Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,163 members, 7,815,063 topics. Date: Thursday, 02 May 2024 at 06:31 AM

Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG - Politics (2) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG (13808 Views)

700MW Zungeru Hydropower Station Has Started Generating Electricity / 700MW Zungeru Power Project Worth $1.3bn To Be Completed In Q4 2022 / Zungeru Hydroelectric Power Project To Be Completed In December 2021 - FG (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by SmartPolician: 2:00pm On Apr 09
Because Senator Sani called it an abandoned project, suddenly, testing has begun on it grin
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by JoshTim: 2:00pm On Apr 09
WakeUpNigerians:
Another Propaganda for the agbado team grin

Why not confirm first first

1 Like 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Honestfrend: 2:08pm On Apr 09
Too many lies...hope this one is true?
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by BondRiv: 2:10pm On Apr 09
It is 2024, figure out this electricity stuff already and give Nigerians 24 hours power supply.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by swagifted(m): 2:11pm On Apr 09
Paraman:
I can now see why Adelabu said power supply will improve in 6 month.

https://www.premiumtimesng.com/news/more-news/677661-nigerias-electricity-supply-will-improve-within-six-months-minister.html?tztc=1
there need to be serious punishment for vandalism first of all. And for bypasses too.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by nedu666: 2:16pm On Apr 09
blancsn1:
16 years of PDP they couldn't add a single megawatt to the national grid.

So all the nipp gas power plants was built by who? Half education is as bad as no education

3 Likes 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Dobodobo04: 2:18pm On Apr 09
farouk2much:
As big as it is..... But na only 700 mw?

With hydro dams, you can always increase capacity by adding more turbines. 700 MW is the start. I’m sure as time goes by, it can be ramped up.

When Mainstream Energy took over Kainji and Jabba dam, they added more MW to the generating capacity.

I’m sure over time, they will do likewise to this new dam.

This additional 700 should push our generating capacity at full max to about 14,000 MW.

Full max is if all the power generating plants decide to generate at full capacity.

Debt payment according to the minister starts in April, so no excuses and Gencos should ramp up production.

TCN I’m sure is working to modernise it’s infrastructure and make it more robust to transmit power.

3 Likes 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by rinzaugustine: 2:18pm On Apr 09
Golan007:


The news dey pain your papa head.

grin
na you and your mama Agbado empty heads dey always believe rubbish like this
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Dobodobo04: 2:21pm On Apr 09
swagifted:
there need to be serious punishment for vandalism first of all. And for bypasses too.

I agree. If there isn’t a vandalism act by National Assembly, then they should pass the law. It should be made to punish vandals across Nigeria with prison sentence.

1 Like 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Ijaya123: 2:22pm On Apr 09
ggood:
Why must everything be connected to national grid , why can't State generate their own electricity

Write an open letter to your governor asking what he’s doing concerning power in his state so far.

2 Likes 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by swagifted(m): 2:25pm On Apr 09
Dobodobo04:


I agree. If there isn’t a vandalism act by National Assembly, then they should pass the law. It should be made to punish vandals across Nigeria with prison sentence.
since de increased tarrif all my neighbours that always forget to turn off pumping machine when the tank is full all of sudden they don't use to forget again.

2 Likes 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by commoditiesnig: 2:33pm On Apr 09

1 Like 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by khattab02: 2:34pm On Apr 09
dalongjnr:
Another legacy of president Mohammad Buhari
I doubt it.



The project was actually started during Good luck time. Am shocked till now it hasn't been completed.




Naija can waste time on meaningful and important projects ehn

1 Like

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by ArewaNorth: 2:37pm On Apr 09
olisaEze:
Is this part of Buhari/Kyari Siemens deal? because adonundastand what we’re celebrating again six years after the answer to all our energy issues in this country was signed & sealed. grin

