Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,981 members, 7,817,889 topics. Date: Saturday, 04 May 2024 at 10:07 PM

FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road (10254 Views)

Dapo Abiodun Releases ₦2 Billion To Offset Deductions From Ogun Workers / FG Releases ₦7 Billion For Completion Of East-West Road / FG Releases ₦20 Billion For The East-West Road Project (2) (3) (4)

(1) (2) (Reply) (Go Down)

FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Liposure: 1:16am On Jul 30, 2021
The Federal Government has released the sum of N2.5 billion for compensation to pave ways for remedial works to be carried out on the deplorable Eleme-One Section of the East West road.

The Minister of Niger Delta Affairs, Senator Godswill Akpabio, who made this known after a meeting with the management of RCC, the construction firm handling the projects directed the firm to start work by Friday.

He, therefore, appealed to protesting Niger Delta youths to vacate section 3 of the East-West road to enable contractors commence work.

According to him, “The essence of this protest is to draw the attention of the government to the road, now we are here allow us to commence work.”

Akpabio acknowledged that the youths were right to stage a protest over the delay.

The Minister who disclosed that the federal government has released additional N2.5 billion for payment of compensation to property owners along the road corridor regretted that the initial N4.5 billion budgeted for compensation could not meet up with demands.

He disclosed that the Niger Delta Development Commission (NDDC) has also budgeted another N35 billion to support the project, adding that the ministry has channeled funds met for over 304 projects into the East-West road project.

He further disclosed that the Ministry has proposed an extra-budgetary intervention for inclusion of the East-West Road Sections I-IV in the 2020 SUKUK Issuance Programme of the Ministry of Finance, Budget and National Planning and the Debt Management Office.

This according to him is part of the efforts made by the Ministry to access adequate funding for the completion of the East-West road project.

The Minister explained that the initial contracts for dualization of the 338km road linking Warri to Oron through Kaima, Ahoada, Port Harcourt, Ogoni and Eket Townships (Section I-IV) was initially awarded in four sections to four different contractors in 2006.

“It is well known that Section I (Warri-Kaima covering Ch. 0+000-Ch. 87+400 and Section III) and Section III (Onne Port Junction – Eket covering Ch. 15 + 000 – Ch. 99 + 000) have been duly completed by Messrs Setraco Nigeria Limited and Messrs. RCC Nigeria Limited respectively” he added.

He maintained that the section IIIA (Port Harcourt Onne Road Junction, covering Ch. 0 + 000 – Ch. 15 + 000 was not part of the contract initially awarded in 2006 because it was in good condition having been dualized earlier, noting that “over time, the Port Harcourt – Onne Port Junction portion had progressively deteriorated as a result of heavy axle loading, flooding and is no longer serviceable for the current traffic volumes.

”Therefore, the Ministry had to award the contract for additional works to Messrs RCC Nigeria Limited to upgrade the Port Harcourt Onne Port Junction”.

He further stated that due to poor annual budgetary provisions, the contract for upgrading of Section IIIA awarded in 2014 could not commence until the Ministry paid the contractors the full mobilization Advance in 2020.

“The condition of the road deteriorated during the period of delay and there has been serious encroachment on the right-of-way initially delineated for the road.

“With the review of the initial contract scope of works and contract unit rates imperative, specific measures for addressing the contingent site conditions militating against the progress of work were scheduled by the Ministry.

He said these include the initial design for interchange bridges at Onne Junction which is to be substituted with a flyover bridge, but due to space constraints caused by the newly constructed Power Sub-Station which cannot be relocated due to higher cost implication.

“A new flyover bridge has also been designed to replace the interchange bridge initially designed for Refinery Junction amongst others.”

The minister further reiterated the commitment of the present administration led by President Muhammadu Buhari to complete the East West highway dualisation project by 2022.

https://www.vanguardngr.com/2021/07/fg-releases-n2-5b-for-deplorable-eleme-one-section-of-east-west-road/

3 Likes 1 Share

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by chiiraq802(m): 1:55am On Jul 30, 2021
Nice one.

I hope Akpabio no go dagbaru that money cuz all Nigerian Politicians are thieves.

14 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by oluemmakay(m): 3:43am On Jul 30, 2021
Buhari is working...

10 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Hangmnk: 5:47am On Jul 30, 2021
Waste of money IPOB will destroy it...

2 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by MufasaLion: 5:48am On Jul 30, 2021
Loot half, disburse half.

8 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Monogamy: 5:50am On Jul 30, 2021
Nice one

Children of eight would soon find a means of linking GEJ to this now

2 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Ceenachi: 5:50am On Jul 30, 2021
Wen fake rulers ruled the people will not escape suffering
May God come quickly to deliver Us from the wrong hands

1 Like 1 Share

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Andyvilly: 5:57am On Jul 30, 2021
I don't know why we still celebrate road construction and completion as an achievement in Nigeria in the modern era?

