Construction Of A Low Cost Three Bedroom bungalow In Suleja - Properties (5) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of A Low Cost Three Bedroom bungalow In Suleja (42144 Views)

Soldiers Demolish Old Barracks In Suleja, Niger State (Photos) / Construction Of A 4-bedroom Bungalow For My Mom...all Bedroom Ensuite. / Construction Of My 3bedroom Flat All Ensuite (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by mrayosexy: 12:21am On Apr 21, 2016
HELLO SIR,

PLEASE IN A ROUGH PRICE, HOW MUCH IS IT TO COMPLETE A 3 BEDROOM BUNGALOW IN IBADAN OYO STATE.

1 BEDROOM EN-SUITE
2 AVERAGE BEDROOMS WITH A TOILET AND BATHROOM IN THE MIDDLE
KITCHEN AND OTHERS. SOMETHING VERY MODERATE.
SOMETHING SIMILAR TO THE ONE YOU ARE BUILDING IN SULEJA


AM JUST AN AVERAGE SALARY EARNER BUT I WANT TO START BUILDING MY OWN HOUSE.

CAN YOU ALSO WORK/BUILD IN IBADAN AS WELL.

KIND REGARDS
AY.
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 10:16pm On Apr 21, 2016
mrayosexy:
HELLO SIR,

PLEASE IN A ROUGH PRICE, HOW MUCH IS IT TO COMPLETE A 3 BEDROOM BUNGALOW IN IBADAN OYO STATE.

1 BEDROOM EN-SUITE
2 AVERAGE BEDROOMS WITH A TOILET AND BATHROOM IN THE MIDDLE
KITCHEN AND OTHERS. SOMETHING VERY MODERATE.
SOMETHING SIMILAR TO THE ONE YOU ARE BUILDING IN SULEJA


AM JUST AN AVERAGE SALARY EARNER BUT I WANT TO START BUILDING MY OWN HOUSE.

CAN YOU ALSO WORK/BUILD IN IBADAN AS WELL.

KIND REGARDS
AY.

Yes sir, I can work and build in ibadan too.
The estimate will depend on your building plans

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by mrayosexy: 12:03am On Apr 22, 2016
Can i have your number pls... so we can discuss further...thanks
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 8:35pm On Apr 22, 2016
mrayosexy:
Can i have your number pls... so we can discuss further...thanks

Yes sir... Here is my number :08169492682
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by udy4real(m): 7:53pm On Apr 29, 2016
abdulwastecx:


Yes sir... Here is my number :08169492682


Pls is this also ur whatsapp number?
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 11:19pm On Apr 29, 2016
udy4real:



Pls is this also ur whatsapp number?

Yes sir
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 12:35pm On May 01, 2016
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 12:43pm On May 01, 2016
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:16pm On May 01, 2016
Here is the third stage of the work : this stage involve the following activities
1. formwork to first floor beam and slab (decking)
2. first floor slab reinforcement details
3. electrical conduit pipes
4. waste pipe conduit work
5. casting of first floor slab work

DECKING WORK DURATION: 14 days 4/22/16 TO 5/5/16

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:27pm On May 01, 2016
a mistake

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:28pm On May 01, 2016
ok
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Memejem: 1:43pm On May 01, 2016
I thought this was a bungalow? What's the reason for decking?

abdulwastecx:
More updates
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:54pm On May 01, 2016
Memejem:
I thought this was a bungalow? What's the reason for decking?



it was a mistake.. the decking is for another work.
i will remove them now
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by smiley001(m): 2:09pm On May 01, 2016
abdulwastecx:

it was a mistake.. the decking is for another work. i will remove them now
I suspected as much, I knew it was for another thread.
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by einsteino(m): 8:52am On May 08, 2016
podosci:
It's about 245mb.....i would upload it into my onedrive later tonight and drop a link for you to download.

