Re: The Making Of The "Anambra 7 Bedroom Castle" by michlins(m): 10:50am On May 30, 2022
This house should be very big with the kind of reinforcement I'm looking at here
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:55am On May 31, 2022
michlins:
This house should be very big with the kind of reinforcement I'm looking at here
It's a massive building. Gulping a lot of money and materials too.
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:32am On Jun 01, 2022
We have completed the filling of this foundation, loads of chippings also arrived for the DPC cast of this building.

We are already starting to bring in the ground floor materials for walls, columns and lintels. More pictures later.
Re: The Making Of The "Anambra 7 Bedroom Castle" by KelvinCoaster(m): 5:21pm On Jun 03, 2022
Patiently waiting for more picture uodates...
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:46pm On Jun 03, 2022
KelvinCoaster:
Patiently waiting for more picture uodates...
We have been working here bro, actually speeding up works in all.sites. I will upload more pictures now.
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:48pm On Jun 03, 2022
We have completed the filling of this foundation with soul,

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:51pm On Jun 03, 2022
We are already moving materials for the next stage into this site, blocks, sand, etc.............

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:44pm On Jun 05, 2022
We brought in an earth compaction equipment to walk over this site for the final compaction before we can start the concrete cast............

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:45pm On Jun 05, 2022
After the compaction of the foundation filling.........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:50pm On Jun 05, 2022
Ready for the cast of the DPC............

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:59pm On Jun 05, 2022
Ready to roll...........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:08pm On Jun 05, 2022
Starting the concrete cast proper........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:11pm On Jun 05, 2022
As from tomorrow morning, we will start making final arrangements to start the formation of ground floor walls, we have been buying blocks, sand and chippings for the start of the next stage..............
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 5:56am On Jun 09, 2022
Block walls formation has been ongoing in this house........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:02am On Jun 09, 2022
More walls rising............

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 5:59pm On Jun 10, 2022
We continued to lay blocks on the ground floor level of this beautiful building.......

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:11pm On Jun 10, 2022
Seeing the block laying from inside the building..........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:18pm On Jun 10, 2022
More pictures from the inside.....

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:22pm On Jun 10, 2022
A very large main lounge, mini lounge, and a terrace off the mini lounge..........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:26pm On Jun 10, 2022
A curving passageway around the circular staircase lobby in the middle........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 7:35am On Jun 13, 2022
More work is still going on here, we are working on the lintels of this building...........
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:07pm On Jun 16, 2022
We are at the lintel stage of this beautiful building.........

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:11pm On Jun 16, 2022
More from around the house

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:06pm On Jun 16, 2022
Inside the building.......

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 8:15pm On Jun 16, 2022
More......

Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op):
As seen from the top of the building.........

Re: The Making Of The "Anambra 7 Bedroom Castle" by Rany4all(m): 8:26pm On Jun 16, 2022
I'm still wondering how you achieved that circular wall so perfectly...I mean with straight walls ropes/lines are used, but I just can't think of what could have been used for those curves... grin grin
Weldone Sir!
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:07pm On Jun 16, 2022
Rany4all:
I'm still wondering how you achieved that circular wall so perfectly...I mean with straight walls ropes/lines are used, but I just can't think of what could have been used for those curves... grin grin
Weldone Sir!
I will show how we did it when I return to site next time. grin

Thanks my man.
Re: The Making Of The "Anambra 7 Bedroom Castle" by Rany4all(m): 9:12pm On Jun 16, 2022
spyder880:
I will show how we did it when I return to site next time. grin

Thanks my man.
Can't wait, thanks.
Re: The Making Of The "Anambra 7 Bedroom Castle" by KelvinCoaster(m): 6:17pm On Jun 21, 2022
Engr. Spyder880,
We're still patiently waiting!

How is this project going?
Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 6:12am On Jun 22, 2022
KelvinCoaster:
Engr. Spyder880,
We're still patiently waiting!

How is this project going?
This project is going very nicely. More pictures later.
Re: The Making Of The "Anambra 7 Bedroom Castle" by kindlyheart: 6:15am On Jun 22, 2022
spyder880:
As seen from the top of the building.........
going up fast. great job you're doing