what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 9:48pm On Mar 29, 2016
Please what stage can 4million do for someone that want to build 3 bedroom of 4 flats....please I need sincere replies
Re: what stage can 4m get to for a 3bedroom of 4 flats by Nobody: 10:51pm On Mar 29, 2016
Roofing....it shud cover the haus depending on the roofing sheet u wanna use tho
Re: what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 12:56am On Mar 30, 2016
Please are you saying 4m will get to roofing for a 3bedroom of 4 flats....please can explain more
Re: what stage can 4m get to for a 3bedroom of 4 flats by achinaboy(m): 1:03am On Mar 30, 2016
can you explain what you meant by 3bedrooms of 4flats,
Re: what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 1:09am On Mar 30, 2016
A story building that consists of four flats with each flat having A 3bedroom
Re: what stage can 4m get to for a 3bedroom of 4 flats by segcymoor(m): 1:35am On Mar 30, 2016
Rooneyunited:
A story building that consists of four flats with each flat having A 3bedroom
Depends on the type of foundation


Raft:May not even complete the entire foundation especially if the height is more than 3 boards

Strip: Conveniently at decking level (I.e before decking

Pilling: Probably Pilling and pile cap......depends on the depths

We are talking from wealth of experience!
Re: what stage can 4m get to for a 3bedroom of 4 flats by eghosajohnny: 3:55am On Mar 30, 2016
Rooneyunited:
Please what stage can 4million do for someone that want to build 3 bedroom of 4 flats....please I need sincere replies
First the location and if the land is dry and level enough

Then foundation,2.2m
From foundation to decking level,1.7m


Thaats how fr it can go
Re: what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 11:09am On Mar 30, 2016
Please I need more professional advice on this issue...
Re: what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 10:58pm On Mar 30, 2016
Please I need more replies on my question...please n its very urgent
Re: what stage can 4m get to for a 3bedroom of 4 flats by olawale100: 3:11pm On Jun 09, 2016
The best approach is to share the dimension of the Block of flats.

I will probably suggest between 24m - 26m length and width of 14m to 16m

The soil type will determine the foundation to be applied.

If it is raft, and depending on the height, you will barely fix the ground beams.

The funds may not cover filling and slab.

The ground beam breakdown, about 8 tonnes of reinforcement @ 140,000 = 1,120,000

Cement 250 bags @ 1600 = 400k, granite (2 trips) = 270,000, sharp sand / stone dust = estimated 270,000

Woods for formwork (nails, binding wire)= boards and 2 by 3 = 600,000

Labour for casting, iron bender, carpenter

***** Please note, these are just estimates

Omo...4M don finish be dat o
Re: what stage can 4m get to for a 3bedroom of 4 flats by Rooneyunited(op): 12:11am On Jul 27, 2016
I have a land to start up the building of 3 bedroom of four flats....how much will it cost me from foundation to decking...I want to start as soon as possible
1 Reply

Construction Of A 3bedroom Bungalow @ogun StateConstruction Of A 3bedroom Of 2flats.Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction234

Land For Sale In IbadanLands Available At Way And Life Concept LimitedHectares Of Land @ Eti - Osa Lekki With C Of O.