Please is the link ready? I have a hard copy of the book but i desperately need the soft copy too.
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by podosci(m): 9:55am On May 08, 2016
einsteino:


Please is the link ready? I have a hard copy of the book but i desperately need the soft copy too.
Send me a mail, i would find a way to send it via dropbox or onedrive
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by vkon2(m): 5:13pm On May 09, 2016
NICE WORK Sir, pls I will watsap you
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by chubbyG(m): 10:59pm On Jun 08, 2016
abdulwastecx:
Compaction of filled to achieve a very rigid foundation.
The compaction was done by water g the foundation for ten hours after which a very heavy manually made rammer is used to compact the foundation to the required level

Rabiu??
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Larwin(m): 10:12am On Jun 18, 2016
Seriously have learnt a lot. I am a geoscientist, in case you need a borehole drilling for your sites try and get in touch.
08060288869
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 10:23am On Jun 18, 2016
Larwin:
Seriously have learnt a lot. I am a geoscientist, in case you need a borehole drilling for your sites try and get in touch.
08037010771 /08060689660

Ok I will add you up
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Larwin(m): 11:19am On Jun 18, 2016
abdulwastecx:


Ok I will add you up
Ailt, will be expecting.
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Coolgent(m): 11:50am On Jun 18, 2016
abdulwastecx:


Formwork is a is a platform use to enclose concrete in a civil engineering/building construction. it is a temporary structure that serve the above listed purpose a d it is removed (striking) after the concrete as set.

For this foundation, the Formwork is that wood that is nailed to the edges round to get a reasonable height, level and to hold back the concrete.

Dpc is an oversite concrete that is part of foundation but place at an height above ground level.
Sir is dpc most on rocky site like this?

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 8:06pm On Jun 18, 2016
Coolgent:

Sir is dpc most on rocky site like this?

It is nice you do it

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Coolgent(m): 11:27pm On Jun 18, 2016
abdulwastecx:


It is nice you do it
Ok thank u sir
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Juokorow(m): 3:45pm On Jun 29, 2016
abdulwastecx:


That should be DPM (damp proof membrane). It is use to prevent from rising through the foundation

As you may tell, I am going through this entire thread once more (now that I'm better introduced to Naija building basics), picking gem nuggets from your exceptional knowledge and experience. Why is it that:
1. DPM sheets are not joined with a special masking tape on most projects, and
2. DPM is not used for footings
....... as per recommended best practice in USA?

Thanks!
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 5:16pm On Jun 29, 2016
Juokorow:


As you may tell, I am going through this entire thread once more (now that I'm better introduced to Naija building basics), picking gem nuggets from your exceptional knowledge and experience. Why is it that:
1. DPM sheets are not joined with a special masking tape on most projects, and
2. DPM is not used for footings
....... as per recommended best practice in USA?

Thanks!

Qtn 1: we normally join our DPM with the nail because masking tape can't really join wet polythene. But it will be a good ideas to use masking tape for subsequent job.

Qtn 2 : footings are funded on blinding of 75mm and cover of 50mm, these elements help to protect the footings reinforcement and rendered the need for DPM useless, except for areas with relative high water table
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 2:35pm On Jul 29, 2016
abdulwastecx:
More block work updates
Nice thread, great job.
Please, what's the meaning of that thing written on the wall with red paint?

1 Like

Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 2:56pm On Jul 29, 2016
laideh:


Nice thread, great job.

Please, what's the meaning of that thing written on the wall with red paint?

Stop work
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 3:00pm On Jul 29, 2016
abdulwastecx:

Stop work
Why?
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 3:07pm On Jul 29, 2016
abdulwastecx:

Stop work
Please, why?
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 3:29pm On Jul 29, 2016
laideh:


Please, why?

It is the work of developmental control... The building wasn't approved before we start the work
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 4:40pm On Jul 29, 2016
abdulwastecx:


It is the work of developmental control... The building wasn't approved before we start the work

So, what to do next?

(1) (2) (3) (4) (5) (6) (Reply)

Building A 2 Bedroom Flat / Collapsed Ikoyi Building Was Going For N2.85 Billion Per Apartment / New 10 Flats Of 2 Bedrooms Construction In Onitsha City

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.