Siemens deal is basically for rehabilitation, expansion and upgrading of transmission infrastructure. Tbh, power sector project is one of the most complex work. Its effect can only be felt when fully commissioned. After Siemens deal around 2018, Nigeria gave Siemens energy company the design specifications that can match our grid's peculiarities and the company manufactured the transformers according to that specifications. After manufacturing, Nigerian Engineers have to fly to either France or Italy where the transformers are manufactured to join the company for factory test to ensure that they are fit. Later the transformers are shipped to Nigeria. It takes more than 2 weeks for each of the transformer to be transported from Ikeja TCN store to any location in the North due to the weight and nature of the transformer.
All Siemens transformers are already installed and most of the transformers are already commissioned with few to be commissioned in few days or weeks, so the fact is the first phase of the project is almost completed and this will only increase the transmission capacity of the grid.
However, in as much as Distribution capacity which still remains 5000MW isn't improved which is unlikely in the nearest future all this effort remain futile for now. Again, the generation capacity is still low because if generated the energy can't be distributed by DisCos due to lack of capacity to distribute that Is why we are in this mess.
So Nigeria's energy problem is complex and it takes long time to solve Engineering problem which requires design, manufacturing, civil work among others.

3 Likes

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Cajal(m): 2:39pm On Apr 09
Adelabu has woken up
God bless Nigeria

1 Like 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by pocom16: 2:53pm On Apr 09
ggood:
Why must everything be connected to national grid , why can't State generate their own electricity

Because the state didn't build that Dam

1 Like 1 Share

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by COMPAQ(m): 2:55pm On Apr 09
Inspirer1:
May it be a success

Mathematically,

$1.3 billion project meets approximately 10% of our need
Therefore, 10 X $1.3 billion = $13 billion should be able to meet almost all our electricity need in terms of generation.

I wish they had judiciously used the "$16 billion dollars" back then to fix this our power problem

Lol. I saw that line in the report and its actually wrong. There is no way 700MW meets 10% of our NEED. The issue is the use of the word NEED. Cos estimates put our national need at 25000MW. Maybe he meant to say 10% of available capcity, cos if we had enough gas, as at today we could generate 7000MW

1 Like

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by olisaEze(m): 2:55pm On Apr 09
ArewaNorth:


All Siemens transformers are already installed and most of the transformers are already commissioned with few to be commissioned in few days or weeks, so the fact is the first phase of the project is almost completed and this will only increase the transmission capacity of the grid.


You’re being circumspect with the truth, my broda. According to Chief Adelabu, the Min. Of Power/Energy, the Seimens deal lay moribund for 6 years after the death of Abba Kyari, and has just been renegotiated for the third time, by the BAT administration last year. Out of ten transformers only five have been installed, and out of ten substations only three have been installed. Non is working yet, as they all have to be commissioned and energized before Nigerians can benefit. I don’t know where you’re getting the timeline of days & weeks from as not even the Minister has mentioned any specific dates.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Elidrisy20: 2:57pm On Apr 09
Fake news
I will only believe this news, if I see the minister of power stop using power bank
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by SouthSouth1914: 3:15pm On Apr 09
Obaofaba:
God bless Nigeria.

We'll surely get there.

Asiwaju gat us covered.

This is what the president meant by saying he will continue from where Buhari stopped.

Apart from the military government, which civilian government add 700megawat to our national grid at a go?

Next is mambilla power plant

Remember obasanjo and atiku stole 16billion dollars meant for power.

The military government built Nigeria! Don’t ever make computations! They built the blueprint. Built everything these lazy mofos called politicians (Bunch of psychopaths) present day Nigeria presents.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Offpointng: 3:16pm On Apr 09
allabig:
1000 mw can power 170 houses.
lol.
Mumuish olodo. you think MW is KW eh??

1 Like

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by justmi1: 3:17pm On Apr 09
allabig:
1000 mw can power 170 houses.

lol.

1000mw can power upto 4 small states. 1000mw is 1,000,000,000 Watts 1bn Watts of electricity so do your maths again
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Yampotatocarrot(m): 3:23pm On Apr 09
The more I read what this power minister says, in all ramifications, the more confused I am... From the tariff hike to this news now... Is it that where they live, they actually have constant 24hours light [/b]FROM PHCN[b] without using generator or what?

Since the increase in tariff, our light in this area of Ayobo have gone from bad to worse, as in atimes just 2hrs in a day, and those 2hrs will be broken into 5 minutes each... Whereas, at Gbagada (Soluyi/Powerline), our light for that side don go from better to best... Having 24hrs light for days, except on Sunday that they took it for a while before bringing it back

Abeg, IKEDC, remember Ayobo (Makinde) people
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by COMPAQ(m): 3:23pm On Apr 09
nedu666:


So all the nipp gas power plants was built by who? Half education is as bad as no education

Good answer. Let me also educate some people here. There is this common saying that $16bln power project was a scam and the money was stolen. it actually wasn't. Now not saying that in typical Nigerian fashion, some of the money wasn't stolen, but the popular story that the entire $16bln was stolen is a big lie. How do I know this?

