A Nairanlander's Building Project by abdulwastecx(op): 1:06am On Jun 03, 2015
project location : chokocho, Port Harcourt, Rivers state.
project description : construction of a sewage disposal system soak away/ septic tank, completion of ongoing 6 flat on self contain
job duration : one month.
Re: A Nairanlander's Building Project by amichaelz101(m): 1:07am On Jun 03, 2015
K
Re: A Nairanlander's Building Project by abdulwastecx(op): 1:11am On Jun 03, 2015
the soakaway/septic tank system
Due to land constrain the septic tank has a dimension of 7ft x 15ft x 10ft, the dimension of pit dug to accommodate this structure was 10ft x 186ft x 12ft. the extral dimension was to allow for ease of work and movement into the system.

Material for the soak away/septic tank includes the following
1. 3/8 sharp sand as both the coarse and fine aggregates in the concrete
2. dangote portland cement
3. High yield bar of 12mm as main reinforcement and 10mm bar as links
4. soft plank as formwork
Re: A Nairanlander's Building Project by abdulwastecx(op): 1:15am On Jun 03, 2015
procedure
1. the pit digging was done manually by 3 men for a period of three days at a cost of N35,000. we encountered some problem due to rainfall and the poor strength of the soil.
2. Due to anticipated poor bearing capacity of the soil, a raft beam was used as the foundation of the soak away, this cost was not allowed for during the planning process for the job

Re: A Nairanlander's Building Project by abdulwastecx(op): 1:27am On Jun 03, 2015
Iron work for the raft beam :
12nr of Y12 was use @ N1,200/nr = N14,400
4nr of Y10 was use as links @ N1,000/nr = N4,000

Iron work For the six supporting column
the height of the column is 3m
8Y12 was used as main reinforcement = N9,600
4Y10 was used as the link = N4,000
binding wire = N3,500
Total on material = N35,500
Re: A Nairanlander's Building Project by HzRF(m): 1:28am On Jun 03, 2015
Gud one. Keep it up
Re: A Nairanlander's Building Project by abdulwastecx(op): 1:34am On Jun 03, 2015
the making of the raft beam foundation for the soakaway foundation:
8bags of cement was used for the casting @ N2,100/nr = N 16,000
four plank of wood @ N1,000/nr = N4,000
total = N20,000

workmanship:
2 nr of iron bender @ N4,000/nr = N8,000
3 labour @ N2,000/nr = N6,000

Re: A Nairanlander's Building Project by abdulwastecx(op): 1:45am On Jun 03, 2015
completion of the soakaway foundation

Re: A Nairanlander's Building Project by abdulwastecx(op): 1:49am On Jun 03, 2015
laying of block

Re: A Nairanlander's Building Project by abdulwastecx(op): 1:51am On Jun 03, 2015
More block work

Re: A Nairanlander's Building Project by abdulwastecx(op): 2:01am On Jun 03, 2015
mid way beam to improve the strength

Re: A Nairanlander's Building Project by abdulwastecx(op): 2:03am On Jun 03, 2015
complete block wall of the soak away

Re: A Nairanlander's Building Project by mufutau55(m): 2:30am On Jun 03, 2015
Wow! Good work. I am following keenly.
Some of this Clients are lucky to have you as their Builder.. You are a good teacher too..

Hajji M.
Re: A Nairanlander's Building Project by abdulwastecx(op): 2:31am On Jun 03, 2015
mufutau55:
Wow! Good work. I am following keenly.
Some of this Clients are lucky to have you as their Builder.. You are a good teacher too..

Hajji M.
thank you sir...
Re: A Nairanlander's Building Project by Nobody: 3:21am On Jun 03, 2015
Nice one
Re: A Nairanlander's Building Project by caesaraba(m): 8:06am On Jun 03, 2015
Nice. Following.
Re: A Nairanlander's Building Project by iCool(m): 3:26pm On Jun 07, 2015
Very detailed with pictures, I LOVE the part where you give details of the pricing. Good Work!
Re: A Nairanlander's Building Project by abdulwastecx(op): 9:17am On Jun 13, 2015
here is the completion of the soak away/septic tank work

Re: A Nairanlander's Building Project by abdulwastecx(op): 9:25am On Jun 13, 2015
The second face of the job involve the completion of the six units of one room self contain each.
A three dimension model was produce to guild the completion work

Re: A Nairanlander's Building Project by abdulwastecx(op):
we finally settled for the second one.

The first activity involve the removal of the poorly done front arch.
The following reasons necessitate for the removal
1. Heavy cracking of the block below the arch due to absence of supporting columns
2. poor workmanship

Re: A Nairanlander's Building Project by Nobody: 10:05am On Jun 13, 2015
abdulwastecx:
here is the completion of the soak away/septic tank work
@ abdulwastecx: Sorry, I missed the part where you did the cost of materials for casting the top part of the tank.
Plus, can the reinforcement stand the weight of a vehicle?
The steel rods there don't look like 12mm to me oh!
Can you please enlighten me.
Re: A Nairanlander's Building Project by MANGAM(m): 10:08am On Jun 13, 2015
Neat work, and I like ur detailed explanation
Re: A Nairanlander's Building Project by abdulwastecx(op): 2:15pm On Jun 13, 2015
ijapa888:
@ abdulwastecx: Sorry, I missed the part where you did the cost of materials for casting the top part of the tank.
Plus, can the reinforcement stand the weight of a vehicle?
The steel rods there don't look like 12mm to me oh!
Can you please enlighten me.
The main bar was 12mm spaced at 200mm center to center while the distribution bar was 10mm spaced at 250mm center to center. The aim of the job is not to allowed vehicle to pass over it but for the side of the wall to resist the overburden soil pressure which may result from moving vehicle adjacent to the wall.
Re: A Nairanlander's Building Project by abdulwastecx(op): 2:28pm On Jun 16, 2015
continuation of the repair work...

Re: A Nairanlander's Building Project by abdulwastecx(op):
continuation of the work:The first task was the completion of the front arch

Re: A Nairanlander's Building Project by abdulwastecx(op): 12:28am On Jun 26, 2015
here is the roofing work
wood type :
2 x 4 hard wood of 18ft length
2 x 4 hard wood of 12ft length
2 x 3 hard wood purline of 12ft length
1 x 10 facial board 0f 11ft lenth
4'' and 3'' nail
Wood treatment chemical

description of the roofing
spacing wooden roof truss = 4ft center to center
height of the king post = 10ft (3m)

Re: A Nairanlander's Building Project by abdulwastecx(op): 12:34am On Jun 26, 2015
more pics

Re: A Nairanlander's Building Project by mufutau55(m): 1:49am On Jun 26, 2015
abdulwastecx:
here is the roofing work
Wow! Your favorite. smiley

Hajji M.
Re: A Nairanlander's Building Project by princejones(m): 4:35am On Jun 26, 2015
Nice job my guy and pray for more jobs and contracts for we young contractors and building engineers
Re: A Nairanlander's Building Project by abdulwastecx(op): 9:28am On Jun 27, 2015
princejones:
Nice job my guy and pray for more jobs and contracts for we young contractors and building engineers
amin sir
Re: A Nairanlander's Building Project by abdulwastecx(op): 9:28am On Jun 27, 2015
mufutau55:
Wow! Your favorite. smiley

Hajji M.
yes sir..long time sir
Re: A Nairanlander's Building Project by abdulwastecx(op): 10:58am On Jun 29, 2015
continuation of the roof