Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,020 members, 7,825,207 topics. Date: Sunday, 12 May 2024 at 09:07 AM

The Making Of The "Akure 63 Units Shopping Plaza" - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Making Of The "Akure 63 Units Shopping Plaza" (15034 Views)

AMAC Demolishes A Shopping Plaza With People And Goods Inside (Video) / Surulere Super Shopping Plaza On Fire / The Making Of The "Akure 5 Bedroom Duplex" (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:30am On Mar 19, 2021
Its challenging working in these wet conditions, but we are meeting the challenges head on, excavation for column bases in progress..........

We use a water pump to remove the ground water before working on the bases.

3 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:35am On Mar 19, 2021
More bases..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:42am On Mar 19, 2021
Preliminary blinding cast of the column bases .........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:51am On Mar 19, 2021
Taking delivery of more materials, and putting them to good use immediately to conserve space.........

3 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:55am On Mar 19, 2021
Standing the foundation starter columns.............

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 6:00am On Mar 19, 2021
More work planned for this weekend as we continue works in the foundation trenches..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 9:51am On Mar 19, 2021
The people that will be making blocks for us sent me these samples for tests, but I will not be testing these, I will go to the block site to test the strength of the blocks there.

8 Likes 2 Shares

Re: The Making Of The "Akure 63 Units Shopping Plaza" by Martini101(m): 10:52am On Mar 19, 2021
spyder880:
The people that will be making blocks for us sent me these samples for tests, but I will not be testing these, I will go to the block site to test the strength of the blocks there.

Confirm 042 guy�

8 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:20pm On Mar 20, 2021
More work ongoing here.......

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 7:33am On Mar 27, 2021
For the front dry part of the land, we have started the foundation blocks proper.......

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 7:34am On Mar 27, 2021
And casting concrete columns ..............

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 7:49am On Mar 29, 2021
Work on the concrete section of the foundation in this shopping plaza construction..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 7:52am On Mar 29, 2021
More pictures........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by michlins(m): 8:51am On Mar 29, 2021
spyder880:
Work on the concrete section of the foundation in this shopping plaza construction..........
this foundation high oh. E go still chop laterite join

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by twinskenny(m): 8:58am On Mar 29, 2021
Well done oga mi i wish all the best.. welcome to southwest

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by kopell: 10:20am On Mar 29, 2021
michlins:
this foundation high oh. E go still chop laterite join
Waiting high? come Lekki and see high foundation that consumed 35 tucks of 30 tons of sharp sand. Those area no be joke at all.

3 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 10:29am On Mar 29, 2021
twinskenny:
Well done oga mi i wish all the best.. welcome to southwest

Thank you bro, I am enjoying this city very well, very cool and peaceful too.

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 8:45pm On Mar 31, 2021
More of our foundation columns are ready.........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 9:25pm On Mar 31, 2021
Bringing in more of the blocks we had paid for..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 6:56am On Apr 01, 2021
More columns..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 10:32pm On Apr 01, 2021
More sections of this foundation

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 10:40pm On Apr 01, 2021
In the back, the foundation will be very high.........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 10:49pm On Apr 01, 2021
Some sections of the back has about 5 boards........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 11:02pm On Apr 01, 2021
More

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 10:09pm On Apr 02, 2021
Sand filling of the foundation continued today..........

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by Pius4me: 1:01am On Apr 03, 2021
spyder880:
Some sections of the back has about 5 boards........
Great job my brother, But from the eyes of a non Professional in your trade i'm just concerned. Will this massive pit at the back of the Structure and the water log area not compromise the foundation of your structure? I stand to be corrected. keep up the good work.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 6:13am On Apr 03, 2021
Pius4me:
Great job my brother, But from the eyes of a non Professional in your trade i'm just concerned. Will this massive pit at the back of the Structure and the water log area not compromise the foundation of your structure? I stand to be corrected. keep up the good work.

Welcome Sir, the pit was excavated on my instructions. I wanted to use it to monitor the water level in the land from the time we started construction. There is also a water well in the front I was using as a water level observatory.
Due to my observation of the pit, we did a raft foundation at the back because of the nature of the land, and will use good beams to complete the top of the foundation.
The pit we dug might become the soakaway system in the near future. Thanks.

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by whirlwind7(m): 7:22am On Apr 03, 2021
spyder880:


Welcome Sir, the pit was excavated on my instructions. I wanted to use it to monitor the water level in the land from the time we started construction. There is also a water well in the front I was using as a water level observatory.
Due to my observation of the pit, we did a raft foundation at the back because of the nature of the land, and will use good beams to complete the top of the foundation.
The pit we dug might become the soakaway system in the near future. Thanks.

The green color of the water in that pit shows it is fertile.
Do this: buy some catfish fingerlings (say, about 20) and put them there. No need to bother about feeding them

Unless the pit gets flooded in the coming rains, you'd have grown fish in the next few months grin grin

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 7:26am On Apr 03, 2021
whirlwind7:


The green color of the water in that pit shows it is fertile.
Do this: buy some catfish fingerlings (say, about 20) and put them there. No need to bother about feeding them

Unless the pit gets flooded in the coming rains, you'd have grown fish in the next few months grin grin

Very true, that's what came to my mind as I was standing there, only that I dont know how flooded the area usually is if it rains more. cheesy

Nigeria is really blessed, there is food in abundance in every part of the country yet our leaders cannot harness the wealth by providing enabling environments for business to thrive.

1 Like

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 9:05pm On Apr 14, 2021
After completion of the filling, we have done our compaction, and now preparing the ground beams..........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:00am On Apr 15, 2021
Ground beams reinforcement works.........

2 Likes

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(m): 5:11am On Apr 15, 2021
Carpentry...........

2 Likes

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

Developing A Two-storey Building (6nos 2-bedroom Flats) in Portharcourt / Building Plan- Architectural & Structural Drawings Services / Various Miniflat, 2/3 Bedroom Flat & Duplex For Urgent Letting In Surulere Etc

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.