Soakaway - complete. Used to refill the foundation, possible saved us a minimum 4 trips for laterite. Laterite filling is almost complete, having delays with the plumbing work. Added pictures from the backside, that's the best way I can identify this construction without confusion. Costing coming soon, the number of blocks used for the foundation is blowing my mind! Over 2300, how's that even possible? Anyway, I'll find out if this was inflated when we start raising blocks after oversite concrete. There are multiple step-ups like for the dining area and also the entry chilling area so not everything was 5 courses for DPC.
|
Traveled for work but I'm back and Project is still in progress. Damp proof course - complete 10x12ft Soakaway digging - In progress Laterite filling - In progress Initial plumbing - Planned Pictures: back, front and soakway.
|
You are sounding like you are referring to something different. ![]() Isn't it the regular long span roofing sheet molded into shape? Don't trust the durability, styrofoam might perform better. The house will be used periodically so it needs good protection from break-ins. This is where concrete parapet wins. My dream of a parapet is uninspiring, 90 deg, 2-step flat out. |
See below my plan for skirting or base boards; aluminum material. Available in Nigeria from jabi.sod Then I also add crown moulding. Got a picture from lowe.s
|
greenermodels:Instead of doing the aluminum or styrofoam parapet, I'll do the regular concrete one and cry once about the cost ![]() POP in the living and dining rooms are more likely to happen than the parapet. Not too expensive. Those fiber boards will not happen, too ugly with 2" plank running end to end to hold them in place. ![]() |
greenermodels:Plan is to use something like this below/concrete stamping. Can't deal with paving stones falling apart or grass growing in between them. Multiple cost cutting measures are planned (still unsure what to do) chief of them are parapet and ceiling pop - both beautiful but cost a lot. Still I believe in "buy once and cry once". Just do it.
|
Plan dimensions are approximately 13m x 18m if you remove the front chilling spot. Also take note of the irregular plan shape. Columns locations were placed this way: - every corner of the house - most wall distances greater than 2.5m but not exceeding either 6 or 7m.
|
1.3 Foundation Footing to DPC In other news, Construction is still ongoing. Block laying to DPC. My target was straight walls; seems it was achieved. ![]()
|
Also, I'll try my best to use good quality finishing. Wetin deh hungry me, I no sure say I fit afford am. ![]() Imagine marble floors, all baths and kitchen tiled top to bottom with high quality tiles, crown moulding and base boards on all walls, solar energy generation and huge battery banks... ![]() |
greenermodels:Thanks greenermodels, location is my hometown in Abia state. There is no estimate and no time-frame to build this, I'll keep funding till it gets completed but I just need to ensure any money spent goes where it's intended. In my head, N15m should take this project very very far. Nah, not overlooking anything. I have no fear, I just respect the fact that building a house is not a small endeavor but one can never finish what you don't start. Na so we take start this waka. Small small, it will be completed afterall if was an empty parcel of land this time last month. ![]() |
See the Cost for Blinding/Footing below. Cost not bad for the work done. Next will be setting 9" blocks from Footing to Damp Proof Course (DPC). 5 courses planned but it might end up being 4 courses.
|
Dug foundation depth was 600mm, blinding thickness was 150mm minimum, some places were about 200mm of mix. Reinforcement Bases and Columns are 23 in total. Read Say.dfact's thread; these dimensions/specs heavily affects costs.
|
Still on the foundation digging, see picture 1 , top soil is 'normal' and below 4inches is hard all the way. Footing or blinding was completed on Sunday. Costs coming in.
|
Attached pictures are clipped from videos I am sent that's why they are of poor quality. I have asked for strictly pictures, not videos. |
Note that there are no cost for onsite Engineer.. E get how we deh take run this construction. I am related to the Site Supervisor (a professional) so I go give am lump sum if him fit deliver this house without stories. Also, since it will be built as I earn, didn't wanna bring externals to come do work in bits. As it stands, I have nooo ideaaaa at what stage this project will be paused but the plan is to roof, install windows and doors then take a break to recover. E no easy. |
1.2.2 Setting Out and Excavation Straight forward process, part materials bought (sand, stones and reinforcement rods). More materials will be purchased and brought onsite gradually. I estimated 60x 12mm rods and 15x 8mm rods will be used for this stage (will be more if the reinforcement columns are made taller). Current target is to keep them just above the german floor. abdul.wastecx https://www.nairaland.com/2162299/cost-laying-bungalow-foundation did a very good explanation. Also check the threads from say.dfact. Excavation was 90k, higher than all the sums I have seen on NL.
|
1.2.1 Prep Work Involved buying items I was told are must-haves. I asked why I had to buy materials professionals would use for their work? Shovels, head pans and barrows - I buy am o. Tank used during block moulding fell and broke in two during that stage, it needed a replacement.
