

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by jp130(m): 6:09pm On Apr 05, 2020
Would you also recommend d same for a 16mm iron reenforcement n dimension of 2500mm by 3000mm just above d kitchen?





rotecch77:
1500 or 2000ltrs of geepee or storex tanks is suitable for the place,
After mounted the tank finished make sure you tight the tank with marine rope of 10 or 12mm so that the wind will not blow it away
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 5:51am On Apr 04, 2020
Casting of columns done

Properties › Re: Construction Of A 3-Bedroom Bungalow In PortHarcourt by jp130(m): 5:48am On Apr 04, 2020
That is quite fast. Did you notice reduction in block usage btw dpc n lintel?
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 6:01pm On Mar 27, 2020
I had answered this before. 1f6" dept. D ground was hard.
150 naira per meter

jedisco:
@op kudos on progress so far.

Just to clarify, the digging of 150 per meter is to what depth?
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 10:08pm On Mar 25, 2020
Not at all, it is just that down here engineers use 5" blocks for bungalows n 6" or 9 for high rise buidings.
I decided to use 6" for external because i will b using casement wit buglar embedded wic will flush well in 6" than 5". I intend to av overhead tank above where d kitchen is.


[quote author=mickykhe post=87749379][/quote]

Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 10:03pm On Mar 25, 2020
That would depend on if u already have some materials like blocks, sand, granite, n cements like i had. I only had to pay for labour n used seven bags to mould additional 6" blocks.

Here is d tips i used:
1. I got materials on ground, blocks, sand, granite n cement. I only paid for labour n water



ricki:
So let say everything was around 100k for the foundation to date?? Correct?
Agriculture › Re: Pig Farmers Lets Meet Here by jp130(m): 5:08am On Mar 24, 2020
My brothers pig born yesterday but she refuse to feed them colostrum n even bites them. Wat can we do to calm her and make her accepts her piglets (3)
Agriculture › Re: Perfect Breeds Of Pig To Start Your Farm by jp130(m): 5:01am On Mar 24, 2020
My brothers pig kindles or put to bed 3piglets yesterday bt she refuse to feed them n even bites them. What can we do to calm her n make her accept her kits n feed them colostrum
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 8:27pm On Mar 23, 2020
Marking n set out: N10000
Digging(N150 per meter)
Foundation
1. 12bags at 2500 per bag
2. Skilld n unskilled labour + water= N23000
3. Form work+casting of basket for overhead tanks=N23000
Cements used11bags
4.block to dpc, 200 blocks per 3mason+labour=N30000+supervision(3000).


Note: N50 per block here. N30 for masonn N20 for labour.
Minimum of hundred blocks for a mason
Granite n sand has to b provided

36bags of cement for block moulding, 3 trips of sand@15000, labour N500 per bag for moulding+ water[


quote author=azimo post=87651592]please update me with the cost I need something like this in aba. Can we chat on WhatsApp?[/quote]
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 7:50am On Mar 21, 2020
Leveling of blocks, remaining frontage

Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 5:31pm On Mar 20, 2020
No prob sir, credits to boss like saydfact, seczy, rotect, et al

I have been following them to learn



jiday4:
Pls do following with kneen interest so you can guild me too as I want to embark on the same journey
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 5:29pm On Mar 20, 2020
6" blocks, i used 6" for external walls n wher i will place d overhead tank.
5" for internal partitions.
After dpc level, i will use hollow 6" n normal solid 5" for internal partitions

I hop i av answered ur question well


penitential:
This is not a hollow block. What type of block is this ?
Properties › Re: Construction Of A Three Bedroom Flat In Uyo by jp130(op): 7:34pm On Mar 18, 2020
Gradually taking shape. I will update wit d cost breakdown
Business › Re: Football (+/Other Sports) Betting Season 14 by jp130(m): 5:11am On Mar 18, 2020
Second part of the game going on, get along on my signature