PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI - Properties (14) - Nairaland
Nairaland Forum › Nairaland General › Properties › PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI (98833 Views)
1 2 3 ... 11 12 13 14 15 16 17 ... 44 Reply (Go Down)
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by lafolabi(m): 11:54pm On Jan 09, 2015 |
Keep it up. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by checkfidel: 1:10pm On Jan 10, 2015 |
@segcymoor I am very impressed by what you are doing in the project this far. Just keep it up and keep professionalism as your watch word. Fidel.. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 1:22pm On Jan 10, 2015 |
checkfidel:Thanks bros.....we shall never let you down |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 10:26pm On Jan 10, 2015 |
Block work in progress!
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 4:06pm On Jan 12, 2015 |
segcymoor:
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 4:09pm On Jan 12, 2015 |
segcymoor:In the process
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 11:17pm On Jan 12, 2015 |
MOORE - DESIGNBUILD LTD | We do structure right! |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by pmil(m): 4:34pm On Jan 13, 2015 |
Good work ...ride on segcymoor: |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 10:18am On Jan 14, 2015 |
pmil:Bros. We just dey do am small small |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 3:05pm On Jan 15, 2015 |
In the process
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by lyvin: 8:45am On Jan 16, 2015 |
segcymoor:Pls what does these ratio stand in literal terms ie cement, sand and granite in headpans. Thanks |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 5:20pm On Jan 16, 2015 |
lyvin:1:head pan of cement---2:head pan of (salt less) sharp sand and 3:head pan of granite makes solid conctrete |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 8:06am On Jan 18, 2015 |
Block work in progress!
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 11:10am On Jan 20, 2015 |
segcymoor:
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by lyvin: 4:29pm On Jan 20, 2015*. Modified: 7:41pm On Jan 20, 2015 |
@segcymoor. Thk for the clarification. Pls do u think from experience 40tons of sharp sand ,30tons of granite and 120 bags of cement will be enough to cast 255sq meter dpc. Wht quantity will be ideal. Pele for bothering you o. Am trying to ve idea of cost implication before going ahead |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by twinskenny(m): 8:43pm On Jan 20, 2015 |
segcymoor:good job sir hopefully expecting a call from you soon. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 7:26pm On Jan 21, 2015 |
twinskenny:Yes o .we are getting there |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 10:03am On Jan 22, 2015 |
In the process
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 1:21pm On Jan 27, 2015 |
Slab
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 6:49pm On Jan 28, 2015 |
Columns reinforcement and lintel
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by mufutau55(m): 3:30am On Jan 29, 2015 |
Oga Segcy, can you please recommend a good Split-AC installer? Thanks. Hajji M. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 9:31pm On Jan 29, 2015 |
08025584869 (Taiwo by name) But he reside in Ajah o |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by mufutau55(m): 10:30pm On Jan 29, 2015 |
segcymoor:Boss mi, thank you very much. I quite understood... Thanks again. Hajji M. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 9:00pm On Jan 30, 2015 |
Columns and Lintel casting
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 9:04pm On Jan 30, 2015 |
segcymoor:
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by twinskenny(m): 10:57pm On Jan 30, 2015 |
segcymoor: |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 9:54am On Feb 01, 2015 |
Happy New month! |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Nobody: 2:05pm On Feb 01, 2015 |
[quote author=segcymoor post=30284081][/quote]Ha God bless him. |
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 5:21pm On Feb 04, 2015 |
In the process
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 3:52pm On Feb 06, 2015 |
We are doing what we believe in ....precast concrete fascia!
|
| Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(op): 1:01pm On Feb 10, 2015 |
Penthouse slab
|
Building On Swamp, How Do I Go, Raft Or Pile? • CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI • Picture Of Prostrating Building At Oba Akran Ikeja Lagos • 2 • 3 • 4
How To Practically Calculate The Quantity (m2) Of Roofing Sheet Required • The Making Of The Port Harcourt "Duplex + 4 Flats" • How To Calculate The Quantity Of Tiles Needed; Selecting Tiles & Types.