₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,478 members, 8,512,106 topics. Date: Monday, 02 November 2026 at 08:34 PM

Toggle theme

Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 - Properties (3) - Nairaland

Nairaland Forum › Nairaland General › Properties › Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 (18039 Views)

1 2 3 4 5 6 7 8 9 10 ... 12 Reply (Go Down)

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 2:51am On Apr 12, 2021
rotecch77:
More idea/ comments needed on this furniture setup
If you have any better idea on this pls kindly shear such with us here
I dont like the idea of those pallete planks on the wall.
Something better could be done. Thx.

Hajji M.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:23am On Apr 12, 2021
mufutau55:
I dont like the idea of those pallete planks on the wall.
Something better could be done. Thx.

Hajji M.
Well said sir, I forgot to tag those pics as internet pics, those area with pallet will not be incorporated in our own design sir.

More observation and idea needed

I really appreciate your time here sir
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 3:02pm On Apr 12, 2021
Foundation of the second building also done.

Next line of action will be Earth filling follow by over-site concrete ( German floor)

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:41pm On Apr 12, 2021
Live update pics

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by KolaShangOne(m): 9:19pm On Apr 12, 2021
mufutau55:
Poor Kolashangone... that Engineer probably has five kids by now. I mentioned it to him few days back. smiley

Hajji M.
2 actually grin
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:40am On Apr 13, 2021
Earth filling with rubbles and red sand we got from the demolition of the old structure is about to start
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:59pm On Apr 13, 2021
Update loading
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 12:00pm On Apr 14, 2021
Coming soon
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 3:54pm On Apr 15, 2021
Earth filling with the demolished rubbles is in progress

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:04am On Apr 16, 2021
Filling still in progress
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:46am On Apr 20, 2021
We are compacting the filling soon
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:23pm On Apr 20, 2021
More pics coming soon
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:55pm On Apr 21, 2021
Preparation for over site concrete and some earth filling in progress


2 weeks gone

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:01pm On Apr 22, 2021
We are committed to our work.

No Child play here oo

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:13am On Apr 23, 2021
Watch out for more update here
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:53pm On Apr 23, 2021
Loading...
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by ArcToyin(m): 10:40pm On Apr 23, 2021
Thumb up sir. Am seeing a good building up there, the block layers are superb too.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:18am On Apr 24, 2021
ArcToyin:
Thumb up sir. Am seeing a good building up there, the block layers are superb too.
Thanks chief,
I really appreciate your time here.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:24pm On Apr 25, 2021
Site update

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:51am On Apr 27, 2021
After earth filling, it’s compaction process which is going on with mechanical compactor machine right now.

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 3:57pm On Apr 27, 2021
More pics

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:14pm On Apr 29, 2021
Over-site concrete live in progress.

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:21pm On Apr 29, 2021
More

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 4:28pm On Apr 29, 2021
good one.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:11pm On Apr 29, 2021
folmus:
good one.
Thanks bro
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:48pm On Apr 29, 2021
150 bags of cement used here

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by obyrich(m): 5:18am On Apr 30, 2021
rotecch77:
150 bags of cement used here
For the German floor?
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:50am On Apr 30, 2021
obyrich:
For the German floor?
Yes, for the German floor of the 2 building
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by obyrich(m): 7:13am On Apr 30, 2021
rotecch77:
Yes, for the German floor of the 2 building
ok
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 12:06pm On Apr 30, 2021
Watch out for more
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:21am On May 02, 2021
Day3 of the casted slab ( German floor )

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by topsy23(m): 10:42am On May 02, 2021
Weldone boss.

Taking shape
1 2 3 4 5 6 7 8 9 10 ... 12 Reply

Construction Of Mini Bakery/ Office Space By Rotech77 • Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 • The Finishing Of Osun State Edifice By Rotech77 • 2 • 3 • 4

5.Nos of R/palour selfcon at linted stagefor sale at N4.9million and negotiable. • Aluminium Composite Panel At Wholesale Price.(pictures) • Breaking News: Three-storey Building Collapses In Rivers State (photos)