| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 12:03am On Jul 31, 2021 |
We began the casting already
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 2:39pm On Jul 31, 2021 |
We still here...
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 1:07am On Aug 01, 2021 |
Good morning Viewers. We finally used 270 Bags of Cement for the ground beam. 80 Tons granite and 90 Tons Sand to complete this phase. Formwork removal ongoing simultaneously too
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by mufutau55(m): 1:27am On Aug 01, 2021*. Modified: 2:08am On Aug 01, 2021 |
Dennis3D:Wow! Congratulations, this is a very big job. This is the second time I saw you doing this, you do it just like nothing. Good work. Keep it up. Now to see how many tonnes of sand to fill the foundation now. I know it's gonna be lots of sand. How high is this foundation. Hajji M. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by FreeMejoor1(m): 1:53am On Aug 01, 2021 |
What is the cost of this project if I may ask |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 4:55pm On Aug 01, 2021*. Modified: 6:21am On Aug 06, 2021 |
mufutau55:The foundation is 1250mm height, when we add foundation slab after filling and compacting. It will be be 1400mm total height of foundation. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by mufutau55(m): 5:07pm On Aug 01, 2021 |
Dennis3D:Wow! Keep up the good work Sir. Hajji M. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 6:04pm On Aug 01, 2021 |
mufutau55:Thank you sir for your follow up always |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 6:05pm On Aug 01, 2021 |
Hello people. Find attached below a cross section of the 3D model of the project under review...
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 9:45am On Aug 02, 2021 |
We are still working on the model of this structure... It's gonna be an amazing and exciting work when we are done.
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 11:46am On Aug 02, 2021 |
Because Sunday works are not allowed here, we had to wait till Monday to take off the formworks..
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 3:51pm On Aug 04, 2021 |
Sand filling ongoing |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 8:00am On Aug 05, 2021 |
Pictorial update
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 11:12pm On Aug 05, 2021 |
Working on the 3D model Design. Find attached pictures... We doing a special exterior and interior 3D model of this project because it's a developer Design...
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 6:23am On Aug 06, 2021 |
Filling continues
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 2:33pm On Aug 06, 2021 |
The filling has been ongoing for 4 days now despite the challenges, we would be rounding up soon. 19 trips of Chinese trucks so far have been dropped here from our estimated 24 Trips
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:45pm On Aug 06, 2021 |
Work update continues tomorrow |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 4:49pm On Aug 07, 2021 |
Exterior 3D model is ready now.
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Mykel51(m): 1:31pm On Aug 08, 2021 |
Dennis3D:Wow...this is a big job. Well-done. You used more sand than granite. What mix ratio was used sir ? |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by RobbStark(m): 1:49pm On Aug 08, 2021 |
Nice one from you guys @ Dennis3D. Indeed you don't build houses but homes. Ride on |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:20pm On Aug 08, 2021*. Modified: 7:20pm On Aug 09, 2021 |
Mykel51:This is an engineering question... However, we follow the structural design details. The sand used here is not entirely exhausted. I only wrote the material procured for the phase of work we did. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:21pm On Aug 08, 2021 |
RobbStark:Thank you sir. We have equally come up with an animation of this project as proposed. Would be sharing it soon. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:35pm On Aug 08, 2021 |
Kindly watch the project trailer here Click the link and watch it life. Tell us what you think. https://www.youtube.com/watch?v=clGdBNwPY7w |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 11:40am On Aug 09, 2021 |
Currently wetting the foundation in preparation for ramming/compacting
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:19pm On Aug 09, 2021 |
Compacting starts tomorrow morning as planned... We will update the thread accordingly. Thanks for following up with us here. |
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:00pm On Aug 11, 2021 |
Ramming and compacting completed. Membrane application.
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 5:45pm On Aug 12, 2021 |
Finishing touches In preparation for oversite concrete works...
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 5:09am On Aug 14, 2021 |
Concrete work on the Ground Floor Slab.
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 4:56pm On Aug 15, 2021*. Modified: 5:16pm On Aug 15, 2021 |
We successfully completed the over site concrete works
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 8:03am On Aug 16, 2021 |
We are starting block setting today. We hope to equally start decking works by weekend...
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 1:49pm On Aug 16, 2021 |
Block setting progress report
|
| Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 2:58am On Aug 18, 2021 |
Day one alone we did 1200 block setting. Day 2, 1100 blocks already...
|