|
dfrost:Thank you dfrost. |
How much do they sell 6 & 9-inch blocks in your area? |
Total moulded blocks came out to be almost 5,700. Plan was for 9" all through at 25 pcs moulded per bag. Revised plan to build all interior walls with 6" blocks and all exterior walls with 9". Ceiling will be higher than the 'normal'. 9" = 3594 pieces (divided by number of cement bags gives about 26 pcs/bag) and 6" = 2094 pieces (divided by number of cement bags gives about 30 pcs/bag) Overall a smooth experience aside from needing cash to pay for labour cost and to buy trips of sand resulting in numerous stops when we couldn't get notes. Laborers finally supplied a bank account. I paid for a Bill of Material/Cost Estimate but also followed this thread for 'dummies' and fully understood the calculations for blocks. EngrO.Yemi https://www.nairaland.com/4491449/how-calculate-number-blocks-cements
|
1.1 Block Moulding Find below the Guide and Plan for block moulding (laptop keeps forcing the spelling to be American). Also attached is the approximate actual cost. To dig water for South East na N1.5m - no jokes. Will face this project later.
|
Stages to be accomplished in the near term: 1.1 Block molding - Done 1.2 Foundation to DPC - Ongoing 1.3 Soakaway and Filling 1.4 Oversite concrete 1.5 DPC to lintel 1.6 Lintel to roof 1.7 Roofing 1.8 Windows and doors (should I leave this for later?) Then I rest. Is there anything missing? All comments are welcome, I have lots of questions to ask! ![]() |
As it's widely known, the cost is dependent on what you want to build. Floor Plan was done in multiple iterations, it cost a whole lot as I kept asking for it to be redone until the interior layout was achieved. Cost could range from 50k to 500k (make una no vex, other costs will be more precise). ![]() We started in March 2022 and Completed the plan around January 2023. No rush, na small small we go design and build am. ![]()
|
This thread aims to document a construction project I'll be financing and most importantly attach the associated costs. Some mathematics will be involved as I pulled from various resources to arrive at approximate values for the construction stages. This will enable me properly monitor and track the progress in absentia. Big thanks to the following individuals in no particular order as their threads were very helpful: Start here for a guide on places to avoid cutting cost Olu4christ https://www.nairaland.com/3239567/cutting-costs-cutting-corners-lets#47760687 Asom.ArchitectNG https://www.nairaland.com/7537067/cost-estimate-building-4bedroom-bungalow https://www.nairaland.com/7356080/construction-3bedroom-bungalow-bq-oron/16 (Your Oron build too clean) say.dfact https://www.nairaland.com/3523256/how-build-comfortable-house-earning (If not for you, how we wan take build with our small change?) EngrO.Yemi https://www.nairaland.com/4491449/how-calculate-number-blocks-cements (E be like say you be lecturer for one school) abdul.wastecx https://www.nairaland.com/2162299/cost-laying-bungalow-foundation (Feb 23 post) https://www.nairaland.com/2417678/how-build-low-budget-bungalow (Your mathematics fit wound person) spyder.880 https://www.nairaland.com/2712462/making-low-budget-5-bedroom https://www.nairaland.com/6447386/making-7-bedrooms-high-ceiling (when I grow up, I go like build this kind house) erico.2k2 - if you can do it, I can do it too. https://www.nairaland.com/2804484/diy-construction-house-ph (I'll build gradually like you did) and lastly huuuge Thanks also to the multiple contributors on this massive thread https://www.nairaland.com/2550211/general-topic-thread-to-discuss-anything (una too much, I learned a lot!) Let's go! |
MackyNaija:5years ago I landed in the greatest country in the world and it has been a successful journey. I felt I would make so much noise today but realizing the naira to dollar rate rose/fell from #625 less than a week ago to #700 today has left a bitter taste in my mouth... Gives me the feeling of someone grieving a loss. It was a great run while this thread lasted.. Thanks to all of my followers and wellwishers. The thread served its purpose and I personally know a few people that it helped get to the US. This is officially my last post and I'd say to those in the future reading this... If I could do it, you can do it too! Once again, God Bless America!!! Peace Out! ![]()
|
Gboy1026:Gboy, the most updated & correct answers can be found on the frequently asked questions section on their website. |
Lilmessis:Current apartment and the new home that's coming soon. |
imran90:Smooth road with underground drainage. From the historical behavior of Nigerian politcians, even Adeleke no fit give una this one. ![]() |
Happy Sunday my people... Some pictures of where I am and where I would like to be in 30days time. ![]()
|
MackyNaija:At this point, it didn't feel like I was going anywhere. I had NOT mentally checked out as I had resigned technically a few days prior and was just getting my brain aligned with the travel plans. MackyNaija:Having been denied a US visa previously, you won't blame me for not taking things seriously. Until my legs touched yankee, I was tuned to keep seeing this as a mere possibility... ![]() Might or might not happen. |
FrankNetter:Welcome Sir, read your thread all the way until you went awol.. ![]() As I see your Camry, I tell myself say when I grow up I go like buy another one for myself. ![]() Hope you are doing good. |
MackyNaija:Today no quiet o, work wan kill person. ![]() Been covering the tasks for someone who did an internal transfer. Company is on hiring freeze so a replacement is not coming soon. Laying peacefully in bed, body needs a lot of rest. |




Will face this project later.