Properties › Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Okeseni(m): 12:36pm On Jul 24, 2020
abdulwastecx:
More from the foundation block work
As I can see from the angle of courses of block laid which just two, the total number of block used to achieving this level should be 432 numbers of block
Properties › Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Okeseni(m): 12:32pm On Jul 24, 2020
johnson232:
very neat job as usual my able engr.

my questions;
is it 196m or 96m?
how many bags of cement, tons of sand and gravel did u use for the footing?
thanks.
According to the info provided at prior as:
Girth=96m
Width of footing=675mm
Depth of footing=150mm
mix=1:3:6

Sum mix ratio:1+3+6=10
Dry Volume: 96×.675×.150=9.72m^3
Wet Volume: 9.72×1.25 (1+.25 for bulking and shrinkage)= 12.15m^3
1÷10×12.15×1440=1749.6kg
Since 1 bag of cement =50kg
Therefore, bags of cement to be used: 1749.6÷50=34.99bags
Pls Engr. Kindly make your corrections if needed.
Properties › Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Okeseni(m): 11:58am On Jul 24, 2020
abdulwastecx:
Due to the nature of the soil, it was very difficult to dig more than 450mm to around 500mm. The soil is stiff clay and the site is relatively higher than the road.

Casting of foundation
1. Total length of strip footing =96m
2. Width of footings =675mm
3. Depth of footings = 150mm
4. Mix ratio =1:3:6 (by mass)
If am correct as the info provided above, you must have used 27.99bags of cement (strictly predicted base on mixing proportion inscribed)
Properties › Re: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by Okeseni(m): 10:09pm On Jul 20, 2020
abdulwastecx:
Yea, when do you want us to talk?
Shall we on whatsapp?
Properties › Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Okeseni(m): 10:05pm On Jul 20, 2020
abdulwastecx:
It is a simple mathematics my oga. 25 percent of A is 0.25A, while and increase of 25% of A = A + 0.25A = 1.25A
Thank you Engineer
Properties › Re: Construction Of Five Bedroom Duplex With A Pent House At Guzape(fct Abuja) by Okeseni(m): 9:54pm On Jul 20, 2020
Please I want to work under you as a junior colleague sir, I shall be glad if this request is giving special attention. My zeal for construction is gradually going down as the result of job placement inadequacy, as the matter of fact, would like to be with to exhibit the rightly. Thanks ! My whatsapp Number: 08135001073
Properties › Re: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by Okeseni(m): 9:11am On Mar 17, 2020
podosci:
Contact us via mail or whatsapp for further discussion.
Engineer!
Can we talk in camera ?
Properties › Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Okeseni(m): 11:59am On Mar 09, 2017
Good day ! I had sent you a message over the analysis u did for a boungalow foundation at a particular aspect calculating for volume increasingly by considering 25% (as 1.25) all because of the shrinkage and wastage. here i want to ask, is 25% converting to 1.25?
Properties › Re: How We Build Duplexes In Nigeria by Okeseni(m): 11:44am On Mar 09, 2017
Good day ! have reached u through mail but i could not get it through, i have a question over one of article you composed ''Proper Analysis of design and cost of a foundation design for boungalow''
There i found shrinkage and wastage of 25% to increase the volume of concrete, which you later calculated as: 1.25 (25%) x (girth x width of the trench x thickness of the foundation footing).
Here, i want to know if 25% was 1.25 in conversion ?