I know this because the power plants were actually built!! The reason why they are not contributing much to the national grid is lack of gas.

If you look at all the NIPP power plants on the right of the picture, you see that some of them with installed capacity of 500 - 600MW are only contributing like 5%. The Niger Delta Power Holding Company was the legal entity set up to manage these projects. The projects are:

https://ndphc.net/generation#

Alaoji Power Plant - Rivers (Alaoji isn't on the NERC data below because its being refurbished or expanded by Chrome Engineering)
Olorunsogo Power Plant - Ondo
Calabar Power Plant (Odukpani) - Cross River
Omoku - Rivers
Omotoso - Ogun
Gbarain - Bayelsa
Ihovbor - Edo
Egbema - Imo
Sapele - Delta
Geregu - Kogi

https://en.wikipedia.org/wiki/Nigerian_National_Integrated_Power_Project

Of course there was more to the $16bln than just power plants. There was also transmission lines, sub stations etc. It was mostly these areas where contractors either didn't deliver or the project was stalled and lots of items lay fallow at the port for many years.

And of course, typical of Nigeria, we didn't plan enough for where the gas would come from!! Nigerian government treated gas as something you just go and buy in the supermarket. Yes Nigeria has plenty of gas in the ground, but the forgot that it has to be drilled for, extracted, processed and sent to these power plants via pipeline. None of that was done, mainly because the domestic price for gas didn't incentivize the IOC's to be drilling for gas and selling it at a loss.

2 Likes

Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Simplemeeeee: 3:24pm On Apr 09
This is Buhari's achievement. He deserve is flowers abeg

Obaofaba:
God bless Nigeria.

We'll surely get there.

Asiwaju gat us covered.

This is what the president meant by saying he will continue from where Buhari stopped.

Apart from the military government, which civilian government add 700megawat to our national grid at a go?

Next is mambilla power plant

Remember obasanjo and atiku stole 16billion dollars meant for power.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by SouthSouth1914: 3:24pm On Apr 09
COMPAQ:


Lol. I saw that line in the report and its actually wrong. There is no way 700MW meets 10% of our NEED. The issue is the use of the word NEED. Cos estimates put our national need at 25000MW. Maybe he meant to say 10% of available capcity, cos if we had enough gas, as at today we could generate 7000MW

Thanks for being vigilant! Nigeria needs more than 250K plus MW of electricity. 7000 doesn’t even meet the demand of a state nor to talk of 10 percent of Nigeria. Propaganda always come back to bite these useless people!
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Austynooa: 3:47pm On Apr 09
Good news
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Bimpe29: 3:48pm On Apr 09
May Allah bless Nigeria.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by liasmiram2567: 3:51pm On Apr 09
ggood:
Why must everything be connected to national grid , why can't State generate their own electricity

Ask the state governments
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by integrity16(m): 3:55pm On Apr 09
SmartPolician:
Because Senator Sani called it an abandoned project, suddenly, testing has begun on it grin

At least this is a government that listens. This project had been there when sani was a senator, what did he do then to accelerate it's completion?? You people should stop being hypocritical.

I pray pray tinubu is able to resolve the legal tussle around mambila plant and then get us to generate enough. With the Siemens deal to take care of transmission and distribution, then we begin to expect stable electricity.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by udomonday: 4:05pm On Apr 09
Why is everything chanelled to the national grid?can't they have mini grids,and serve different areas?the zeregu power plant should serve those in that axis.
Re: Testing Begins On 700MW Zungeru Hydroelectric Power Plant – FG by Inspirer1: 4:29pm On Apr 09
COMPAQ:


Lol. I saw that line in the report and its actually wrong. There is no way 700MW meets 10% of our NEED. The issue is the use of the word NEED. Cos estimates put our national need at 25000MW. Maybe he meant to say 10% of available capcity, cos if we had enough gas, as at today we could generate 7000MW
okayyyy, thanks for the insight

(1) (2) (3) (Reply)

Did Mungo Park Actually Discover River Niger? / Killing Of Christians Will Plunge Nigeria Into War – Northern CAN / South Africa Defies Nigeria On Nigerian Soil

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.