8 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by kingsways: 6:01am On Jul 30, 2021
2.5 billion is not enough. A good chunk of Nigeria' s oil resources is located there including refinery and petrochemical plant is located there and the road is so bad, it has become a den for criminals

6 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by elmessiahs(m): 6:02am On Jul 30, 2021
Fixing that road is what I refer as social justice, you can't take and don't bring return. So I urge those incharge to ensure expediting action because that particular axis is so deplorable

1 Like

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by udoakwa(m): 6:02am On Jul 30, 2021
Akpabio has always been a good man, a talk and do Ette ubom nyin but he betrayed us by joining evil party... Abasi adu ye aye sha

3 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by JonCina(m): 6:03am On Jul 30, 2021
RCC should move to site or na still Bobo juice!

Road remains closed until Contractor is seen moving equipment and machinery to site!!

ENOUGH IS ENOUGH!!!

2 Likes 1 Share

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Mide3367: 6:04am On Jul 30, 2021
Andyvilly:
I don't know why we still celebrate road construction and completion as an achievement in Nigeria in the modern era?
embarassed.. Shocks me too
Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Ngasky(m): 6:09am On Jul 30, 2021
Good development.
But the report was poorly written. What is the length of the road and cost specifically?
The quoted 2.5 is it compensation or construction cost? The ministry was quoted as saying the funds is for 300+ projects. So what is the actual contract we are not interested in the other parts of the road that is not in this particular contract

1 Like

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by RosyIsBlessed: 6:09am On Jul 30, 2021
Thank you. That road nearly gave me hunch back the other day. They should start it ASAP

1 Like

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by chloedogie(m): 6:10am On Jul 30, 2021
Sad. I remember when I was still working in portharcourt way back then that road was so terrible and patience jonathan wanted to bury her mother in okrika, people attending will have to drive from the airport through that eleme road which trucks from onne port were falling inside. Wike was a minister back then and joined forces with few politicians and the raised some millions and awarded the renovation of that road to a contractor. In less than 5 days that road from oil mill to akpajo junction was finished. I drove on it smoothly and barely 4 days after the burial, just one single rain washed off that road. We didnt see any road again. Na that day I gave up on our politicians. It was a road that didnt last 10 days

10 Likes 1 Share

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by oshonky: 6:16am On Jul 30, 2021
Oya RCC move to site with immediate effect, we’ve not gone to onne port since Monday, no money on ground like this

1 Like

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Maxymilliano(m): 6:16am On Jul 30, 2021
So if there was no protest by residents of the affected communities, the government will not release money ?

3 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by kolakolex: 6:21am On Jul 30, 2021
Andyvilly:
I don't know why we still celebrate road construction and completion as an achievement in Nigeria in the modern era?

Its simply due to the fact that,people Have suffered a lot as a result of the neglect on that road,due to poor successive governance.

3 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Andyvilly: 6:26am On Jul 30, 2021
kolakolex:


Its simply due to the fact that,people Have suffered a lot as a result of the neglect on that road,due to poor successive governance.
And also due to the fact that in saner climes, projects like these are done by house of reps, senators, councillors, chairman and private organizations, not even the governor.
Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Csami(m): 6:28am On Jul 30, 2021
Id!ots! So if there had been no protest they won't have released cash for the road.

Morons we call leaders

Maybe anytime we want to get something done in this country we should come and block major roads.
Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by ruggedtimi(m): 6:31am On Jul 30, 2021
Chai and yet na still nonsense road Dem go work...east west road don turn party ground for eleme youths. So if boys no come out like that federal govt for no do anything

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by vedaxcool(m): 6:35am On Jul 30, 2021
I thought protest against government is banned in Nigeria? Every day the losers get exposed.

2 Likes

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Savagecontents: 6:39am On Jul 30, 2021
Unrealistic projects
Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by bros856: 6:46am On Jul 30, 2021
I knew before now that Senator Godswill Akpabio is the only man that will deliver East West road end to end without mixing words. When it comes to construction work he doesn’t compromise quality and completion. I know that road will be his master piece e. He talks and do unlike other politicians.

1 Like

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Nobody: 6:49am On Jul 30, 2021
Liposure:


He, therefore, appealed to protesting Niger Delta youths to vacate section 3 of the East-West road to enable contractors commence work.

According to him, “The essence of this protest is to draw the attention of the government to the road, now we are here allow us to commence work.”

Akpabio acknowledged that the youths were right to stage a protest over the delay“

It seems without protest government won't be proactive on their responsibilities. I guess we should mobilise our people and protest as well along Calabar/Itu/Odukpani highway, if possible we block the road entirely to draw their attention. What is wrong with our elected leaders?

3 Likes 3 Shares

Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by asiga(m): 6:52am On Jul 30, 2021
The enough is enough protest will not only continue on that road but will last until we confirm the seriousness of the contractors handling that section of the road.
Re: FG Releases ₦2.5 Billion For Deplorable Eleme-One Section Of East West Road by Nobody: 6:54am On Jul 30, 2021
vedaxcool:
I thought protest against government is banned in Nigeria? Every day the losers get exposed.
Federal government cannot play politics with the protest of Niger Delta youths. Like one of my contemporaries would say, "e get why" grin grin

(1) (2) (Reply)

President Bola Tinubu Signs National Students Loan Amendment Bill Into Law. / Niger Delta Youths Task Buhari On Infrastructure, Sustaining Amnesty / Advantages Of Being A Nigerian

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.