The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:38pm On Mar 07, 2015 |
the construction of 14 block ube primary school at emuhoa community rviers state. project duration = 3 months starting date = 1st march 2015 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:41pm On Mar 07, 2015 |
site clearance equipment = bulldozer duration of work = 2 days cost of clearance = 200k |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:53pm On Mar 07, 2015 |
pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:07pm On Mar 07, 2015 |
more pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by emmadejust(m): 10:08pm On Mar 07, 2015 |
abdulwastecx Abeg position wella incase there is any running bush meat on d lose..... na weekends tinz oooo 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:11pm On Mar 07, 2015 |
emmadejust: na only be say I still dey fear ebola 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by Dieumerci(m): 10:17pm On Mar 07, 2015 |
Correct guy! |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:19pm On Mar 07, 2015 |
more picture
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:29pm On Mar 07, 2015 |
setting out: material includes the following 1. pegs : 7 boundle @ N1000 = N7, 000 2. profile board = 120 2" x 2" @ N250 = N30, 000 3. line, builder's square, claw hammer, heavy hammer, meter rule = N20, 000 4. miscellaneous = N10, 000 total = N67, 000 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:33pm On Mar 07, 2015 |
setting out picture
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:36pm On Mar 07, 2015 |
more pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:37pm On Mar 07, 2015 |
more 1 Like
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:50pm On Mar 07, 2015 |
setting out procedures 1. establishement of the building line 2. the other corners of the building is set at right angle to the building line using builder's square to get the correct andgle and a meter rule to measure the horizontal distance. allowance is made to allow for sagging of the meter rule. 4. the four cotners of the building is set and pegged. 5. A nail is placed ontop of the four pegs and each ate connected to form a perfect rectangle or square as the case may be. 6. from these four corners, an ofset of 1.2m or 1.5m ( to allow for digging and carting away of excavated material) is allowed from these four corners pegs. 7. The four offsets pegs are nailed an line connected to them to form another perfect rectangle and square as the case may be. 8. across the new line pegs are spaced at 2m c/c fo form a continuous chain of peg to wish profile boards are nailed to form a profile. 9 The structural building plans is transferred carefully to the profile. 10. at each grid line on the drawing a corresponding 5 nails are placed on the profile as follows. the center nail represent the grid, the next two nail represent the width of block while the last two nail represent the width of the foundation 2 Likes |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by mufutau55(m): 4:48am On Mar 08, 2015 |
Good work.. I dey class oh! Learning as usual. Hajji M. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 5:57am On Mar 08, 2015 |
mufutau55: welcome sir |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 5:58am On Mar 08, 2015 |
more pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 5:59am On Mar 08, 2015 |
more
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 6:01am On Mar 08, 2015 |
more |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 6:12am On Mar 08, 2015 |
excavation work. depth of excavation = 900mm width of excabavation = 675mm calculated perimeter of excavation =880m rate of excavation = N500/m expected duration of excavation assuming 40 labourers with capacity of 15m/ day = 880/(15 × 40) = 1.48days. actual excavation perimeter of excavation = 860m( very close to the calculated perimeter) duration of excavation : it took us two days to complete the excavation. the work was completed 2.0pm the next day. cost of excavation = 500 x 860 = N430, 000 logistics = N15, 000 total = N445, 000 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 6:18am On Mar 08, 2015 |
pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by emmadejust(m): 8:35am On Mar 08, 2015 |
abdulwastecx: #neveragain should you fear any plague or diseases in the land.... we are free to enjoy the good of the land and our labour....... Happy Sunday ......!!!! OUR FAITH, OUR REALITY IN LIFE.... |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 11:11pm On Mar 17, 2015 |
it has been a while on nairaland for me...I am back for more update. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by Dieumerci(m): 11:44pm On Mar 17, 2015 |
abdulwastecx:Welcome back sir, eku ewu omo. Olohun abawa wooo! Let the lectures begin. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 11:46pm On Mar 17, 2015 |
foundation footing summary foundation footing 1.thickness of footing = 225mm 2.bags of cement = 380bags 3.trip of sharp sand = 6 4. gravel = 120tonnes 1. No of column type A = 157 size of column type A = 225 x 225mm 2. No of column type B = 450mm diameter column block work 1.quantities of block = 8500 2.cement = 140bags of cement |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 11:47pm On Mar 17, 2015 |
Dieumerci: thank you sir |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by podosci(m): 9:38pm On Mar 20, 2015 |
Update from the ongoing work
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by podosci(m): 9:40pm On Mar 20, 2015 |
abdulwastecx:more pictures
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by podosci(m): 9:41pm On Mar 20, 2015 |
more pictures
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by engrgordon(m): 9:56pm On Mar 20, 2015 |
good job going on here, Kudos..... I love my profession........ Can part of the project be sublet to me? DOUBLE INTEGRATION MULTI-PROJECTS SERVICES(DIMS) , WE BASED IN PORT HARCOURT. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by mufutau55(m): 12:31am On Mar 21, 2015 |
podosci: Welcome back.. I know you have been very busy, so I decided not to bother you.. How is our new girl and the Mummy.. Congrats. Hajji M. |
The future is now; Its yours with N60,000 / Construction and Cost of A 6 Bedroom Duplex In Details And Pictures / New 5 Bedroom Bungalow Architectural Design With Living Room View
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27 |